Skip to main content

Read Cycle Management (MX02US02)

Read Cycle Management - Comprehensive Test Suite (MX02US02)

Executive Summary

Project: Utility Meter Compass - Read Cycle Management
User Story: MX02US02
Test Suite Version: 1.0
Created Date: January 28, 2025
Target Customer: Small & Medium Utilities
Platform: Web Application (Chrome Browser)

Test Coverage Overview

  • Total Test Cases: 12 (10 Functional + 2 API)
  • Critical Test Cases: 7 (P1 Priority)
  • Performance Benchmarks: API < 1s, Page Load < 3s
  • Integration Points: CX, MX, ONB, Mobile App
  • Automation Coverage: 65% planned automation

Test Scenario Analysis

A. Functional Test Scenarios Summary

Category

Scenarios

Priority

Business Impact

Core Functionality

4 scenarios

P1-Critical

Revenue Impact High

Business Rules

3 scenarios

P2-High

Compliance & Validation

Integration

3 scenarios

P1-Critical

System Dependencies

Performance

2 scenarios

P2-High

User Experience

B. Risk Assessment Matrix

Risk Area

Probability

Impact

Mitigation

Test Cases

Real-time Data Sync

Medium

High

Automated monitoring

TC_002, TC_006

Mobile Integration

Low

Critical

Comprehensive testing

TC_009, API_002

System Integration

Medium

Critical

Dependency testing

TC_006, TC_008

Performance Degradation

Low

High

Load testing

TC_007


Detailed Test Cases

TC_001: Create Basic Read Cycle - Happy Path [CRITICAL]

Test Case Metadata

Test Case ID: MX02US02_TC_001
Title: Create Read Cycle with Valid Basic Information - End to End Flow
Created By: QA Automation Team
Created Date: January 28, 2025
Version: 1.0
Last Updated: January 28, 2025

Classification & Tagging

Module/Feature: Read Cycle Creation
Test Type: Functional End-to-End
Test Level: System Integration
Priority: P1-Critical
Execution Phase: Smoke Testing
Automation Status: Planned-for-Automation
Estimated Automation Effort: 8 hours

Enhanced Tags for 17 Reports Support

Tags: MOD-ReadCycle, P1-Critical, Phase-Smoke, Type-E2E-Functional, Platform-Web, 
      Report-Engineering, Report-Product, Report-QA, Customer-SMB-Medium, 
      Risk-High, Business-Critical, Revenue-Impact-High, Integration-CX-MX-ONB, 
      Mobile-Dependency, Core-Feature, Daily-Execution

Business Context

Customer_Segment: Small & Medium Utilities
Revenue_Impact: High (Core billing dependency)
Business_Priority: Must-Have
Customer_Journey: Daily Operations - Core Workflow
Compliance_Required: No
SLA_Related: Yes (< 3s page load, < 1s API response)
Feature_Category: Core Business Logic

Quality & Performance Metrics

Risk_Level: High
Complexity_Level: Medium
Expected_Execution_Time: 8 minutes
Reproducibility_Score: High
Data_Sensitivity: Medium (Consumer PII)
Failure_Impact: Critical (Blocks read cycle operations)
Performance_Baseline: Page load < 3s, API calls < 1s

Coverage Tracking

Feature_Coverage: 100% of basic creation workflow
Integration_Points: CX (Consumer Data), MX (Meter Inventory), ONB (Area Validation)
Code_Module_Mapped: ReadCycleController, RouteService, MeterDashboardService
Requirement_Coverage: Complete (AC-1, AC-2, AC-7, BR-1, BR-2, BR-6)
Cross_Platform_Support: Web Primary, Mobile Secondary
Business_Rule_Coverage: Unique naming, route validation, duration limits

Stakeholder Reporting Matrix

Primary_Stakeholder: Product Management
Secondary_Stakeholders: Engineering, Customer Success
Report_Categories: Quality-Dashboard, Module-Coverage, Business-Critical-Features, 
                  Daily-Smoke-Results, Customer-Impact-Tracking
Trend_Tracking: Yes (Daily execution trends)
Executive_Visibility: Yes (Critical path feature)
Customer_Impact_Level: High (Direct operational impact)
SLA_Monitoring: Yes (Performance benchmarks)

Requirements Traceability

Test Environment Configuration

Environment: Staging Environment
Browser/Version: Chrome 115+ (Primary), Firefox 110+ (Secondary)
Device/OS Configuration: 
  - Primary: Windows 10/11 Desktop
  - Secondary: macOS 12+ Desktop
Screen_Resolution: 1920x1080 (Primary), 1366x768 (Secondary)
Network: Standard corporate network (>10Mbps)

System Dependencies

External Dependencies:
  - CX Service: Customer data API (health check required)
  - MX Service: Meter inventory API (health check required) 
  - ONB Service: Area/sub-area validation (health check required)
  - Database: PostgreSQL cluster (read/write access)
Performance_Baseline: API response < 1s, Page load < 3s
Fallback_Strategy: Graceful degradation with error messages

Test Data Requirements

User Account: 
  - Username: supervisor.test@utilitycompany.com
  - Role: Meter Reading Supervisor
  - Permissions: Full read cycle management access

Master Data Setup:
  - Areas: Downtown District, North Residential, Industrial Zone
  - Sub-Areas: Commercial Zone A, Residential Block 1, Manufacturing District
  - Utility Services: Water, Electricity, Gas
  - Routes: Minimum 5 routes with 20+ meters each
  - Meters: Mixed conditions (Normal, Faulty, RCNT, Disconnected)

Test Cycle Data:
  - Read Cycle Name: "Test Cycle - April 2025 Downtown Commercial"
  - Area: "Downtown District" 
  - Sub Area: "Commercial Zone A"
  - Utility Service: "Water"
  - Cycle Duration: 30 days
  - Routes to Select: 3 routes (Downtown Route A, B, C)
  - Expected Total Meters: ~80 meters

Prerequisites & Setup

Setup_Requirements:
  1. User authenticated as Meter Reading Supervisor
  2. All external services (CX, MX, ONB) operational
  3. Test routes configured with active meters
  4. Database in clean state (no conflicting test data)
  5. Browser cache cleared
  
User_Roles_Permissions: Meter Reading Supervisor with full CRUD access
Prior_Test_Cases: 
  - Login functionality verified
  - Dashboard accessibility confirmed
  - Master data validation completed

Detailed Test Procedure

Step

Action

Expected Result

Test Data

Validation Points

Comments

Setup Phase






1

Navigate to Utility Meter Compass login

Login page loads within 3 seconds

URL: /auth/login

Page elements visible, no JS errors

Performance baseline

2

Login with supervisor credentials

Successful authentication, redirect to dashboard

supervisor.test@utilitycompany.com

User session established

Security validation

3

Verify dashboard accessibility

Dashboard loads with metrics visible

N/A

Active/Completed/Delayed counters displayed

Baseline state capture

Read Cycle Creation Flow






4

Click "Read Cycles" in navigation menu

Read Cycles page loads within 3 seconds

N/A

Page title, breadcrumb, create button visible

Navigation functionality

5

Capture initial dashboard metrics

Note current Active/Completed/Delayed counts

Record: Active=X, Completed=Y, Delayed=Z

Baseline for increment validation

State tracking

6

Click "Create Read Cycle" button

Create form modal/page opens

N/A

All form fields visible, validation ready

Form initialization

Basic Information Entry






7

Enter Read Cycle Name

Field accepts input, no validation errors

"Test Cycle - April 2025 Downtown Commercial"

Text entered correctly, unique name validation

Uniqueness check

8

Select Area from dropdown

Dropdown populates, selection triggers sub-area refresh

"Downtown District"

Sub-area dropdown updates, dependent field logic

Cascading dropdown

9

Select Sub Area

Sub-area filtered by area selection

"Commercial Zone A"

Correct filtering, selection accepted

Data dependency

10

Select Utility Service

Service selection locked after choosing

"Water"

Selection confirmed, field becomes non-editable

Business rule

11

Enter Cycle Duration

Numeric field accepts valid range

30

Value accepted, no validation error

Range validation

12

Verify form validation state

All required fields completed, no errors

N/A

Form ready for route selection

Validation summary

Route Selection & Real-time Updates






13

View Available Routes table

Routes displayed with accurate meter counts

N/A

Route names, read types, meter counts visible

Data loading

14

Verify Meter Dashboard initial state

System-wide metrics displayed correctly

Expected: 850 total meters

Baseline metrics accurate

Data accuracy

15

Select first route (Downtown Route A)

Route selected, dashboard updates immediately

Downtown Route A (32 meters)

Checkbox checked, cycle metrics update

Real-time calculation

16

Verify meter dashboard update

"Meters in This Cycle" shows 32

Cycle meters: 32

Real-time calculation accurate

Dynamic update

17

Select second route (Downtown Route B)

Dashboard shows cumulative total

Downtown Route B (24 meters)

Total cycle meters: 56 (32+24)

Additive calculation

18

Select third route (Downtown Route C)

Dashboard shows final total

Downtown Route C (29 meters)

Total cycle meters: 85 (32+24+29)

Cumulative total

19

Verify meter conditions breakdown

Normal/Faulty/RCNT/Others counts display

Based on selected routes

Condition distribution accurate

Detailed metrics

20

Verify meter categories breakdown

Residential/Commercial/Industrial counts

Based on selected routes

Category distribution accurate

Classification metrics

21

Verify consumer metrics

Active/Inactive/Disconnected counts

Based on selected routes

Consumer totals accurate

Consumer tracking

Read Cycle Summary Validation






22

Review Read Cycle Summary panel

Summary shows correct totals

Routes: 3, Meters: 85, Duration: 30 days

All calculations match selections

Summary accuracy

23

Verify Selected Routes counter

Shows "Selected Routes (3)"

3 routes selected

Counter matches actual selections

Selection tracking

24

Validate all data consistency

Cross-check all displayed metrics

All dashboard data

No discrepancies in calculations

Data integrity

Read Cycle Creation Completion






25

Click "Create Read Cycle" button

Success message appears, processing initiated

N/A

Loading indicator, then success message

User feedback

26

Verify redirect to cycle details

Redirected to new cycle's detail view

N/A

Cycle details page loads with correct data

Navigation flow

27

Validate cycle details accuracy

All entered data displayed correctly

All previous inputs

Data persistence validated

Data accuracy

28

Check reading period display

Current date range shown prominently

Apr 1 - Apr 30, 2025

Date calculation correct

Date logic

Post-Creation Validation






29

Navigate back to Read Cycles list

New cycle appears in table

N/A

Cycle listed with correct metadata

List integration

30

Verify dashboard counter update

Active Cycles counter increased by 1

Previous count + 1

Counter increment confirmed

State update

31

Check audit trail entry

Creation logged with timestamp and user

User: supervisor.test, Action: Created

Audit entry accurate

Audit logging

32

Verify route assignment

Selected routes no longer available for other cycles

Routes A, B, C

Route exclusivity enforced

Business rule

Comprehensive Verification Points

Primary Verification (Pass/Fail Criteria)

✅ Read cycle created successfully with unique name
✅ All selected routes assigned exclusively to new cycle
✅ Dashboard counters updated accurately (Active Cycles +1)
✅ Cycle appears in list view with correct metadata
✅ Real-time meter calculations performed accurately throughout selection
✅ All business rules enforced (unique naming, duration limits, route exclusivity)

Secondary Verifications (Quality Assurance)

✅ Page load times < 3 seconds for all pages
✅ API response times < 1 second for all calls
✅ Real-time updates complete within 2 seconds
✅ No JavaScript errors in browser console
✅ Audit trail entry created with correct timestamp and user
✅ Integration with CX/MX/ONB systems successful
✅ Mobile app receives cycle data for field operations
✅ All form validations working correctly
✅ User experience smooth with appropriate loading indicators

Negative Verifications (Should NOT occur)

❌ Duplicate cycle names should be rejected
❌ Routes should not be assignable to multiple active cycles
❌ Invalid duration values should be rejected
❌ System should not allow creation with zero routes selected
❌ Dashboard metrics should not show incorrect calculations
❌ Page should not become unresponsive during creation
❌ Data should not be lost during form submission

Performance Validations

⏱️ Initial page load: < 3 seconds
⏱️ Route selection response: < 1 second  
⏱️ Dashboard update time: < 2 seconds
⏱️ Form submission processing: < 3 seconds
⏱️ Database query response: < 500ms
⏱️ Integration API calls: < 1 second each

Integration Validations

🔗 CX System: Consumer data synchronized
🔗 MX System: Meter inventory accurate
🔗 ONB System: Area/sub-area validation successful
🔗 Mobile App: Cycle data available for field readers
🔗 Database: All data persisted correctly
🔗 Audit System: Complete activity trail logged

Test Results Template

Execution_Status: [Pass/Fail/Blocked/Not-Tested]
Execution_Date: [Date of test execution]
Executed_By: [Tester name/automation system]
Execution_Time: [Actual time taken in minutes]
Browser_Used: [Chrome version, Firefox version, etc.]
Environment: [Staging/Production/Dev]

Performance_Results:
  - Page_Load_Time: [X.X seconds]
  - API_Response_Times: [List of times]
  - Real_Time_Updates: [X.X seconds]
  
Integration_Results:
  - CX_Service_Status: [Success/Failure]
  - MX_Service_Status: [Success/Failure]  
  - ONB_Service_Status: [Success/Failure]
  - Mobile_Sync_Status: [Success/Failure]

Defects_Found: [Bug IDs if issues discovered]
Screenshots_Evidence: [Paths to evidence files]
Additional_Notes: [Any relevant observations]

Test Execution Analytics

Execution_Frequency: Daily (Smoke test suite)
Maintenance_Effort: Low (Stable test case)
Automation_ROI: High (Critical path, frequent execution)
Automation_Complexity: Medium (UI interactions + API validations)
Expected_Failure_Rate: < 2% (Stable functionality)

Test Relationships & Dependencies

Blocking_Tests: 
  - User authentication and login
  - Master data setup validation
  - System health checks

Blocked_Tests:
  - MX02US02_TC_002 (Route Selection Validation)
  - MX02US02_TC_004 (Read Cycle Scheduling)
  - MX02US02_TC_005 (Audit Trail Verification)

Parallel_Execution: 
  - Can run in parallel with other modules' tests
  - Cannot run parallel with other read cycle tests (data conflicts)

Sequential_Dependencies:
  - Must run before: Edit cycle, Delete cycle, Schedule cycle tests
  - Should run after: System setup and health check tests

TC_002: Route Selection with Real-time Dashboard Updates [CRITICAL]

Test Case Metadata

Test Case ID: MX02US02_TC_002
Title: Validate Real-time Meter Dashboard Updates During Route Selection Process
Created By: QA Automation Team
Created Date: January 28, 2025
Version: 1.0

Classification & Tagging

Module/Feature: Route Selection & Real-time UI Updates
Test Type: Functional Integration
Test Level: Integration Testing
Priority: P1-Critical
Execution Phase: Regression Testing
Automation Status: High Priority for Automation

Enhanced Tags for 17 Reports Support

Tags: MOD-RouteSelection, MOD-RealTimeUpdates, P1-Critical, Phase-Regression, 
      Type-Integration-UI, Platform-Web, Report-Engineering, Report-Product, 
      Customer-All-Utilities, Risk-Medium, Business-High, Revenue-Impact-Medium, 
      Integration-MX-Real-time, Performance-Sensitive, UI-Responsiveness

Business Context

Customer_Segment: All Utility Companies
Revenue_Impact: Medium (Affects operational efficiency)
Business_Priority: Must-Have (Core UX feature)
Customer_Journey: Daily Operations - Route Planning
Compliance_Required: No
SLA_Related: Yes (< 2s real-time updates)

Quality Metrics

Risk_Level: Medium
Complexity_Level: High (Real-time calculations)
Expected_Execution_Time: 10 minutes
Reproducibility_Score: High
Data_Sensitivity: Low
Failure_Impact: High (Poor user experience)
Performance_Baseline: UI updates < 2s, No UI freezing

Test Environment & Dependencies

Environment: Staging
Browser/Version: Chrome 115+
Dependencies: MX Service (Meter data), Test routes with varied meter counts
Performance_Requirements: Real-time updates < 2 seconds
Test_Data: Routes with different meter counts, conditions, and categories

Prerequisites

1. User logged in as Meter Reading Supervisor
2. Navigate to Create Read Cycle form
3. Basic information fields completed
4. Available routes table displayed
5. Initial meter dashboard showing system-wide metrics

Detailed Test Procedure

Step

Action

Expected Result

Test Data

Performance Check

Validation

Baseline State Verification






1

Capture initial dashboard state

All system-wide metrics displayed

System Meters: 850 total

Dashboard loads < 2s

Baseline accuracy

2

Verify "Meters in This Cycle" shows zero

Cycle-specific metrics at zero

Cycle Meters: 0

N/A

Initial state

3

Note initial route table state

All routes unchecked, selectable

5+ routes available

Table loads < 3s

Data loading

Single Route Selection Testing






4

Select Downtown Route A checkbox

Route selected, dashboard updates immediately

Route A: 32 meters

Update < 2s

Real-time response

5

Verify cycle meter count update

"Meters in This Cycle" shows 32

Active: 32, Inactive: 0

Calculation accurate

Math validation

6

Check meter conditions update

Normal/Faulty/RCNT counts display

Based on Route A meters

Breakdown accurate

Condition tracking

7

Verify meter categories update

Residential/Commercial distribution

Based on Route A

Category distribution

Classification

8

Confirm consumer metrics update

Active/Inactive consumer counts

Based on Route A

Consumer totals

Consumer tracking

9

Validate system-wide metrics unchanged

System totals remain constant

Still 850 total

No impact on system

Data integrity

Multiple Route Selection Testing






10

Select Downtown Route B checkbox

Cumulative totals update

Route B: 24 meters

Update < 2s

Additive calculation

11

Verify cumulative meter count

Total shows 56 meters (32+24)

Total: 56

Math correct

Addition logic

12

Check conditions recalculation

Combined Normal/Faulty/RCNT counts

Routes A+B combined

Aggregate accurate

Condition aggregation

13

Verify categories recalculation

Combined category distribution

Routes A+B combined

Category totals

Classification totals

14

Select Downtown Route C checkbox

Further cumulative update

Route C: 29 meters

Update < 2s

Continued addition

15

Verify final cumulative total

Total shows 85 meters (32+24+29)

Total: 85

Math correct

Final calculation

Deselection Testing






16

Deselect Downtown Route A

Totals decrease by Route A meters

Remove 32 meters

Update < 2s

Subtraction logic

17

Verify adjusted totals

Total shows 53 meters (24+29)

Total: 53

Math correct

Subtraction validation

18

Check conditions recalculation

Conditions without Route A

Routes B+C only

Recalculation accurate

Dynamic adjustment

19

Verify categories adjustment

Categories without Route A

Routes B+C only

Category adjustment

Dynamic categories

Bulk Operations Testing






20

Click "Select All" button

All available routes selected

All routes checked

Bulk operation < 3s

Mass selection

21

Verify total calculation

Dashboard shows sum of all routes

All route meters summed

Calculation accurate

Bulk calculation

22

Check performance during bulk update

UI remains responsive

All routes data

No UI freezing

Performance validation

23

Click "Clear All" button

All routes deselected

No routes checked

Bulk clear < 2s

Mass deselection

24

Verify dashboard reset

All cycle metrics return to zero

Cycle metrics: 0

Reset accurate

Bulk reset

Search and Filter Testing






25

Enter search term in route filter

Routes filtered by search term

Search: "Commercial"

Filter < 1s

Search functionality

26

Select filtered route

Only filtered routes affect dashboard

Commercial routes only

Calculation accurate

Filtered calculation

27

Clear search filter

All routes visible again

Clear search

Filter clear < 1s

Filter reset

28

Verify dashboard recalculation

Metrics reflect current selections

Current state accurate

Recalculation correct

State consistency

Edge Case Testing






29

Rapidly select/deselect routes

System handles rapid changes

Multiple rapid clicks

No UI lag/errors

Stress testing

30

Test with maximum routes

Select maximum available routes

All system routes

Performance acceptable

Scalability test

Comprehensive Verification Points

Primary Verification

✅ Dashboard updates within 2 seconds of each route selection/deselection
✅ Mathematical calculations accurate for all operations (addition/subtraction)
✅ Real-time updates maintain data consistency throughout process
✅ System-wide metrics remain unchanged during cycle-specific updates
✅ UI remains responsive during all operations, no freezing

Secondary Verification

✅ Meter conditions accurately aggregated across multiple routes
✅ Meter categories correctly calculated and displayed
✅ Consumer metrics properly updated with route changes
✅ Search and filter operations work smoothly with real-time updates
✅ Bulk operations (Select All/Clear All) perform within acceptable time

Performance Verification

⏱️ Individual route selection response: < 2 seconds
⏱️ Bulk operations completion: < 3 seconds
⏱️ Search filter application: < 1 second
⏱️ Dashboard calculation time: < 500ms
⏱️ UI responsiveness maintained throughout

Negative Verification

❌ Dashboard should not show incorrect calculations
❌ System should not freeze during rapid selections
❌ Real-time updates should not fail or timeout
❌ Mathematical errors should not accumulate
❌ UI should not become unresponsive

TC_003: Business Rule Validation - Cycle Duration and Constraints [HIGH]

Test Case Metadata

Test Case ID: MX02US02_TC_003
Title: Comprehensive Business Rule Validation for Read Cycle Constraints
Created By: QA Team
Created Date: January 28, 2025
Version: 1.0

Classification & Tagging

Module/Feature: Business Rules Validation
Test Type: Functional Validation
Test Level: System Testing
Priority: P2-High
Execution Phase: Regression Testing
Automation Status: Manual Testing Required

Enhanced Tags

Tags: MOD-BusinessRules, MOD-Validation, P2-High, Phase-Regression, 
      Type-Functional-Validation, Platform-Web, Report-QA, Report-Product,
      Customer-All, Risk-Medium, Business-Medium, Revenue-Impact-Low,
      Validation-Rules, Edge-Cases, Input-Validation

Test Procedure - Cycle Duration Validation

Step

Input Value

Expected Result

Error Message Expected

Business Rule

1

Duration: 0

Validation Error

"Duration must be between 1-90 days"

Lower boundary

2

Duration: 1

Accepted

No error

Lower valid boundary

3

Duration: 90

Accepted

No error

Upper valid boundary

4

Duration: 91

Validation Error

"Duration must be between 1-90 days"

Upper boundary exceeded

5

Duration: -5

Validation Error

"Duration must be positive"

Negative value

6

Duration: "abc"

Input Rejected

"Please enter a valid number"

Invalid format

7

Duration: 30.5

Auto-rounded to 30

No error

Decimal handling

8

Duration: Empty

Validation Error

"Duration is required"

Required field

Test Procedure - Unique Naming Validation

Step

Cycle Name

Expected Result

Scenario

1

"Test Cycle 001"

Accepted (first time)

New unique name

2

"Test Cycle 001"

Error: "Name already exists"

Duplicate name

3

"test cycle 001"

Error: "Name already exists"

Case insensitive

4

"Test Cycle 002"

Accepted

New unique name


TC_004: Read Cycle Scheduling with Various Frequencies [CRITICAL]

Test Case Metadata

Test Case ID: MX02US02_TC_004
Title: Comprehensive Read Cycle Scheduling with All Frequency Options
Created By: QA Automation Team
Created Date: January 28, 2025
Version: 1.0

Classification & Tagging

Module/Feature: Read Cycle Scheduling
Test Type: Functional End-to-End
Test Level: System Integration
Priority: P1-Critical
Execution Phase: Acceptance Testing
Automation Status: High Priority for Automation

Enhanced Tags

Tags: MOD-Scheduling, P1-Critical, Phase-Acceptance, Type-E2E-Integration,
      Platform-Web-Mobile, Report-Product, Report-Engineering, Customer-All,
      Risk-High, Business-Critical, Revenue-Impact-High, Mobile-Integration,
      Scheduling-Logic, Field-Operations

Prerequisites

1. Read cycle created successfully (from TC_001)
2. Cycle visible in Read Cycles list
3. Schedule button available and enabled

Test Procedure - Frequency Options Testing

Frequency Type

Configuration

Expected Fields

Test Data

Validation

Once

Single execution

Date, Time

Tomorrow 09:00

Future date validation

Hourly

Repeat every hour

Time, End Date

Every hour at :00

Hourly recurrence

Daily

Repeat daily

Time, End Date

09:00 AM daily

Daily recurrence

Weekly

Repeat weekly

Day of Week, Time

Every Monday 09:00

Weekly pattern

Bi-Weekly

Every 2 weeks

2 Days of Week

Monday & Thursday

Bi-weekly pattern

Monthly

Monthly repeat

Date of Month

15th of each month

Monthly pattern

Bi-Monthly

Every 2 months

2 Dates

1st and 15th

Bi-monthly pattern

Quarterly

Every 3 months

Month, Day

March 15th

Quarterly pattern

Yearly

Annual repeat

Month, Day

April 1st annually

Annual pattern

Detailed Test Steps

Step

Action

Expected Result

Integration Point

Mobile Validation

1

Navigate to Read Cycles list

List displays with Schedule buttons

N/A

N/A

2

Click Schedule for test cycle

Schedule modal opens

N/A

N/A

3

Select "Once" frequency

Date and time fields appear

N/A

N/A

4

Set execution for tomorrow 09:00

Date/time accepted

N/A

N/A

5

Set schedule end date

End date field populated

N/A

N/A

6

Click "Schedule" button

Success message, schedule confirmed

Integration with scheduling service

N/A

7

Verify "Next 5 Occurrences"

Shows scheduled execution time

N/A

N/A

8

Check mobile app integration

Cycle appears in mobile reader app

Mobile API sync

Cycle visible in mobile

9

Test "Weekly" frequency

Day selection dropdown appears

N/A

N/A

10

Configure weekly Monday execution

Weekly pattern set

N/A

N/A

11

Verify mobile sync timing

Mobile app updates within 2 minutes

Real-time sync

Schedule synced

Integration Verification Points

🔗 Scheduling Service: Cron jobs created correctly
🔗 Mobile App: Scheduled cycles appear for field readers
🔗 Database: Schedule configuration persisted
🔗 Notification System: Alerts configured for execution times

TC_005: Comprehensive Audit Trail Functionality [HIGH]

Test Case Metadata

Test Case ID: MX02US02_TC_005
Title: Verify Complete Audit Trail Logging, Display, and Export Functionality
Created By: QA Team
Created Date: January 28, 2025
Version: 1.0

Classification & Tagging

Module/Feature: Audit Trail & Activity Logging
Test Type: Functional System
Test Level: System Testing
Priority: P2-High
Execution Phase: Regression Testing
Automation Status: Manual Testing Preferred

Enhanced Tags

Tags: MOD-AuditTrail, MOD-Compliance, P2-High, Phase-Regression,
      Type-Functional-System, Platform-Web, Report-QA, Report-Compliance,
      Customer-Enterprise, Risk-Medium, Business-High, Revenue-Impact-Low,
      Compliance-Tracking, Data-Integrity, Historical-Data

Business Context

Customer_Segment: Enterprise Utilities (Compliance focus)
Revenue_Impact: Low (Indirect - compliance support)
Business_Priority: Should-Have
Customer_Journey: Support & Compliance
Compliance_Required: Yes (Audit requirements)
SLA_Related: No

Quality Metrics

Risk_Level: Medium
Complexity_Level: Medium
Expected_Execution_Time: 12 minutes
Reproducibility_Score: High
Data_Sensitivity: Medium (User activity data)
Failure_Impact: Medium (Compliance impact)

Test Procedure - Audit Trail Verification

Step

Action

Expected Result

Audit Entry Expected

Validation Point

Creation Tracking





1

Create new read cycle

Cycle created successfully

"Created read cycle 'Test Cycle'"

Creation logged

2

Navigate to Audit Trail tab

Tab loads with entries

Creation entry visible

Audit accessible

3

Verify entry format

Proper timestamp, user, action format

Format: "28/1/2025, 2:30:00 pm"

Standard format

4

Check entry details

Complete action description

"Created read cycle with 3 routes, 85 meters"

Detailed logging

Modification Tracking





5

Edit cycle name (if allowed)

Name updated successfully

"Modified read cycle name from 'Old' to 'New'"

Edit tracking

6

Add route to cycle

Route added successfully

"Added route 'Downtown Route D' to cycle"

Route addition

7

Remove route from cycle

Route removed successfully

"Removed route 'Downtown Route D' from cycle"

Route removal

8

Modify cycle duration

Duration updated

"Changed cycle duration from 30 to 45 days"

Field changes

Scheduling Tracking





9

Schedule read cycle

Schedule created

"Scheduled cycle for weekly execution"

Schedule logging

10

Modify schedule

Schedule updated

"Updated schedule frequency from weekly to monthly"

Schedule changes

11

Pause scheduled cycle

Cycle paused

"Paused scheduled execution"

Status changes

12

Resume paused cycle

Cycle resumed

"Resumed scheduled execution"

Status restoration

Mobile Integration Tracking





13

Submit reading via mobile

Reading recorded

"Reading submitted for meter M123456"

Mobile activity

14

Complete route via mobile

Route completed

"Route 'Downtown A' completed by field reader"

Mobile completion

15

Report issue via mobile

Issue logged

"Access issue reported for meter M234567"

Issue tracking

System Activity Tracking





16

Auto-assignment trigger

System action logged

"Auto-assigned 2 remaining routes"

System actions

17

Data validation warning

Warning logged

"Detected 3 abnormal readings in Route B"

System warnings

18

Integration sync

Sync activity logged

"Synchronized with CX system"

Integration tracking

Audit Trail Display Verification

Test Area

Verification Point

Expected Behavior

Data Validation

Chronological Order

Entry sorting

Latest entries at top

Timestamp descending

User Attribution

User identification

Correct user names

Session user tracking

Action Classification

Status indicators

Success/Warning/Info/Error

Visual status coding

Detail Completeness

Information depth

Old/new values shown

Complete change tracking

Timestamp Accuracy

Time recording

Accurate timestamps

Server time sync

Immutability

Entry modification

Entries cannot be edited

Data integrity

Filter and Search Testing

Step

Filter/Search Action

Expected Result

Data Set

Validation

1

Filter by date range

Entries within range shown

Last 7 days

Date filtering

2

Filter by user

Only selected user's actions

Specific user

User filtering

3

Filter by action type

Only creation actions shown

"Created" actions

Type filtering

4

Search by keywords

Matching entries displayed

"route" keyword

Text search

5

Combine multiple filters

Intersection of filters applied

Date + User + Type

Combined filtering

6

Clear all filters

All entries visible again

Full dataset

Filter reset

Export and Reporting

Step

Export Action

Expected Result

File Validation

Content Check

1

Export all entries

CSV file downloaded

Valid CSV format

All entries included

2

Export filtered entries

Only filtered data exported

Filtered subset

Filter applied

3

Export to PDF

PDF report generated

Valid PDF format

Formatted report

4

Verify export completeness

All columns included

Complete data

No data loss

5

Test large dataset export

1000+ entries exported

Performance acceptable

Scalability


TC_006: System Integration Validation - CX/MX/ONB [CRITICAL]

Test Case Metadata

Test Case ID: MX02US02_TC_006
Title: Comprehensive System Integration Testing with CX, MX, and ONB Services
Created By: QA Integration Team
Created Date: January 28, 2025
Version: 1.0

Classification & Tagging

Module/Feature: System Integration
Test Type: Integration End-to-End
Test Level: Integration Testing
Priority: P1-Critical
Execution Phase: Integration Testing
Automation Status: Automated (API Level)

Enhanced Tags

Tags: MOD-Integration, MOD-SystemIntegration, P1-Critical, Phase-Integration,
      Type-E2E-Integration, Platform-Web-API, Report-Engineering, Report-Architecture,
      Customer-All, Risk-High, Business-Critical, Revenue-Impact-High,
      External-Dependencies, API-Integration, Service-Mesh

Business Context

Customer_Segment: All Utility Companies
Revenue_Impact: High (Core system dependencies)
Business_Priority: Must-Have
Customer_Journey: All Operations
Compliance_Required: No
SLA_Related: Yes (< 1s API response)

Integration Test Matrix

Integration Point

Test Scenario

API Endpoint

Expected Response

Failure Handling

CX Integration





CX-001

Consumer data sync

GET /cx/consumers

Consumer list with active status

Graceful degradation

CX-002

Consumer validation

POST /cx/validate

Validation success/failure

Error message display

CX-003

Billing integration

POST /cx/billing-cycles

Billing cycle creation

Retry mechanism

MX Integration





MX-001

Meter inventory sync

GET /mx/meters

Meter list with conditions

Cache fallback

MX-002

Route meter mapping

GET /mx/routes/{id}/meters

Route-specific meters

Default data

MX-003

Meter condition updates

PUT /mx/meters/{id}/condition

Condition update success

Status notification

ONB Integration





ONB-001

Area validation

GET /onb/areas

Available areas list

Limited area access

ONB-002

Sub-area dependencies

GET /onb/areas/{id}/subareas

Filtered sub-areas

Show all sub-areas

ONB-003

Geographic boundaries

GET /onb/boundaries

Geographic data

Map unavailable

Detailed Integration Test Procedure

Step

Integration Action

System Response

API Validation

Error Scenario

CX System Integration





1

Create read cycle

CX API called for consumer validation

API response < 1s

CX service unavailable

2

Verify consumer data sync

Consumer counts match CX system

Data consistency

Partial data sync

3

Update consumer status

Status reflected in CX system

Bidirectional sync

Sync failure

4

Generate billing cycle

CX receives meter reading schedule

Integration success

Billing system error

MX System Integration





5

Load route meters

MX provides accurate meter inventory

Meter data current

MX service down

6

Update meter conditions

Condition changes sync to MX

Real-time updates

Update failure

7

Meter reading submission

Readings stored in MX system

Data persistence

Storage failure

8

Meter status validation

Status checks against MX data

Validation accurate

Validation service error

ONB System Integration





9

Area dropdown population

ONB provides area hierarchy

Geographic data loaded

ONB unavailable

10

Sub-area filtering

Dependent dropdowns work correctly

Cascading data

Incomplete hierarchy

11

Boundary validation

Geographic constraints enforced

Boundary checks

Validation bypass

12

Configuration sync

ONB settings applied correctly

Configuration current

Config out of sync

API Performance Testing

API Call

Performance Target

Load Test Scenario

Expected Throughput

Failure Threshold

CX Consumer API

< 1 second

50 concurrent requests

100 req/sec

> 3 seconds

MX Meter API

< 500ms

100 concurrent requests

200 req/sec

> 2 seconds

ONB Area API

< 1 second

25 concurrent requests

50 req/sec

> 3 seconds

Integration Failure Scenarios

Failure Type

Simulation Method

Expected Behavior

User Impact

Recovery Test

CX Service Down

Service mock unavailable

Error message, graceful degradation

Limited consumer data

Auto-retry mechanism

MX Partial Failure

Timeout simulation

Cached data used, warning shown

Meter counts approximate

Manual refresh

ONB Connectivity

Network disruption

Default areas shown, notification

Reduced area selection

Service restoration

Multiple Service Failure

Cascade failure test

System remains functional

Core features limited

Sequential recovery

Data Consistency Verification

Data Point

Source System

Validation Method

Consistency Check

Discrepancy Handling

Consumer Count

CX System

Cross-reference query

Exact match required

Data sync alert

Meter Inventory

MX System

Real-time validation

99% accuracy target

Variance notification

Area Hierarchy

ONB System

Structure validation

Complete hierarchy

Fallback options

Route Assignments

All Systems

Cross-system check

No conflicts

Conflict resolution


TC_007: Performance Testing - Concurrent Users and Load [HIGH]

Test Case Metadata

Test Case ID: MX02US02_TC_007
Title: Performance Testing with Multiple Concurrent Supervisors and System Load
Created By: Performance Testing Team
Created Date: January 28, 2025
Version: 1.0

Classification & Tagging

Module/Feature: System Performance & Scalability
Test Type: Performance Load Testing
Test Level: System Performance
Priority: P2-High
Execution Phase: Performance Testing
Automation Status: Automated (Load Testing Tools)

Enhanced Tags

Tags: MOD-Performance, MOD-Scalability, P2-High, Phase-Performance,
      Type-Performance-Load, Platform-Web, Report-Engineering, Report-Operations,
      Customer-Enterprise, Risk-Medium, Business-High, Revenue-Impact-Medium,
      Load-Testing, Scalability, Concurrent-Users

Performance Test Scenarios

Load Level

Concurrent Users

Test Duration

Key Metrics

Success Criteria

Light Load

10 users

15 minutes

Response time, CPU usage

< 1s API, < 3s page load

Medium Load

25 users

30 minutes

Throughput, memory usage

95% requests successful

Peak Load

50 users

45 minutes

Error rate, stability

< 2% error rate

Stress Test

75 users

30 minutes

Breaking point, recovery

Graceful degradation

Detailed Performance Test Procedure

Step

Load Configuration

Test Actions

Performance Metrics

Acceptance Criteria

Baseline Performance





1

Single user

Create read cycle

Response time

< 3s page load, < 1s API

2

Single user

Route selection

UI responsiveness

< 2s dashboard updates

3

Single user

Schedule cycle

End-to-end flow

< 5s total process

Light Load Testing (10 Users)





4

10 concurrent users

Simultaneous cycle creation

Average response time

< 1.5s average

5

10 concurrent users

Route selection operations

UI update performance

< 3s dashboard refresh

6

10 concurrent users

Dashboard viewing

Page load consistency

< 4s page loads

7

Monitor system resources

CPU, memory, database

Resource utilization

< 70% CPU usage

Medium Load Testing (25 Users)





8

25 concurrent users

Mixed operations

Throughput metrics

95% success rate

9

25 concurrent users

Real-time updates

Update latency

< 3s update time

10

25 concurrent users

Database operations

Query performance

< 1s query response

11

Monitor integration APIs

CX/MX/ONB response times

Integration performance

< 1.5s API calls

Peak Load Testing (50 Users)





12

50 concurrent users

Full system operations

System stability

No system crashes

13

50 concurrent users

Data consistency checks

Data integrity

No data corruption

14

50 concurrent users

Error handling

Error rate monitoring

< 2% error rate

15

Monitor system limits

Resource ceiling

Performance degradation

Graceful slowdown

Stress Testing (75 Users)





16

75 concurrent users

Beyond normal capacity

Breaking point analysis

System behavior

17

Monitor recovery

System recovery time

Recovery metrics

< 2 minutes recovery

Performance Metrics Collection

Metric Category

Specific Metrics

Measurement Method

Target Values

Alert Thresholds

Response Times

API response, Page load, Database query

Automated monitoring

< 1s, < 3s, < 500ms

> 150% of target

Throughput

Requests/second, Transactions/minute

Load testing tools

100 req/sec minimum

< 50 req/sec

Resource Usage

CPU, Memory, Disk I/O

System monitoring

< 80% utilization

> 90% utilization

Error Rates

HTTP errors, Application errors

Error tracking

< 1% error rate

> 2% error rate

User Experience

UI responsiveness, Data accuracy

Real user monitoring

Smooth interactions

UI freezing

Load Test Scenarios

Scenario

User Distribution

Actions Per User

Test Pattern

Duration

Normal Operations

80% create cycles, 15% view, 5% schedule

10 actions/hour

Constant load

1 hour

Peak Hours

60% create, 25% view, 15% schedule

20 actions/hour

Ramp up pattern

45 minutes

Batch Processing

50% bulk operations

5 large operations

Spike pattern

30 minutes


TC_008: Error Handling and System Recovery [HIGH]

Test Case Metadata

Test Case ID: MX02US02_TC_008
Title: Comprehensive Error Handling and System Recovery Validation
Created By: QA Reliability Team
Created Date: January 28, 2025
Version: 1.0

Classification & Tagging

Module/Feature: Error Handling & System Resilience
Test Type: Functional Reliability
Test Level: System Testing
Priority: P2-High
Execution Phase: Regression Testing
Automation Status: Manual Testing Required

Enhanced Tags

Tags: MOD-ErrorHandling, MOD-SystemResilience, P2-High, Phase-Regression,
      Type-Functional-Reliability, Platform-Web, Report-QA, Report-Operations,
      Customer-All, Risk-Medium, Business-High, Revenue-Impact-Medium,
      Error-Recovery, Fault-Tolerance, System-Stability

Error Scenario Test Matrix

Error Category

Test Scenario

Trigger Method

Expected Behavior

Recovery Validation

Network Errors





NET-001

Connection timeout during cycle creation

Network simulation

Timeout message, data preserved

Retry successful

NET-002

Intermittent connectivity

Connection drops

Graceful degradation

Auto-reconnection

NET-003

Complete network failure

Disconnect simulation

Offline mode message

Manual retry

Database Errors





DB-001

Database connection failure

DB service stop

Connection error message

Service restart recovery

DB-002

Query timeout

Long-running query

Timeout handling

Query optimization

DB-003

Constraint violation

Duplicate data attempt

Validation error

Clear error message

Integration Errors





INT-001

CX system unavailable

Service mock down

Service unavailable message

Fallback data

INT-002

MX system timeout

API delay simulation

Timeout handling

Cached data usage

INT-003

ONB system partial failure

Limited service

Partial functionality

Degraded mode

Business Logic Errors





BL-001

Route conflict detection

Overlapping assignments

Conflict error message

Alternative suggestions

BL-002

Invalid date ranges

Past date selection

Date validation error

Date correction

BL-003

Capacity limits exceeded

Maximum routes selected

Limit warning

Capacity guidance

Detailed Error Testing Procedure

Step

Error Simulation

System Response

User Experience

Recovery Steps

Network Error Handling





1

Disconnect network during form submission

"Connection lost" message shown

Form data preserved

Reconnect and retry

2

Slow network simulation

Loading indicators shown

Progress feedback

Patience or cancel

3

Intermittent connection

Auto-retry mechanism

Seamless recovery

Background retry

Database Error Scenarios





4

Database unavailable

"Service temporarily unavailable"

Clear error message

Service restoration

5

Transaction rollback

Data consistency maintained

No partial updates

Clean rollback

6

Deadlock detection

Automatic retry

User notified if needed

Transaction retry

Integration Failures





7

CX service timeout

"Consumer data unavailable"

Functionality continues

Manual refresh

8

MX service error

"Meter data may be outdated"

Warning displayed

Cached data used

9

ONB service failure

"Limited area selection"

Reduced options

Basic functionality

User Input Errors





10

Invalid form data

Field-level validation errors

Inline error messages

Input correction

11

Required fields missing

Form submission blocked

Required field highlighting

Complete form

12

Business rule violations

Rule-specific error messages

Clear violation explanation

Rule compliance

Error Message Validation

Error Type

Message Requirements

Message Example

User Action Guidance

Validation Errors

Clear, specific, actionable

"Cycle name already exists. Please choose a different name."

Specific correction

System Errors

Non-technical, reassuring

"We're experiencing technical difficulties. Please try again."

Retry instruction

Integration Errors

Service-specific, informative

"Meter data service is unavailable. Using cached data."

Impact explanation

Network Errors

Connection-focused

"Connection lost. Your changes have been saved. Click retry to continue."

Recovery guidance

System Recovery Testing

Recovery Scenario

Failure Duration

Recovery Method

Expected Behavior

Validation Points

Short Outage

< 30 seconds

Automatic retry

Seamless recovery

No data loss

Medium Outage

1-5 minutes

Manual retry

User-initiated recovery

State preservation

Extended Outage

> 5 minutes

Service restart

Full system recovery

Complete functionality


TC_009: Mobile Integration End-to-End Validation [CRITICAL]

Test Case Metadata

Test Case ID: MX02US02_TC_009
Title: Complete Mobile App Integration for Field Reader Operations
Created By: Mobile Integration Team
Created Date: January 28, 2025
Version: 1.0

Classification & Tagging

Module/Feature: Mobile Integration & Field Operations
Test Type: Integration End-to-End
Test Level: Cross-Platform Integration
Priority: P1-Critical
Execution Phase: Integration Testing
Automation Status: Manual Testing (Cross-Platform)

Enhanced Tags

Tags: MOD-MobileIntegration, MOD-FieldOperations, P1-Critical, Phase-Integration,
      Type-E2E-Cross-Platform, Platform-Web-Mobile, Report-Product, Report-Engineering,
      Customer-All, Risk-High, Business-Critical, Revenue-Impact-High,
      Mobile-Sync, Field-Operations, Real-Time-Data

Mobile Integration Test Flow

Step

Web Platform Action

Mobile App Response

Sync Validation

Timing Requirement

Cycle Creation to Mobile Sync





1

Create read cycle in web

N/A

Baseline established

N/A

2

Schedule cycle for immediate execution

Cycle appears in mobile app

Data synchronization

< 2 minutes

3

Verify cycle details in mobile

All route and meter data accurate

Data consistency

Complete details

4

Check route assignments

Field readers see assigned routes

Assignment accuracy

Correct assignments

Field Data Collection





5

Mobile: Start route execution

Web shows route status "In Progress"

Status synchronization

Real-time update

6

Mobile: Submit meter reading

Web displays reading in real-time

Bidirectional sync

< 30 seconds

7

Mobile: Report access issue

Web shows issue in audit trail

Issue tracking

Immediate logging

8

Mobile: Add photo evidence

Web displays photo attachment

Media synchronization

< 1 minute

Route Completion Flow





9

Mobile: Complete entire route

Web updates route status to "Completed"

Completion tracking

Real-time status

10

Mobile: Submit route summary

Web shows completion metrics

Summary synchronization

Complete data

11

Verify completion audit trail

All mobile actions logged in web

Activity tracking

Complete history

Offline Scenarios





12

Mobile: Work offline

Readings queued locally

Offline capability

Local storage

13

Mobile: Reconnect to network

Queued data syncs to web

Offline sync

Automatic sync

14

Verify data integrity

No data loss during offline period

Data consistency

Complete accuracy

Mobile Functionality Validation

Mobile Feature

Test Scenario

Expected Behavior

Web Integration

Performance Target

Cycle Synchronization

Scheduled cycle availability

Cycles appear in mobile list

Web scheduling reflected

< 2 minutes sync

Route Navigation

GPS-enabled route following

Turn-by-turn directions

Route data accurate

Real-time navigation

Meter Reading

Barcode scanning, manual entry

Multiple input methods

Immediate web sync

< 30 seconds

Photo Capture

Image attachment to readings

High-quality photos

Web display capability

< 1 minute upload

Issue Reporting

Access problems, meter faults

Structured issue logging

Web notification system

Immediate alert

Data Validation

Reading range checks

Real-time validation

Web rule consistency

Instant feedback

Cross-Platform Data Consistency

Data Element

Web Source

Mobile Display

Sync Direction

Validation Method

Cycle Information

Web creation

Mobile display

Web → Mobile

Field comparison

Route Details

Web assignment

Mobile execution

Web → Mobile

Route accuracy

Meter Readings

Mobile collection

Web reporting

Mobile → Web

Reading validation

Issue Reports

Mobile submission

Web management

Mobile → Web

Issue tracking

Completion Status

Mobile update

Web dashboard

Mobile → Web

Status accuracy

Mobile Performance Testing

Performance Metric

Target Value

Test Method

Load Scenario

Acceptance Criteria

Sync Time

< 2 minutes

Timestamp comparison

10 concurrent cycles

95% within target

Reading Upload

< 30 seconds

Upload timing

50 readings/batch

Average < 30s

Offline Capacity

100 readings

Local storage test

Full day offline

No data loss

Battery Impact

< 20% per hour

Battery monitoring

8-hour shift

Acceptable drain


TC_010: Data Export and Reporting Functionality [MEDIUM]

Test Case Metadata

Test Case ID: MX02US02_TC_010
Title: Comprehensive Data Export and Reporting Feature Validation
Created By: QA Reporting Team
Created Date: January 28, 2025
Version: 1.0

Classification & Tagging

Module/Feature: Data Export & Reporting
Test Type: Functional System
Test Level: System Testing
Priority: P3-Medium
Execution Phase: Acceptance Testing
Automation Status: Manual Testing Preferred

Enhanced Tags

Tags: MOD-DataExport, MOD-Reporting, P3-Medium, Phase-Acceptance,
      Type-Functional-System, Platform-Web, Report-Product, Report-Business,
      Customer-Enterprise, Risk-Low, Business-Medium, Revenue-Impact-Low,
      Data-Export, Business-Intelligence, Report-Generation

Export Functionality Test Matrix

Export Type

Data Source

File Format

Test Scenario

Validation Points

Meter Lists

Cycle meter inventory

CSV, Excel

Complete cycle data

All meters included

Audit Trails

Activity logs

CSV, PDF

Historical activity

Chronological order

Performance Reports

Cycle metrics

PDF, Excel

Completion statistics

Accurate calculations

Route Details

Route assignments

Excel

Route breakdowns

Complete route data

Custom Reports

Filtered data

Multiple formats

User-defined exports

Filter accuracy

Detailed Export Testing Procedure

Step

Export Action

Expected File

Content Validation

Performance Check

Meter List Export





1

Navigate to cycle Meters tab

N/A

Meter list displayed

< 3s load time

2

Click "Export" button

Export options menu

CSV/Excel options available

Immediate response

3

Select CSV format

File download initiated

CSV file downloaded

< 10s download

4

Open downloaded file

Spreadsheet application

All meters listed

Complete data

5

Verify data accuracy

Cross-reference with UI

Serial numbers, addresses match

100% accuracy

6

Check column headers

Proper field names

Standard naming convention

Clear headers

Audit Trail Export





7

Navigate to Audit Trail tab

N/A

Audit entries displayed

< 3s load time

8

Apply date filter

Filtered results

Last 30 days entries

Filter applied

9

Export filtered data

PDF report generated

Filtered data only

Filter accuracy

10

Verify PDF formatting

Professional layout

Proper pagination

Report quality

11

Check export completeness

All visible entries included

No missing entries

Complete export

Performance Report Export





12

Generate cycle performance report

Report compilation

Completion metrics

Accurate statistics

13

Export to Excel format

Excel file download

Formatted spreadsheet

Professional layout

14

Verify calculations

Manual spot checks

Percentages accurate

Math validation

15

Check chart inclusion

Graphs embedded

Visual elements present

Complete report

Large Dataset Testing

Dataset Size

Export Type

Performance Target

Memory Usage

Success Criteria

Small (< 100 records)

CSV export

< 5 seconds

Minimal

100% success

Medium (100-1000 records)

Excel export

< 30 seconds

Moderate

99% success

Large (1000+ records)

Chunked export

< 2 minutes

Controlled

95% success

Export Format Validation

File Format

Structure Check

Content Validation

Use Case

Quality Standard

CSV

Comma-separated, UTF-8

Special character handling

Data analysis

RFC 4180 compliant

Excel

Proper formatting, multiple sheets

Formula preservation

Business reporting

Professional layout

PDF

Page layout, print-ready

Visual formatting

Official reports

Print quality


API Test Cases (Critical Level ≥7)

API_001: Create Read Cycle Endpoint [CRITICAL - Level 9]

API Test Case Metadata

API Test Case ID: MX02US02_API_001
Endpoint: POST /api/v1/read-cycles
Title: Create Read Cycle via API with Comprehensive Validation
Priority: P1-Critical (Level 9)
Test Type: API Integration
Created Date: January 28, 2025

API Specification

HTTP Method: POST
Endpoint: /api/v1/read-cycles
Content-Type: application/json
Authentication: Bearer token required
Rate Limit: 100 requests/minute

Test Scenarios

Scenario

Request Payload

Expected Response

Status Code

Validation Points

Valid Creation

Complete payload

Success response

201 Created

ID generated, audit logged

Missing Required Fields

Incomplete payload

Validation errors

400 Bad Request

Field-specific errors

Duplicate Name

Existing cycle name

Conflict error

409 Conflict

Uniqueness enforced

Invalid Route IDs

Non-existent routes

Not found error

404 Not Found

Route validation

Exceeds Limits

Too many routes

Limit exceeded

400 Bad Request

Business rule enforcement

Detailed API Test Procedure

Step

API Request

Expected Response

Performance Check

Integration Validation

Valid Request Testing





1

POST with complete valid payload

201 Created with cycle ID

< 1 second response

Database record created

2

Verify response structure

JSON schema validation

Response well-formed

All required fields present

3

Check audit trail creation

Audit entry logged

Database query

Creation activity recorded

4

Verify integration triggers

CX/MX/ONB APIs called

Integration monitoring

External systems notified

Validation Testing





5

POST with missing name field

400 Bad Request

< 500ms response

Error message specific

6

POST with duplicate name

409 Conflict

< 500ms response

Uniqueness validation

7

POST with invalid duration

400 Bad Request

< 500ms response

Range validation (1-90)

8

POST with non-existent routes

404 Not Found

< 500ms response

Route existence check

Performance Testing





9

Concurrent API calls (10)

All succeed

< 1.5s average

No race conditions

10

Large payload (max routes)

Success or limit error

< 2s response

Scalability validation

API Request Examples

Valid Request Payload:

{
  "name": "API Test Cycle 001",
  "area": "Downtown District",
  "subArea": "Commercial Zone A",
  "utilityService": "Water",
  "cycleDuration": 30,
  "routes": ["route-123", "route-456", "route-789"],
  "createdBy": "supervisor.test@utility.com"
}

Expected Success Response:

{
  "id": "cycle-uuid-12345",
  "name": "API Test Cycle 001",
  "status": "Created",
  "totalRoutes": 3,
  "totalMeters": 85,
  "totalConsumers": 67,
  "createdAt": "2025-01-28T14:30:00Z",
  "createdBy": "supervisor.test@utility.com",
  "readingPeriod": {
    "startDate": "2025-04-01",
    "endDate": "2025-04-30"
  }
}

API Validation Points

✅ Response time < 1 second for valid requests
✅ Database transaction completed successfully
✅ Audit trail entry created with correct details
✅ Integration with CX/MX/ONB systems triggered
✅ Error responses include helpful messages
✅ Rate limiting enforced correctly
✅ Authentication required and validated

API_002: Real-time Meter Dashboard Endpoint [CRITICAL - Level 8]

API Test Case Metadata

API Test Case ID: MX02US02_API_002
Endpoint: GET /api/v1/read-cycles/{id}/meter-dashboard
Title: Real-time Meter Dashboard Data Retrieval
Priority: P1-Critical (Level 8)
Test Type: API Performance Integration
Created Date: January 28, 2025

API Specification

HTTP Method: GET
Endpoint: /api/v1/read-cycles/{id}/meter-dashboard
Response Type: application/json
Cache Headers: no-cache (real-time data)
Authentication: Bearer token required
Performance SLA: < 500ms response time

Real-time Data Test Scenarios

Test Scenario

Route Selection

Expected Data

Performance Target

Cache Validation

Empty Cycle

No routes selected

Zero meters, empty breakdown

< 300ms

No caching

Single Route

One route selected

Route-specific metrics

< 400ms

Real-time calc

Multiple Routes

3-5 routes selected

Aggregated metrics

< 500ms

Dynamic updates

Maximum Load

All available routes

Complete system data

< 800ms

Performance limit

API Response Validation

Expected Response Structure:

{
  "cycleId": "cycle-uuid-12345",
  "systemWideMeters": {
    "total": 850,
    "assigned": 795,
    "unassigned": 55
  },
  "metersInThisCycle": {
    "total": 85,
    "active": 82,
    "inactive": 3
  },
  "meterConditions": {
    "normal": 70,
    "faulty": 10,
    "rcnt": 3,
    "others": 2
  },
  "meterCategories": {
    "residential": 45,
    "commercial": 25,
    "industrial": 10,
    "government": 3,
    "agricultural": 2
  },
  "consumers": {
    "total": 67,
    "active": 64,
    "inactive": 2,
    "disconnected": 1,
    "paused": 0
  },
  "lastUpdated": "2025-01-28T14:35:22Z"
}

Performance Test Matrix

Load Scenario

Concurrent Requests

Expected Response Time

Success Rate

Error Handling

Normal Load

5 concurrent

< 400ms average

100%

No errors

Peak Load

15 concurrent

< 600ms average

98%

Graceful degradation

Stress Load

25 concurrent

< 1s average

95%

Rate limiting


Test Suite Organization & Execution Strategy

Test Suite Categories

Smoke Test Suite (Daily Execution - Critical Path)

Execution Frequency: Daily (after deployments)
Total Execution Time: ~25 minutes
Automation Level: 85% automated
Success Criteria: 100% pass rate required

Included Test Cases:
✅ TC_001: Create Basic Read Cycle (8 min)
✅ TC_004: Read Cycle Scheduling (6 min) 
✅ TC_006: System Integration Validation (8 min)
✅ API_001: Create Read Cycle API (3 min)

Purpose: Verify core system functionality after each deployment
Trigger: Automated via CI/CD pipeline
Notification: Slack alerts for failures

Regression Test Suite (Pre-Release Validation)

Execution Frequency: Before each release
Total Execution Time: ~3 hours
Automation Level: 70% automated
Success Criteria: 95% pass rate required

Included Test Cases:
✅ TC_001: Create Basic Read Cycle
✅ TC_002: Route Selection Real-time Updates
✅ TC_003: Business Rule Validation
✅ TC_004: Read Cycle Scheduling
✅ TC_005: Audit Trail Functionality
✅ TC_006: System Integration
✅ TC_007: Performance Testing
✅ TC_008: Error Handling
✅ API_001: Create Read Cycle API
✅ API_002: Meter Dashboard API

Purpose: Comprehensive feature validation before production release
Trigger: Manual execution by QA team
Environment: Staging environment

Full Test Suite (Comprehensive Validation)

Execution Frequency: Weekly + Major releases
Total Execution Time: ~5 hours
Automation Level: 60% automated
Success Criteria: 90% pass rate required

Included Test Cases: All TC_001 through TC_010 + API tests

Additional Coverage:
- Cross-browser testing (Chrome, Firefox, Safari, Edge)
- Mobile integration end-to-end
- Performance benchmarking
- Security validation
- Data export functionality

Purpose: Complete system validation and quality assurance
Environment: Production-like staging

Performance Test Suite (Load & Scalability)

Execution Frequency: Weekly + Performance concerns
Total Execution Time: ~2 hours
Automation Level: 95% automated
Success Criteria: All SLAs met

Focus Areas:
- 50 concurrent users load testing
- API response time validation (< 1s)
- Page load performance (< 3s)
- Real-time update latency (< 2s)
- Database query optimization
- Integration service performance

Tools: JMeter, New Relic, Custom monitoring
Environment: Performance testing environment

Integration & Dependency Management

System Dependency Matrix

Integration Point

Dependency Level

Health Check

Failure Impact

Recovery Strategy

CX System

Critical

/health endpoint

High - Consumer operations blocked

Cached data + manual retry

MX System

Critical

/status endpoint

High - Meter data inaccurate

Historical data + refresh

ONB System

Medium

/ping endpoint

Medium - Limited area selection

Default options + notification

Mobile App

Critical

Push notification test

High - Field operations stopped

Manual coordination + sync

Database

Critical

Connection pool monitoring

Critical - Complete failure

Immediate escalation

Pre-Test Environment Validation

# Environment Health Check Script
#!/bin/bash

echo "=== Read Cycle Management Test Environment Validation ==="

# Database connectivity
echo "✓ Checking database connection..."
# Connection test logic

# External service health
echo "✓ Validating CX service health..."
curl -f http://cx-service/health || echo "❌ CX service unavailable"

echo "✓ Validating MX service health..."  
curl -f http://mx-service/health || echo "❌ MX service unavailable"

echo "✓ Validating ONB service health..."
curl -f http://onb-service/health || echo "❌ ONB service unavailable"

# Test data preparation
echo "✓ Preparing test data..."
# Data setup scripts

echo "✓ Environment ready for testing"

Test Data Management Strategy

Master Test Data Setup

-- Test Areas and Sub-areas
INSERT INTO areas (id, name, active) VALUES 
('area-001', 'Downtown District', true),
('area-002', 'North Residential', true),
('area-003', 'Industrial Zone', true);

INSERT INTO sub_areas (id, area_id, name, active) VALUES
('sub-001', 'area-001', 'Commercial Zone A', true),
('sub-002', 'area-001', 'Commercial Zone B', true),
('sub-003', 'area-002', 'Residential Block 1', true);

-- Test Routes with Meters
INSERT INTO routes (id, name, area_id, sub_area_id, read_type, meter_count) VALUES
('route-001', 'Downtown Route A', 'area-001', 'sub-001', 'Manual', 32),
('route-002', 'Downtown Route B', 'area-001', 'sub-001', 'Manual', 24),
('route-003', 'Downtown Route C', 'area-001', 'sub-001', 'Manual', 29);

-- Test Meters with Various Conditions
INSERT INTO meters (id, serial_number, route_id, condition, category, status) VALUES
('meter-001', 'M123456', 'route-001', 'Normal', 'Commercial', 'Active'),
('meter-002', 'M123457', 'route-001', 'Faulty', 'Commercial', 'Active'),
('meter-003', 'M123458', 'route-001', 'RCNT', 'Residential', 'Inactive');

Test Data Cleanup Strategy

-- Cleanup script for test isolation
DELETE FROM read_cycles WHERE name LIKE 'Test Cycle%' OR name LIKE 'API Test%';
DELETE FROM audit_trail WHERE action LIKE '%Test%';
-- Additional cleanup as needed

Performance Benchmarks & SLA Definitions

Response Time Requirements

Operation Type

Target Response Time

Maximum Acceptable

Measurement Method

Page Loads

< 3 seconds

< 5 seconds

Browser timing API

API Calls

< 1 second

< 2 seconds

Server response time

Real-time Updates

< 2 seconds

< 3 seconds

UI update timing

Database Queries

< 500ms

< 1 second

Query execution time

File Exports

< 10 seconds

< 30 seconds

Download completion

Mobile Sync

< 2 minutes

< 5 minutes

Cross-platform timing

Throughput Requirements

System Component

Target Throughput

Peak Capacity

Monitoring Alert

Concurrent Users

50 users

75 users

> 60 users

API Requests

100 req/sec

150 req/sec

> 120 req/sec

Database Connections

20 connections

50 connections

> 40 connections

File Processing

1000 records/min

2000 records/min

< 500 records/min

System Resource Limits

Resource Type

Normal Usage

Maximum Acceptable

Alert Threshold

CPU Usage

< 60%

< 85%

> 75%

Memory Usage

< 70%

< 90%

> 80%

Disk I/O

< 50%

< 80%

> 70%

Network Bandwidth

< 40%

< 70%

> 60%


Risk Assessment & Mitigation Strategies

High-Risk Test Areas

1. Real-time Data Synchronization (Risk Level: High)

Risk Factors:
- Complex mathematical calculations across multiple routes
- UI updates dependent on backend processing
- Integration with multiple external systems

Mitigation Strategies:
- Extensive automated regression testing
- Performance monitoring with alerts
- Fallback to cached data when services unavailable
- Progressive loading for large datasets

Test Coverage:
- TC_002: Real-time dashboard updates
- TC_006: Integration testing
- API_002: Dashboard API performance

2. Mobile-Web Integration (Risk Level: High)

Risk Factors:
- Cross-platform data consistency requirements
- Network connectivity variations in field
- Offline capability requirements

Mitigation Strategies:
- Comprehensive end-to-end testing
- Offline scenario validation
- Data conflict resolution mechanisms
- Robust sync failure handling

Test Coverage:
- TC_009: Mobile integration end-to-end
- TC_008: Error handling and recovery
- Performance testing with mobile scenarios

3. System Integration Dependencies (Risk Level: Medium-High)

Risk Factors:
- Dependency on CX, MX, ONB external services
- Network latency and timeout scenarios
- Data consistency across systems

Mitigation Strategies:
- Health check validation before test execution
- Graceful degradation testing
- Circuit breaker pattern implementation
- Comprehensive error handling validation

Test Coverage:
- TC_006: System integration validation
- TC_008: Error handling scenarios
- API performance testing

Risk Mitigation Test Schedule

Risk Category

Validation Frequency

Test Types

Success Criteria

Critical Path

Daily

Smoke tests

100% pass rate

Integration Points

Bi-weekly

Integration tests

95% pass rate

Performance

Weekly

Load tests

All SLAs met

Data Consistency

Per release

Full regression

90% pass rate


Test Execution Analytics & Reporting

BrowserStack Test Management Reports Support

Report Category 1-5: Engineering Focus

1. Module Coverage Report
   - Test cases per module/feature
   - Code coverage mapping
   - Defect density by module

2. Performance Benchmark Report  
   - Response time trends
   - Throughput measurements
   - Resource utilization metrics

3. Integration Health Report
   - External dependency status
   - API performance metrics
   - Service reliability scores

4. Automation ROI Report
   - Automated vs manual test ratio
   - Execution time savings
   - Maintenance effort tracking

5. Quality Metrics Dashboard
   - Pass/fail rates by priority
   - Defect detection effectiveness
   - Test stability indicators

Report Category 6-10: Product & Business Focus

6. Feature Readiness Report
   - Acceptance criteria coverage
   - User story completion status
   - Release readiness assessment

7. Customer Impact Analysis
   - Critical path test results
   - Revenue-impacting feature status
   - Customer segment risk assessment

8. Business Priority Alignment
   - Must-have vs nice-to-have coverage
   - Business rule validation status
   - Compliance requirement tracking

9. Release Quality Summary
   - Overall system health score
   - Critical defect summary
   - Go/no-go recommendation

10. Trend Analysis Report
    - Quality improvement trends
    - Performance degradation tracking
    - Regression test effectiveness

Report Category 11-17: Operations & Management Focus

11. Test Execution Efficiency
    - Test case execution times
    - Resource utilization optimization
    - Test environment utilization

12. Defect Lifecycle Tracking
    - Bug discovery rates
    - Resolution time tracking
    - Defect prevention metrics

13. Risk Assessment Dashboard
    - High-risk area identification
    - Mitigation strategy effectiveness
    - Risk trend analysis

14. Stakeholder Communication
    - Executive summary reports
    - Customer success metrics
    - Support team readiness

15. Compliance & Audit Trail
    - Test evidence documentation
    - Regulatory requirement coverage
    - Audit trail completeness

16. Cross-Team Collaboration
    - Engineering-QA handoff metrics
    - Product-QA alignment tracking
    - Support escalation patterns

17. Strategic Planning Support
    - Test strategy effectiveness
    - Resource planning insights
    - Technology debt identification

Test Metrics Collection Framework

// Test Metrics Collection Example
const testMetrics = {
  executionMetrics: {
    totalTests: 12,
    passedTests: 11,
    failedTests: 1,
    executionTime: '3.5 hours',
    averageTestTime: '17.5 minutes'
  },
  performanceMetrics: {
    apiResponseTime: '0.8 seconds',
    pageLoadTime: '2.4 seconds',
    realTimeUpdates: '1.6 seconds'
  },
  businessMetrics: {
    criticalPathCoverage: '100%',
    revenueImpactingFeatures: '95% tested',
    customerSegmentCoverage: 'All segments'
  },
  qualityMetrics: {
    defectDetectionRate: '94%',
    falsePositiveRate: '2%',
    testStabilityScore: '97%'
  }
};

Execution Schedule & Resource Planning

Weekly Test Execution Calendar

Day

Test Suite

Duration

Resources

Environment

Monday

Smoke Tests

30 min

Automated

Staging

Tuesday

Regression Suite

3 hours

QA Team + Automation

Staging

Wednesday

Performance Tests

2 hours

Performance Engineer

Perf Environment

Thursday

Integration Tests

2.5 hours

QA + DevOps

Integration Environment

Friday

Full Test Suite

5 hours

Full QA Team

Pre-Production

Resource Allocation Matrix

Test Type

Manual Effort

Automation Effort

Tools Required

Skill Level

Functional Tests

40%

60%

Selenium, TestNG

Mid-level QA

API Tests

20%

80%

Postman, Newman

Senior QA

Performance Tests

10%

90%

JMeter, New Relic

Performance Engineer

Integration Tests

50%

50%

Custom tools

Senior QA + DevOps

Mobile Tests

70%

30%

Appium, Device lab

Mobile QA Specialist

Success Criteria & Exit Conditions

Release Go/No-Go Criteria

✅ Smoke Test Suite: 100% pass rate
✅ Critical Test Cases (P1): 100% pass rate  
✅ High Priority Test Cases (P2): 95% pass rate
✅ Performance SLAs: All targets met
✅ Integration Tests: 95% pass rate
✅ No critical or high-severity open defects
✅ Mobile integration: Core flows working
✅ Security validation: No high-risk issues

Test Completion Criteria

✅ All planned test cases executed
✅ Defect backlog reviewed and prioritized
✅ Performance benchmarks documented
✅ Risk assessment completed
✅ Stakeholder sign-off obtained
✅ Test evidence archived
✅ Lessons learned documented

Conclusion

This comprehensive test suite for Read Cycle Management (MX02US02) provides complete coverage of functional, integration, performance, and mobile testing requirements. The test cases are designed to support all 17 BrowserStack test management reports while ensuring high-quality delivery for small and medium utility companies.

Key Deliverables Summary:

  1. 12 Detailed Test Cases with comprehensive validation points
  2. 4 Test Suite Configurations for different execution scenarios
  3. Performance Benchmarks with specific SLA targets
  4. Integration Testing Strategy for CX/MX/ONB systems
  5. Mobile Integration Validation for field operations
  6. Risk Assessment Matrix with mitigation strategies
  7. Complete Test Data Management approach
  8. Execution Analytics Framework for continuous improvement

The test suite ensures robust validation of the Read Cycle Management system while maintaining focus on business value, customer impact, and operational efficiency for utility companies.