Monday 11th August
Process changes
- Timeline should include testing with frontend integration
- Timeline should be given with complete understand of what needs to be done
- Acceptance criteria is nothing but checklist for release from development
- We should not miss any acceptance criteria while releasing -> this is the basic of release
- Requirements gets added newly while development
- Are QAs giving the explicit requirements while doing the story telling? -> should we miss it or not, if yes then we need to take it in next relase.
- Only owner of the release and owner of the environment can merge/deploy code to the respective environment.
- Owner can check it with local demo or qa demo or dev env demo for everything to make sure whatever we're merging/pushing is stable.
- Release owner needs to set up a demo meeting with two days in advance so that we can get the bandwidth if there are some issues.
- If its blocker/failing, and you know it, then fix it just get everyone onboarded by a slack channel message over technology or preprod channel
- PMs will be conducting every week demos with ongoing releases, and tracking their observations, and keeping the notes of it.
- if there are some tickets/user stories which are interdependent what should we do in the PM demos.
- make sure whatever we're demoing is fulfilling the acceptance criteria.
- A QA while writing the defect/bug, should check thorough and share the complete defect/bug details this is only for staging environment
- For Preprod/Mercury, QA Should do a complete RCA Document for each issue/defect, set up a meeting with all stakeholders to get them onboraded, and then make a plan of fix. -> This will take place once we've released the current v2.0 to the production environment.
- Technical feasibility sometimes miss the requirements, how can we tackle this issue? -> GS