Read Cycle Management (MX02US02)
Read Cycle Management - Comprehensive Test Suite (MX02US02)
Executive Summary
Project: Utility Meter Compass - Read Cycle Management
User Story: MX02US02
Test Suite Version: 1.0
Created Date: January 28, 2025
Target Customer: Small & Medium Utilities
Platform: Web Application (Chrome Browser)
Test Coverage Overview
- Total Test Cases: 12 (10 Functional + 2 API)
- Critical Test Cases: 7 (P1 Priority)
- Performance Benchmarks: API < 1s, Page Load < 3s
- Integration Points: CX, MX, ONB, Mobile App
- Automation Coverage: 65% planned automation
Test Scenario Analysis
A. Functional Test Scenarios Summary
Category | Scenarios | Priority | Business Impact |
---|---|---|---|
Core Functionality | 4 scenarios | P1-Critical | Revenue Impact High |
Business Rules | 3 scenarios | P2-High | Compliance & Validation |
Integration | 3 scenarios | P1-Critical | System Dependencies |
Performance | 2 scenarios | P2-High | User Experience |
B. Risk Assessment Matrix
Risk Area | Probability | Impact | Mitigation | Test Cases |
---|---|---|---|---|
Real-time Data Sync | Medium | High | Automated monitoring | TC_002, TC_006 |
Mobile Integration | Low | Critical | Comprehensive testing | TC_009, API_002 |
System Integration | Medium | Critical | Dependency testing | TC_006, TC_008 |
Performance Degradation | Low | High | Load testing | TC_007 |
Detailed Test Cases
TC_001: Create Basic Read Cycle - Happy Path [CRITICAL]
Test Case Metadata
Test Case ID: MX02US02_TC_001
Title: Create Read Cycle with Valid Basic Information - End to End Flow
Created By: QA Automation Team
Created Date: January 28, 2025
Version: 1.0
Last Updated: January 28, 2025
Classification & Tagging
Module/Feature: Read Cycle Creation
Test Type: Functional End-to-End
Test Level: System Integration
Priority: P1-Critical
Execution Phase: Smoke Testing
Automation Status: Planned-for-Automation
Estimated Automation Effort: 8 hours
Tags: MOD-ReadCycle, P1-Critical, Phase-Smoke, Type-E2E-Functional, Platform-Web,
Report-Engineering, Report-Product, Report-QA, Customer-SMB-Medium,
Risk-High, Business-Critical, Revenue-Impact-High, Integration-CX-MX-ONB,
Mobile-Dependency, Core-Feature, Daily-Execution
Business Context
Customer_Segment: Small & Medium Utilities
Revenue_Impact: High (Core billing dependency)
Business_Priority: Must-Have
Customer_Journey: Daily Operations - Core Workflow
Compliance_Required: No
SLA_Related: Yes (< 3s page load, < 1s API response)
Feature_Category: Core Business Logic
Quality & Performance Metrics
Risk_Level: High
Complexity_Level: Medium
Expected_Execution_Time: 8 minutes
Reproducibility_Score: High
Data_Sensitivity: Medium (Consumer PII)
Failure_Impact: Critical (Blocks read cycle operations)
Performance_Baseline: Page load < 3s, API calls < 1s
Coverage Tracking
Feature_Coverage: 100% of basic creation workflow
Integration_Points: CX (Consumer Data), MX (Meter Inventory), ONB (Area Validation)
Code_Module_Mapped: ReadCycleController, RouteService, MeterDashboardService
Requirement_Coverage: Complete (AC-1, AC-2, AC-7, BR-1, BR-2, BR-6)
Cross_Platform_Support: Web Primary, Mobile Secondary
Business_Rule_Coverage: Unique naming, route validation, duration limits
Stakeholder Reporting Matrix
Primary_Stakeholder: Product Management
Secondary_Stakeholders: Engineering, Customer Success
Report_Categories: Quality-Dashboard, Module-Coverage, Business-Critical-Features,
Daily-Smoke-Results, Customer-Impact-Tracking
Trend_Tracking: Yes (Daily execution trends)
Executive_Visibility: Yes (Critical path feature)
Customer_Impact_Level: High (Direct operational impact)
SLA_Monitoring: Yes (Performance benchmarks)
Requirements Traceability
Related_Requirements:
- AC-1: Unique read cycle names
- AC-2: Dashboard counter updates
- AC-7: Route selection with real-time metrics
- BR-1: Duration validation 1-90 days
- BR-2: Route conflict prevention
- BR-6: Audit trail creation
Related_Bugs: N/A (New feature)
Related_Test_Cases:
- Depends on: Login functionality verification
- Blocks: MX02US02_TC_002 (Route Selection), MX02US02_TC_004 (Scheduling)
- Related: MX02US02_TC_006 (Integration Testing)
Test Environment Configuration
Environment: Staging Environment
Browser/Version: Chrome 115+ (Primary), Firefox 110+ (Secondary)
Device/OS Configuration:
- Primary: Windows 10/11 Desktop
- Secondary: macOS 12+ Desktop
Screen_Resolution: 1920x1080 (Primary), 1366x768 (Secondary)
Network: Standard corporate network (>10Mbps)
System Dependencies
External Dependencies:
- CX Service: Customer data API (health check required)
- MX Service: Meter inventory API (health check required)
- ONB Service: Area/sub-area validation (health check required)
- Database: PostgreSQL cluster (read/write access)
Performance_Baseline: API response < 1s, Page load < 3s
Fallback_Strategy: Graceful degradation with error messages
Test Data Requirements
User Account:
- Username: supervisor.test@utilitycompany.com
- Role: Meter Reading Supervisor
- Permissions: Full read cycle management access
Master Data Setup:
- Areas: Downtown District, North Residential, Industrial Zone
- Sub-Areas: Commercial Zone A, Residential Block 1, Manufacturing District
- Utility Services: Water, Electricity, Gas
- Routes: Minimum 5 routes with 20+ meters each
- Meters: Mixed conditions (Normal, Faulty, RCNT, Disconnected)
Test Cycle Data:
- Read Cycle Name: "Test Cycle - April 2025 Downtown Commercial"
- Area: "Downtown District"
- Sub Area: "Commercial Zone A"
- Utility Service: "Water"
- Cycle Duration: 30 days
- Routes to Select: 3 routes (Downtown Route A, B, C)
- Expected Total Meters: ~80 meters
Prerequisites & Setup
Setup_Requirements:
1. User authenticated as Meter Reading Supervisor
2. All external services (CX, MX, ONB) operational
3. Test routes configured with active meters
4. Database in clean state (no conflicting test data)
5. Browser cache cleared
User_Roles_Permissions: Meter Reading Supervisor with full CRUD access
Prior_Test_Cases:
- Login functionality verified
- Dashboard accessibility confirmed
- Master data validation completed
Detailed Test Procedure
Step | Action | Expected Result | Test Data | Validation Points | Comments |
---|---|---|---|---|---|
Setup Phase | |||||
1 | Navigate to Utility Meter Compass login | Login page loads within 3 seconds | URL: /auth/login | Page elements visible, no JS errors | Performance baseline |
2 | Login with supervisor credentials | Successful authentication, redirect to dashboard | supervisor.test@utilitycompany.com | User session established | Security validation |
3 | Verify dashboard accessibility | Dashboard loads with metrics visible | N/A | Active/Completed/Delayed counters displayed | Baseline state capture |
Read Cycle Creation Flow | |||||
4 | Click "Read Cycles" in navigation menu | Read Cycles page loads within 3 seconds | N/A | Page title, breadcrumb, create button visible | Navigation functionality |
5 | Capture initial dashboard metrics | Note current Active/Completed/Delayed counts | Record: Active=X, Completed=Y, Delayed=Z | Baseline for increment validation | State tracking |
6 | Click "Create Read Cycle" button | Create form modal/page opens | N/A | All form fields visible, validation ready | Form initialization |
Basic Information Entry | |||||
7 | Enter Read Cycle Name | Field accepts input, no validation errors | "Test Cycle - April 2025 Downtown Commercial" | Text entered correctly, unique name validation | Uniqueness check |
8 | Select Area from dropdown | Dropdown populates, selection triggers sub-area refresh | "Downtown District" | Sub-area dropdown updates, dependent field logic | Cascading dropdown |
9 | Select Sub Area | Sub-area filtered by area selection | "Commercial Zone A" | Correct filtering, selection accepted | Data dependency |
10 | Select Utility Service | Service selection locked after choosing | "Water" | Selection confirmed, field becomes non-editable | Business rule |
11 | Enter Cycle Duration | Numeric field accepts valid range | 30 | Value accepted, no validation error | Range validation |
12 | Verify form validation state | All required fields completed, no errors | N/A | Form ready for route selection | Validation summary |
Route Selection & Real-time Updates | |||||
13 | View Available Routes table | Routes displayed with accurate meter counts | N/A | Route names, read types, meter counts visible | Data loading |
14 | Verify Meter Dashboard initial state | System-wide metrics displayed correctly | Expected: 850 total meters | Baseline metrics accurate | Data accuracy |
15 | Select first route (Downtown Route A) | Route selected, dashboard updates immediately | Downtown Route A (32 meters) | Checkbox checked, cycle metrics update | Real-time calculation |
16 | Verify meter dashboard update | "Meters in This Cycle" shows 32 | Cycle meters: 32 | Real-time calculation accurate | Dynamic update |
17 | Select second route (Downtown Route B) | Dashboard shows cumulative total | Downtown Route B (24 meters) | Total cycle meters: 56 (32+24) | Additive calculation |
18 | Select third route (Downtown Route C) | Dashboard shows final total | Downtown Route C (29 meters) | Total cycle meters: 85 (32+24+29) | Cumulative total |
19 | Verify meter conditions breakdown | Normal/Faulty/RCNT/Others counts display | Based on selected routes | Condition distribution accurate | Detailed metrics |
20 | Verify meter categories breakdown | Residential/Commercial/Industrial counts | Based on selected routes | Category distribution accurate | Classification metrics |
21 | Verify consumer metrics | Active/Inactive/Disconnected counts | Based on selected routes | Consumer totals accurate | Consumer tracking |
Read Cycle Summary Validation | |||||
22 | Review Read Cycle Summary panel | Summary shows correct totals | Routes: 3, Meters: 85, Duration: 30 days | All calculations match selections | Summary accuracy |
23 | Verify Selected Routes counter | Shows "Selected Routes (3)" | 3 routes selected | Counter matches actual selections | Selection tracking |
24 | Validate all data consistency | Cross-check all displayed metrics | All dashboard data | No discrepancies in calculations | Data integrity |
Read Cycle Creation Completion | |||||
25 | Click "Create Read Cycle" button | Success message appears, processing initiated | N/A | Loading indicator, then success message | User feedback |
26 | Verify redirect to cycle details | Redirected to new cycle's detail view | N/A | Cycle details page loads with correct data | Navigation flow |
27 | Validate cycle details accuracy | All entered data displayed correctly | All previous inputs | Data persistence validated | Data accuracy |
28 | Check reading period display | Current date range shown prominently | Apr 1 - Apr 30, 2025 | Date calculation correct | Date logic |
Post-Creation Validation | |||||
29 | Navigate back to Read Cycles list | New cycle appears in table | N/A | Cycle listed with correct metadata | List integration |
30 | Verify dashboard counter update | Active Cycles counter increased by 1 | Previous count + 1 | Counter increment confirmed | State update |
31 | Check audit trail entry | Creation logged with timestamp and user | User: supervisor.test, Action: Created | Audit entry accurate | Audit logging |
32 | Verify route assignment | Selected routes no longer available for other cycles | Routes A, B, C | Route exclusivity enforced | Business rule |
Comprehensive Verification Points
Primary Verification (Pass/Fail Criteria)
✅ Read cycle created successfully with unique name
✅ All selected routes assigned exclusively to new cycle
✅ Dashboard counters updated accurately (Active Cycles +1)
✅ Cycle appears in list view with correct metadata
✅ Real-time meter calculations performed accurately throughout selection
✅ All business rules enforced (unique naming, duration limits, route exclusivity)
Secondary Verifications (Quality Assurance)
✅ Page load times < 3 seconds for all pages
✅ API response times < 1 second for all calls
✅ Real-time updates complete within 2 seconds
✅ No JavaScript errors in browser console
✅ Audit trail entry created with correct timestamp and user
✅ Integration with CX/MX/ONB systems successful
✅ Mobile app receives cycle data for field operations
✅ All form validations working correctly
✅ User experience smooth with appropriate loading indicators
Negative Verifications (Should NOT occur)
❌ Duplicate cycle names should be rejected
❌ Routes should not be assignable to multiple active cycles
❌ Invalid duration values should be rejected
❌ System should not allow creation with zero routes selected
❌ Dashboard metrics should not show incorrect calculations
❌ Page should not become unresponsive during creation
❌ Data should not be lost during form submission
Performance Validations
⏱️ Initial page load: < 3 seconds
⏱️ Route selection response: < 1 second
⏱️ Dashboard update time: < 2 seconds
⏱️ Form submission processing: < 3 seconds
⏱️ Database query response: < 500ms
⏱️ Integration API calls: < 1 second each
Integration Validations
🔗 CX System: Consumer data synchronized
🔗 MX System: Meter inventory accurate
🔗 ONB System: Area/sub-area validation successful
🔗 Mobile App: Cycle data available for field readers
🔗 Database: All data persisted correctly
🔗 Audit System: Complete activity trail logged
Test Results Template
Execution_Status: [Pass/Fail/Blocked/Not-Tested]
Execution_Date: [Date of test execution]
Executed_By: [Tester name/automation system]
Execution_Time: [Actual time taken in minutes]
Browser_Used: [Chrome version, Firefox version, etc.]
Environment: [Staging/Production/Dev]
Performance_Results:
- Page_Load_Time: [X.X seconds]
- API_Response_Times: [List of times]
- Real_Time_Updates: [X.X seconds]
Integration_Results:
- CX_Service_Status: [Success/Failure]
- MX_Service_Status: [Success/Failure]
- ONB_Service_Status: [Success/Failure]
- Mobile_Sync_Status: [Success/Failure]
Defects_Found: [Bug IDs if issues discovered]
Screenshots_Evidence: [Paths to evidence files]
Additional_Notes: [Any relevant observations]
Test Execution Analytics
Execution_Frequency: Daily (Smoke test suite)
Maintenance_Effort: Low (Stable test case)
Automation_ROI: High (Critical path, frequent execution)
Automation_Complexity: Medium (UI interactions + API validations)
Expected_Failure_Rate: < 2% (Stable functionality)
Test Relationships & Dependencies
Blocking_Tests:
- User authentication and login
- Master data setup validation
- System health checks
Blocked_Tests:
- MX02US02_TC_002 (Route Selection Validation)
- MX02US02_TC_004 (Read Cycle Scheduling)
- MX02US02_TC_005 (Audit Trail Verification)
Parallel_Execution:
- Can run in parallel with other modules' tests
- Cannot run parallel with other read cycle tests (data conflicts)
Sequential_Dependencies:
- Must run before: Edit cycle, Delete cycle, Schedule cycle tests
- Should run after: System setup and health check tests
TC_002: Route Selection with Real-time Dashboard Updates [CRITICAL]
Test Case Metadata
Test Case ID: MX02US02_TC_002
Title: Validate Real-time Meter Dashboard Updates During Route Selection Process
Created By: QA Automation Team
Created Date: January 28, 2025
Version: 1.0
Classification & Tagging
Module/Feature: Route Selection & Real-time UI Updates
Test Type: Functional Integration
Test Level: Integration Testing
Priority: P1-Critical
Execution Phase: Regression Testing
Automation Status: High Priority for Automation
Tags: MOD-RouteSelection, MOD-RealTimeUpdates, P1-Critical, Phase-Regression,
Type-Integration-UI, Platform-Web, Report-Engineering, Report-Product,
Customer-All-Utilities, Risk-Medium, Business-High, Revenue-Impact-Medium,
Integration-MX-Real-time, Performance-Sensitive, UI-Responsiveness
Business Context
Customer_Segment: All Utility Companies
Revenue_Impact: Medium (Affects operational efficiency)
Business_Priority: Must-Have (Core UX feature)
Customer_Journey: Daily Operations - Route Planning
Compliance_Required: No
SLA_Related: Yes (< 2s real-time updates)
Quality Metrics
Risk_Level: Medium
Complexity_Level: High (Real-time calculations)
Expected_Execution_Time: 10 minutes
Reproducibility_Score: High
Data_Sensitivity: Low
Failure_Impact: High (Poor user experience)
Performance_Baseline: UI updates < 2s, No UI freezing
Test Environment & Dependencies
Environment: Staging
Browser/Version: Chrome 115+
Dependencies: MX Service (Meter data), Test routes with varied meter counts
Performance_Requirements: Real-time updates < 2 seconds
Test_Data: Routes with different meter counts, conditions, and categories
Prerequisites
1. User logged in as Meter Reading Supervisor
2. Navigate to Create Read Cycle form
3. Basic information fields completed
4. Available routes table displayed
5. Initial meter dashboard showing system-wide metrics
Detailed Test Procedure
Step | Action | Expected Result | Test Data | Performance Check | Validation |
---|---|---|---|---|---|
Baseline State Verification | |||||
1 | Capture initial dashboard state | All system-wide metrics displayed | System Meters: 850 total | Dashboard loads < 2s | Baseline accuracy |
2 | Verify "Meters in This Cycle" shows zero | Cycle-specific metrics at zero | Cycle Meters: 0 | N/A | Initial state |
3 | Note initial route table state | All routes unchecked, selectable | 5+ routes available | Table loads < 3s | Data loading |
Single Route Selection Testing | |||||
4 | Select Downtown Route A checkbox | Route selected, dashboard updates immediately | Route A: 32 meters | Update < 2s | Real-time response |
5 | Verify cycle meter count update | "Meters in This Cycle" shows 32 | Active: 32, Inactive: 0 | Calculation accurate | Math validation |
6 | Check meter conditions update | Normal/Faulty/RCNT counts display | Based on Route A meters | Breakdown accurate | Condition tracking |
7 | Verify meter categories update | Residential/Commercial distribution | Based on Route A | Category distribution | Classification |
8 | Confirm consumer metrics update | Active/Inactive consumer counts | Based on Route A | Consumer totals | Consumer tracking |
9 | Validate system-wide metrics unchanged | System totals remain constant | Still 850 total | No impact on system | Data integrity |
Multiple Route Selection Testing | |||||
10 | Select Downtown Route B checkbox | Cumulative totals update | Route B: 24 meters | Update < 2s | Additive calculation |
11 | Verify cumulative meter count | Total shows 56 meters (32+24) | Total: 56 | Math correct | Addition logic |
12 | Check conditions recalculation | Combined Normal/Faulty/RCNT counts | Routes A+B combined | Aggregate accurate | Condition aggregation |
13 | Verify categories recalculation | Combined category distribution | Routes A+B combined | Category totals | Classification totals |
14 | Select Downtown Route C checkbox | Further cumulative update | Route C: 29 meters | Update < 2s | Continued addition |
15 | Verify final cumulative total | Total shows 85 meters (32+24+29) | Total: 85 | Math correct | Final calculation |
Deselection Testing | |||||
16 | Deselect Downtown Route A | Totals decrease by Route A meters | Remove 32 meters | Update < 2s | Subtraction logic |
17 | Verify adjusted totals | Total shows 53 meters (24+29) | Total: 53 | Math correct | Subtraction validation |
18 | Check conditions recalculation | Conditions without Route A | Routes B+C only | Recalculation accurate | Dynamic adjustment |
19 | Verify categories adjustment | Categories without Route A | Routes B+C only | Category adjustment | Dynamic categories |
Bulk Operations Testing | |||||
20 | Click "Select All" button | All available routes selected | All routes checked | Bulk operation < 3s | Mass selection |
21 | Verify total calculation | Dashboard shows sum of all routes | All route meters summed | Calculation accurate | Bulk calculation |
22 | Check performance during bulk update | UI remains responsive | All routes data | No UI freezing | Performance validation |
23 | Click "Clear All" button | All routes deselected | No routes checked | Bulk clear < 2s | Mass deselection |
24 | Verify dashboard reset | All cycle metrics return to zero | Cycle metrics: 0 | Reset accurate | Bulk reset |
Search and Filter Testing | |||||
25 | Enter search term in route filter | Routes filtered by search term | Search: "Commercial" | Filter < 1s | Search functionality |
26 | Select filtered route | Only filtered routes affect dashboard | Commercial routes only | Calculation accurate | Filtered calculation |
27 | Clear search filter | All routes visible again | Clear search | Filter clear < 1s | Filter reset |
28 | Verify dashboard recalculation | Metrics reflect current selections | Current state accurate | Recalculation correct | State consistency |
Edge Case Testing | |||||
29 | Rapidly select/deselect routes | System handles rapid changes | Multiple rapid clicks | No UI lag/errors | Stress testing |
30 | Test with maximum routes | Select maximum available routes | All system routes | Performance acceptable | Scalability test |
Comprehensive Verification Points
Primary Verification
✅ Dashboard updates within 2 seconds of each route selection/deselection
✅ Mathematical calculations accurate for all operations (addition/subtraction)
✅ Real-time updates maintain data consistency throughout process
✅ System-wide metrics remain unchanged during cycle-specific updates
✅ UI remains responsive during all operations, no freezing
Secondary Verification
✅ Meter conditions accurately aggregated across multiple routes
✅ Meter categories correctly calculated and displayed
✅ Consumer metrics properly updated with route changes
✅ Search and filter operations work smoothly with real-time updates
✅ Bulk operations (Select All/Clear All) perform within acceptable time
Performance Verification
⏱️ Individual route selection response: < 2 seconds
⏱️ Bulk operations completion: < 3 seconds
⏱️ Search filter application: < 1 second
⏱️ Dashboard calculation time: < 500ms
⏱️ UI responsiveness maintained throughout
Negative Verification
❌ Dashboard should not show incorrect calculations
❌ System should not freeze during rapid selections
❌ Real-time updates should not fail or timeout
❌ Mathematical errors should not accumulate
❌ UI should not become unresponsive
TC_003: Business Rule Validation - Cycle Duration and Constraints [HIGH]
Test Case Metadata
Test Case ID: MX02US02_TC_003
Title: Comprehensive Business Rule Validation for Read Cycle Constraints
Created By: QA Team
Created Date: January 28, 2025
Version: 1.0
Classification & Tagging
Module/Feature: Business Rules Validation
Test Type: Functional Validation
Test Level: System Testing
Priority: P2-High
Execution Phase: Regression Testing
Automation Status: Manual Testing Required
Tags: MOD-BusinessRules, MOD-Validation, P2-High, Phase-Regression,
Type-Functional-Validation, Platform-Web, Report-QA, Report-Product,
Customer-All, Risk-Medium, Business-Medium, Revenue-Impact-Low,
Validation-Rules, Edge-Cases, Input-Validation
Test Procedure - Cycle Duration Validation
Step | Input Value | Expected Result | Error Message Expected | Business Rule |
---|---|---|---|---|
1 | Duration: 0 | Validation Error | "Duration must be between 1-90 days" | Lower boundary |
2 | Duration: 1 | Accepted | No error | Lower valid boundary |
3 | Duration: 90 | Accepted | No error | Upper valid boundary |
4 | Duration: 91 | Validation Error | "Duration must be between 1-90 days" | Upper boundary exceeded |
5 | Duration: -5 | Validation Error | "Duration must be positive" | Negative value |
6 | Duration: "abc" | Input Rejected | "Please enter a valid number" | Invalid format |
7 | Duration: 30.5 | Auto-rounded to 30 | No error | Decimal handling |
8 | Duration: Empty | Validation Error | "Duration is required" | Required field |
Test Procedure - Unique Naming Validation
Step | Cycle Name | Expected Result | Scenario |
---|---|---|---|
1 | "Test Cycle 001" | Accepted (first time) | New unique name |
2 | "Test Cycle 001" | Error: "Name already exists" | Duplicate name |
3 | "test cycle 001" | Error: "Name already exists" | Case insensitive |
4 | "Test Cycle 002" | Accepted | New unique name |
TC_004: Read Cycle Scheduling with Various Frequencies [CRITICAL]
Test Case Metadata
Test Case ID: MX02US02_TC_004
Title: Comprehensive Read Cycle Scheduling with All Frequency Options
Created By: QA Automation Team
Created Date: January 28, 2025
Version: 1.0
Classification & Tagging
Module/Feature: Read Cycle Scheduling
Test Type: Functional End-to-End
Test Level: System Integration
Priority: P1-Critical
Execution Phase: Acceptance Testing
Automation Status: High Priority for Automation
Tags: MOD-Scheduling, P1-Critical, Phase-Acceptance, Type-E2E-Integration,
Platform-Web-Mobile, Report-Product, Report-Engineering, Customer-All,
Risk-High, Business-Critical, Revenue-Impact-High, Mobile-Integration,
Scheduling-Logic, Field-Operations
Prerequisites
1. Read cycle created successfully (from TC_001)
2. Cycle visible in Read Cycles list
3. Schedule button available and enabled
Test Procedure - Frequency Options Testing
Frequency Type | Configuration | Expected Fields | Test Data | Validation |
---|---|---|---|---|
Once | Single execution | Date, Time | Tomorrow 09:00 | Future date validation |
Hourly | Repeat every hour | Time, End Date | Every hour at :00 | Hourly recurrence |
Daily | Repeat daily | Time, End Date | 09:00 AM daily | Daily recurrence |
Weekly | Repeat weekly | Day of Week, Time | Every Monday 09:00 | Weekly pattern |
Bi-Weekly | Every 2 weeks | 2 Days of Week | Monday & Thursday | Bi-weekly pattern |
Monthly | Monthly repeat | Date of Month | 15th of each month | Monthly pattern |
Bi-Monthly | Every 2 months | 2 Dates | 1st and 15th | Bi-monthly pattern |
Quarterly | Every 3 months | Month, Day | March 15th | Quarterly pattern |
Yearly | Annual repeat | Month, Day | April 1st annually | Annual pattern |
Detailed Test Steps
Step | Action | Expected Result | Integration Point | Mobile Validation |
---|---|---|---|---|
1 | Navigate to Read Cycles list | List displays with Schedule buttons | N/A | N/A |
2 | Click Schedule for test cycle | Schedule modal opens | N/A | N/A |
3 | Select "Once" frequency | Date and time fields appear | N/A | N/A |
4 | Set execution for tomorrow 09:00 | Date/time accepted | N/A | N/A |
5 | Set schedule end date | End date field populated | N/A | N/A |
6 | Click "Schedule" button | Success message, schedule confirmed | Integration with scheduling service | N/A |
7 | Verify "Next 5 Occurrences" | Shows scheduled execution time | N/A | N/A |
8 | Check mobile app integration | Cycle appears in mobile reader app | Mobile API sync | Cycle visible in mobile |
9 | Test "Weekly" frequency | Day selection dropdown appears | N/A | N/A |
10 | Configure weekly Monday execution | Weekly pattern set | N/A | N/A |
11 | Verify mobile sync timing | Mobile app updates within 2 minutes | Real-time sync | Schedule synced |
Integration Verification Points
🔗 Scheduling Service: Cron jobs created correctly
🔗 Mobile App: Scheduled cycles appear for field readers
🔗 Database: Schedule configuration persisted
🔗 Notification System: Alerts configured for execution times
TC_005: Comprehensive Audit Trail Functionality [HIGH]
Test Case Metadata
Test Case ID: MX02US02_TC_005
Title: Verify Complete Audit Trail Logging, Display, and Export Functionality
Created By: QA Team
Created Date: January 28, 2025
Version: 1.0
Classification & Tagging
Module/Feature: Audit Trail & Activity Logging
Test Type: Functional System
Test Level: System Testing
Priority: P2-High
Execution Phase: Regression Testing
Automation Status: Manual Testing Preferred
Tags: MOD-AuditTrail, MOD-Compliance, P2-High, Phase-Regression,
Type-Functional-System, Platform-Web, Report-QA, Report-Compliance,
Customer-Enterprise, Risk-Medium, Business-High, Revenue-Impact-Low,
Compliance-Tracking, Data-Integrity, Historical-Data
Business Context
Customer_Segment: Enterprise Utilities (Compliance focus)
Revenue_Impact: Low (Indirect - compliance support)
Business_Priority: Should-Have
Customer_Journey: Support & Compliance
Compliance_Required: Yes (Audit requirements)
SLA_Related: No
Quality Metrics
Risk_Level: Medium
Complexity_Level: Medium
Expected_Execution_Time: 12 minutes
Reproducibility_Score: High
Data_Sensitivity: Medium (User activity data)
Failure_Impact: Medium (Compliance impact)
Test Procedure - Audit Trail Verification
Step | Action | Expected Result | Audit Entry Expected | Validation Point |
---|---|---|---|---|
Creation Tracking | ||||
1 | Create new read cycle | Cycle created successfully | "Created read cycle 'Test Cycle'" | Creation logged |
2 | Navigate to Audit Trail tab | Tab loads with entries | Creation entry visible | Audit accessible |
3 | Verify entry format | Proper timestamp, user, action format | Format: "28/1/2025, 2:30:00 pm" | Standard format |
4 | Check entry details | Complete action description | "Created read cycle with 3 routes, 85 meters" | Detailed logging |
Modification Tracking | ||||
5 | Edit cycle name (if allowed) | Name updated successfully | "Modified read cycle name from 'Old' to 'New'" | Edit tracking |
6 | Add route to cycle | Route added successfully | "Added route 'Downtown Route D' to cycle" | Route addition |
7 | Remove route from cycle | Route removed successfully | "Removed route 'Downtown Route D' from cycle" | Route removal |
8 | Modify cycle duration | Duration updated | "Changed cycle duration from 30 to 45 days" | Field changes |
Scheduling Tracking | ||||
9 | Schedule read cycle | Schedule created | "Scheduled cycle for weekly execution" | Schedule logging |
10 | Modify schedule | Schedule updated | "Updated schedule frequency from weekly to monthly" | Schedule changes |
11 | Pause scheduled cycle | Cycle paused | "Paused scheduled execution" | Status changes |
12 | Resume paused cycle | Cycle resumed | "Resumed scheduled execution" | Status restoration |
Mobile Integration Tracking | ||||
13 | Submit reading via mobile | Reading recorded | "Reading submitted for meter M123456" | Mobile activity |
14 | Complete route via mobile | Route completed | "Route 'Downtown A' completed by field reader" | Mobile completion |
15 | Report issue via mobile | Issue logged | "Access issue reported for meter M234567" | Issue tracking |
System Activity Tracking | ||||
16 | Auto-assignment trigger | System action logged | "Auto-assigned 2 remaining routes" | System actions |
17 | Data validation warning | Warning logged | "Detected 3 abnormal readings in Route B" | System warnings |
18 | Integration sync | Sync activity logged | "Synchronized with CX system" | Integration tracking |
Audit Trail Display Verification
Test Area | Verification Point | Expected Behavior | Data Validation |
---|---|---|---|
Chronological Order | Entry sorting | Latest entries at top | Timestamp descending |
User Attribution | User identification | Correct user names | Session user tracking |
Action Classification | Status indicators | Success/Warning/Info/Error | Visual status coding |
Detail Completeness | Information depth | Old/new values shown | Complete change tracking |
Timestamp Accuracy | Time recording | Accurate timestamps | Server time sync |
Immutability | Entry modification | Entries cannot be edited | Data integrity |
Filter and Search Testing
Step | Filter/Search Action | Expected Result | Data Set | Validation |
---|---|---|---|---|
1 | Filter by date range | Entries within range shown | Last 7 days | Date filtering |
2 | Filter by user | Only selected user's actions | Specific user | User filtering |
3 | Filter by action type | Only creation actions shown | "Created" actions | Type filtering |
4 | Search by keywords | Matching entries displayed | "route" keyword | Text search |
5 | Combine multiple filters | Intersection of filters applied | Date + User + Type | Combined filtering |
6 | Clear all filters | All entries visible again | Full dataset | Filter reset |
Export and Reporting
Step | Export Action | Expected Result | File Validation | Content Check |
---|---|---|---|---|
1 | Export all entries | CSV file downloaded | Valid CSV format | All entries included |
2 | Export filtered entries | Only filtered data exported | Filtered subset | Filter applied |
3 | Export to PDF | PDF report generated | Valid PDF format | Formatted report |
4 | Verify export completeness | All columns included | Complete data | No data loss |
5 | Test large dataset export | 1000+ entries exported | Performance acceptable | Scalability |
TC_006: System Integration Validation - CX/MX/ONB [CRITICAL]
Test Case Metadata
Test Case ID: MX02US02_TC_006
Title: Comprehensive System Integration Testing with CX, MX, and ONB Services
Created By: QA Integration Team
Created Date: January 28, 2025
Version: 1.0
Classification & Tagging
Module/Feature: System Integration
Test Type: Integration End-to-End
Test Level: Integration Testing
Priority: P1-Critical
Execution Phase: Integration Testing
Automation Status: Automated (API Level)
Tags: MOD-Integration, MOD-SystemIntegration, P1-Critical, Phase-Integration,
Type-E2E-Integration, Platform-Web-API, Report-Engineering, Report-Architecture,
Customer-All, Risk-High, Business-Critical, Revenue-Impact-High,
External-Dependencies, API-Integration, Service-Mesh
Business Context
Customer_Segment: All Utility Companies
Revenue_Impact: High (Core system dependencies)
Business_Priority: Must-Have
Customer_Journey: All Operations
Compliance_Required: No
SLA_Related: Yes (< 1s API response)
Integration Test Matrix
Integration Point | Test Scenario | API Endpoint | Expected Response | Failure Handling |
---|---|---|---|---|
CX Integration | ||||
CX-001 | Consumer data sync | GET /cx/consumers | Consumer list with active status | Graceful degradation |
CX-002 | Consumer validation | POST /cx/validate | Validation success/failure | Error message display |
CX-003 | Billing integration | POST /cx/billing-cycles | Billing cycle creation | Retry mechanism |
MX Integration | ||||
MX-001 | Meter inventory sync | GET /mx/meters | Meter list with conditions | Cache fallback |
MX-002 | Route meter mapping | GET /mx/routes/{id}/meters | Route-specific meters | Default data |
MX-003 | Meter condition updates | PUT /mx/meters/{id}/condition | Condition update success | Status notification |
ONB Integration | ||||
ONB-001 | Area validation | GET /onb/areas | Available areas list | Limited area access |
ONB-002 | Sub-area dependencies | GET /onb/areas/{id}/subareas | Filtered sub-areas | Show all sub-areas |
ONB-003 | Geographic boundaries | GET /onb/boundaries | Geographic data | Map unavailable |
Detailed Integration Test Procedure
Step | Integration Action | System Response | API Validation | Error Scenario |
---|---|---|---|---|
CX System Integration | ||||
1 | Create read cycle | CX API called for consumer validation | API response < 1s | CX service unavailable |
2 | Verify consumer data sync | Consumer counts match CX system | Data consistency | Partial data sync |
3 | Update consumer status | Status reflected in CX system | Bidirectional sync | Sync failure |
4 | Generate billing cycle | CX receives meter reading schedule | Integration success | Billing system error |
MX System Integration | ||||
5 | Load route meters | MX provides accurate meter inventory | Meter data current | MX service down |
6 | Update meter conditions | Condition changes sync to MX | Real-time updates | Update failure |
7 | Meter reading submission | Readings stored in MX system | Data persistence | Storage failure |
8 | Meter status validation | Status checks against MX data | Validation accurate | Validation service error |
ONB System Integration | ||||
9 | Area dropdown population | ONB provides area hierarchy | Geographic data loaded | ONB unavailable |
10 | Sub-area filtering | Dependent dropdowns work correctly | Cascading data | Incomplete hierarchy |
11 | Boundary validation | Geographic constraints enforced | Boundary checks | Validation bypass |
12 | Configuration sync | ONB settings applied correctly | Configuration current | Config out of sync |
API Performance Testing
API Call | Performance Target | Load Test Scenario | Expected Throughput | Failure Threshold |
---|---|---|---|---|
CX Consumer API | < 1 second | 50 concurrent requests | 100 req/sec | > 3 seconds |
MX Meter API | < 500ms | 100 concurrent requests | 200 req/sec | > 2 seconds |
ONB Area API | < 1 second | 25 concurrent requests | 50 req/sec | > 3 seconds |
Integration Failure Scenarios
Failure Type | Simulation Method | Expected Behavior | User Impact | Recovery Test |
---|---|---|---|---|
CX Service Down | Service mock unavailable | Error message, graceful degradation | Limited consumer data | Auto-retry mechanism |
MX Partial Failure | Timeout simulation | Cached data used, warning shown | Meter counts approximate | Manual refresh |
ONB Connectivity | Network disruption | Default areas shown, notification | Reduced area selection | Service restoration |
Multiple Service Failure | Cascade failure test | System remains functional | Core features limited | Sequential recovery |
Data Consistency Verification
Data Point | Source System | Validation Method | Consistency Check | Discrepancy Handling |
---|---|---|---|---|
Consumer Count | CX System | Cross-reference query | Exact match required | Data sync alert |
Meter Inventory | MX System | Real-time validation | 99% accuracy target | Variance notification |
Area Hierarchy | ONB System | Structure validation | Complete hierarchy | Fallback options |
Route Assignments | All Systems | Cross-system check | No conflicts | Conflict resolution |
TC_007: Performance Testing - Concurrent Users and Load [HIGH]
Test Case Metadata
Test Case ID: MX02US02_TC_007
Title: Performance Testing with Multiple Concurrent Supervisors and System Load
Created By: Performance Testing Team
Created Date: January 28, 2025
Version: 1.0
Classification & Tagging
Module/Feature: System Performance & Scalability
Test Type: Performance Load Testing
Test Level: System Performance
Priority: P2-High
Execution Phase: Performance Testing
Automation Status: Automated (Load Testing Tools)
Tags: MOD-Performance, MOD-Scalability, P2-High, Phase-Performance,
Type-Performance-Load, Platform-Web, Report-Engineering, Report-Operations,
Customer-Enterprise, Risk-Medium, Business-High, Revenue-Impact-Medium,
Load-Testing, Scalability, Concurrent-Users
Performance Test Scenarios
Load Level | Concurrent Users | Test Duration | Key Metrics | Success Criteria |
---|---|---|---|---|
Light Load | 10 users | 15 minutes | Response time, CPU usage | < 1s API, < 3s page load |
Medium Load | 25 users | 30 minutes | Throughput, memory usage | 95% requests successful |
Peak Load | 50 users | 45 minutes | Error rate, stability | < 2% error rate |
Stress Test | 75 users | 30 minutes | Breaking point, recovery | Graceful degradation |
Detailed Performance Test Procedure
Step | Load Configuration | Test Actions | Performance Metrics | Acceptance Criteria |
---|---|---|---|---|
Baseline Performance | ||||
1 | Single user | Create read cycle | Response time | < 3s page load, < 1s API |
2 | Single user | Route selection | UI responsiveness | < 2s dashboard updates |
3 | Single user | Schedule cycle | End-to-end flow | < 5s total process |
Light Load Testing (10 Users) | ||||
4 | 10 concurrent users | Simultaneous cycle creation | Average response time | < 1.5s average |
5 | 10 concurrent users | Route selection operations | UI update performance | < 3s dashboard refresh |
6 | 10 concurrent users | Dashboard viewing | Page load consistency | < 4s page loads |
7 | Monitor system resources | CPU, memory, database | Resource utilization | < 70% CPU usage |
Medium Load Testing (25 Users) | ||||
8 | 25 concurrent users | Mixed operations | Throughput metrics | 95% success rate |
9 | 25 concurrent users | Real-time updates | Update latency | < 3s update time |
10 | 25 concurrent users | Database operations | Query performance | < 1s query response |
11 | Monitor integration APIs | CX/MX/ONB response times | Integration performance | < 1.5s API calls |
Peak Load Testing (50 Users) | ||||
12 | 50 concurrent users | Full system operations | System stability | No system crashes |
13 | 50 concurrent users | Data consistency checks | Data integrity | No data corruption |
14 | 50 concurrent users | Error handling | Error rate monitoring | < 2% error rate |
15 | Monitor system limits | Resource ceiling | Performance degradation | Graceful slowdown |
Stress Testing (75 Users) | ||||
16 | 75 concurrent users | Beyond normal capacity | Breaking point analysis | System behavior |
17 | Monitor recovery | System recovery time | Recovery metrics | < 2 minutes recovery |
Performance Metrics Collection
Metric Category | Specific Metrics | Measurement Method | Target Values | Alert Thresholds |
---|---|---|---|---|
Response Times | API response, Page load, Database query | Automated monitoring | < 1s, < 3s, < 500ms | > 150% of target |
Throughput | Requests/second, Transactions/minute | Load testing tools | 100 req/sec minimum | < 50 req/sec |
Resource Usage | CPU, Memory, Disk I/O | System monitoring | < 80% utilization | > 90% utilization |
Error Rates | HTTP errors, Application errors | Error tracking | < 1% error rate | > 2% error rate |
User Experience | UI responsiveness, Data accuracy | Real user monitoring | Smooth interactions | UI freezing |
Load Test Scenarios
Scenario | User Distribution | Actions Per User | Test Pattern | Duration |
---|---|---|---|---|
Normal Operations | 80% create cycles, 15% view, 5% schedule | 10 actions/hour | Constant load | 1 hour |
Peak Hours | 60% create, 25% view, 15% schedule | 20 actions/hour | Ramp up pattern | 45 minutes |
Batch Processing | 50% bulk operations | 5 large operations | Spike pattern | 30 minutes |
TC_008: Error Handling and System Recovery [HIGH]
Test Case Metadata
Test Case ID: MX02US02_TC_008
Title: Comprehensive Error Handling and System Recovery Validation
Created By: QA Reliability Team
Created Date: January 28, 2025
Version: 1.0
Classification & Tagging
Module/Feature: Error Handling & System Resilience
Test Type: Functional Reliability
Test Level: System Testing
Priority: P2-High
Execution Phase: Regression Testing
Automation Status: Manual Testing Required
Tags: MOD-ErrorHandling, MOD-SystemResilience, P2-High, Phase-Regression,
Type-Functional-Reliability, Platform-Web, Report-QA, Report-Operations,
Customer-All, Risk-Medium, Business-High, Revenue-Impact-Medium,
Error-Recovery, Fault-Tolerance, System-Stability
Error Scenario Test Matrix
Error Category | Test Scenario | Trigger Method | Expected Behavior | Recovery Validation |
---|---|---|---|---|
Network Errors | ||||
NET-001 | Connection timeout during cycle creation | Network simulation | Timeout message, data preserved | Retry successful |
NET-002 | Intermittent connectivity | Connection drops | Graceful degradation | Auto-reconnection |
NET-003 | Complete network failure | Disconnect simulation | Offline mode message | Manual retry |
Database Errors | ||||
DB-001 | Database connection failure | DB service stop | Connection error message | Service restart recovery |
DB-002 | Query timeout | Long-running query | Timeout handling | Query optimization |
DB-003 | Constraint violation | Duplicate data attempt | Validation error | Clear error message |
Integration Errors | ||||
INT-001 | CX system unavailable | Service mock down | Service unavailable message | Fallback data |
INT-002 | MX system timeout | API delay simulation | Timeout handling | Cached data usage |
INT-003 | ONB system partial failure | Limited service | Partial functionality | Degraded mode |
Business Logic Errors | ||||
BL-001 | Route conflict detection | Overlapping assignments | Conflict error message | Alternative suggestions |
BL-002 | Invalid date ranges | Past date selection | Date validation error | Date correction |
BL-003 | Capacity limits exceeded | Maximum routes selected | Limit warning | Capacity guidance |
Detailed Error Testing Procedure
Step | Error Simulation | System Response | User Experience | Recovery Steps |
---|---|---|---|---|
Network Error Handling | ||||
1 | Disconnect network during form submission | "Connection lost" message shown | Form data preserved | Reconnect and retry |
2 | Slow network simulation | Loading indicators shown | Progress feedback | Patience or cancel |
3 | Intermittent connection | Auto-retry mechanism | Seamless recovery | Background retry |
Database Error Scenarios | ||||
4 | Database unavailable | "Service temporarily unavailable" | Clear error message | Service restoration |
5 | Transaction rollback | Data consistency maintained | No partial updates | Clean rollback |
6 | Deadlock detection | Automatic retry | User notified if needed | Transaction retry |
Integration Failures | ||||
7 | CX service timeout | "Consumer data unavailable" | Functionality continues | Manual refresh |
8 | MX service error | "Meter data may be outdated" | Warning displayed | Cached data used |
9 | ONB service failure | "Limited area selection" | Reduced options | Basic functionality |
User Input Errors | ||||
10 | Invalid form data | Field-level validation errors | Inline error messages | Input correction |
11 | Required fields missing | Form submission blocked | Required field highlighting | Complete form |
12 | Business rule violations | Rule-specific error messages | Clear violation explanation | Rule compliance |
Error Message Validation
Error Type | Message Requirements | Message Example | User Action Guidance |
---|---|---|---|
Validation Errors | Clear, specific, actionable | "Cycle name already exists. Please choose a different name." | Specific correction |
System Errors | Non-technical, reassuring | "We're experiencing technical difficulties. Please try again." | Retry instruction |
Integration Errors | Service-specific, informative | "Meter data service is unavailable. Using cached data." | Impact explanation |
Network Errors | Connection-focused | "Connection lost. Your changes have been saved. Click retry to continue." | Recovery guidance |
System Recovery Testing
Recovery Scenario | Failure Duration | Recovery Method | Expected Behavior | Validation Points |
---|---|---|---|---|
Short Outage | < 30 seconds | Automatic retry | Seamless recovery | No data loss |
Medium Outage | 1-5 minutes | Manual retry | User-initiated recovery | State preservation |
Extended Outage | > 5 minutes | Service restart | Full system recovery | Complete functionality |
TC_009: Mobile Integration End-to-End Validation [CRITICAL]
Test Case Metadata
Test Case ID: MX02US02_TC_009
Title: Complete Mobile App Integration for Field Reader Operations
Created By: Mobile Integration Team
Created Date: January 28, 2025
Version: 1.0
Classification & Tagging
Module/Feature: Mobile Integration & Field Operations
Test Type: Integration End-to-End
Test Level: Cross-Platform Integration
Priority: P1-Critical
Execution Phase: Integration Testing
Automation Status: Manual Testing (Cross-Platform)
Tags: MOD-MobileIntegration, MOD-FieldOperations, P1-Critical, Phase-Integration,
Type-E2E-Cross-Platform, Platform-Web-Mobile, Report-Product, Report-Engineering,
Customer-All, Risk-High, Business-Critical, Revenue-Impact-High,
Mobile-Sync, Field-Operations, Real-Time-Data
Mobile Integration Test Flow
Step | Web Platform Action | Mobile App Response | Sync Validation | Timing Requirement |
---|---|---|---|---|
Cycle Creation to Mobile Sync | ||||
1 | Create read cycle in web | N/A | Baseline established | N/A |
2 | Schedule cycle for immediate execution | Cycle appears in mobile app | Data synchronization | < 2 minutes |
3 | Verify cycle details in mobile | All route and meter data accurate | Data consistency | Complete details |
4 | Check route assignments | Field readers see assigned routes | Assignment accuracy | Correct assignments |
Field Data Collection | ||||
5 | Mobile: Start route execution | Web shows route status "In Progress" | Status synchronization | Real-time update |
6 | Mobile: Submit meter reading | Web displays reading in real-time | Bidirectional sync | < 30 seconds |
7 | Mobile: Report access issue | Web shows issue in audit trail | Issue tracking | Immediate logging |
8 | Mobile: Add photo evidence | Web displays photo attachment | Media synchronization | < 1 minute |
Route Completion Flow | ||||
9 | Mobile: Complete entire route | Web updates route status to "Completed" | Completion tracking | Real-time status |
10 | Mobile: Submit route summary | Web shows completion metrics | Summary synchronization | Complete data |
11 | Verify completion audit trail | All mobile actions logged in web | Activity tracking | Complete history |
Offline Scenarios | ||||
12 | Mobile: Work offline | Readings queued locally | Offline capability | Local storage |
13 | Mobile: Reconnect to network | Queued data syncs to web | Offline sync | Automatic sync |
14 | Verify data integrity | No data loss during offline period | Data consistency | Complete accuracy |
Mobile Functionality Validation
Mobile Feature | Test Scenario | Expected Behavior | Web Integration | Performance Target |
---|---|---|---|---|
Cycle Synchronization | Scheduled cycle availability | Cycles appear in mobile list | Web scheduling reflected | < 2 minutes sync |
Route Navigation | GPS-enabled route following | Turn-by-turn directions | Route data accurate | Real-time navigation |
Meter Reading | Barcode scanning, manual entry | Multiple input methods | Immediate web sync | < 30 seconds |
Photo Capture | Image attachment to readings | High-quality photos | Web display capability | < 1 minute upload |
Issue Reporting | Access problems, meter faults | Structured issue logging | Web notification system | Immediate alert |
Data Validation | Reading range checks | Real-time validation | Web rule consistency | Instant feedback |
Cross-Platform Data Consistency
Data Element | Web Source | Mobile Display | Sync Direction | Validation Method |
---|---|---|---|---|
Cycle Information | Web creation | Mobile display | Web → Mobile | Field comparison |
Route Details | Web assignment | Mobile execution | Web → Mobile | Route accuracy |
Meter Readings | Mobile collection | Web reporting | Mobile → Web | Reading validation |
Issue Reports | Mobile submission | Web management | Mobile → Web | Issue tracking |
Completion Status | Mobile update | Web dashboard | Mobile → Web | Status accuracy |
Mobile Performance Testing
Performance Metric | Target Value | Test Method | Load Scenario | Acceptance Criteria |
---|---|---|---|---|
Sync Time | < 2 minutes | Timestamp comparison | 10 concurrent cycles | 95% within target |
Reading Upload | < 30 seconds | Upload timing | 50 readings/batch | Average < 30s |
Offline Capacity | 100 readings | Local storage test | Full day offline | No data loss |
Battery Impact | < 20% per hour | Battery monitoring | 8-hour shift | Acceptable drain |
TC_010: Data Export and Reporting Functionality [MEDIUM]
Test Case Metadata
Test Case ID: MX02US02_TC_010
Title: Comprehensive Data Export and Reporting Feature Validation
Created By: QA Reporting Team
Created Date: January 28, 2025
Version: 1.0
Classification & Tagging
Module/Feature: Data Export & Reporting
Test Type: Functional System
Test Level: System Testing
Priority: P3-Medium
Execution Phase: Acceptance Testing
Automation Status: Manual Testing Preferred
Tags: MOD-DataExport, MOD-Reporting, P3-Medium, Phase-Acceptance,
Type-Functional-System, Platform-Web, Report-Product, Report-Business,
Customer-Enterprise, Risk-Low, Business-Medium, Revenue-Impact-Low,
Data-Export, Business-Intelligence, Report-Generation
Export Functionality Test Matrix
Export Type | Data Source | File Format | Test Scenario | Validation Points |
---|---|---|---|---|
Meter Lists | Cycle meter inventory | CSV, Excel | Complete cycle data | All meters included |
Audit Trails | Activity logs | CSV, PDF | Historical activity | Chronological order |
Performance Reports | Cycle metrics | PDF, Excel | Completion statistics | Accurate calculations |
Route Details | Route assignments | Excel | Route breakdowns | Complete route data |
Custom Reports | Filtered data | Multiple formats | User-defined exports | Filter accuracy |
Detailed Export Testing Procedure
Step | Export Action | Expected File | Content Validation | Performance Check |
---|---|---|---|---|
Meter List Export | ||||
1 | Navigate to cycle Meters tab | N/A | Meter list displayed | < 3s load time |
2 | Click "Export" button | Export options menu | CSV/Excel options available | Immediate response |
3 | Select CSV format | File download initiated | CSV file downloaded | < 10s download |
4 | Open downloaded file | Spreadsheet application | All meters listed | Complete data |
5 | Verify data accuracy | Cross-reference with UI | Serial numbers, addresses match | 100% accuracy |
6 | Check column headers | Proper field names | Standard naming convention | Clear headers |
Audit Trail Export | ||||
7 | Navigate to Audit Trail tab | N/A | Audit entries displayed | < 3s load time |
8 | Apply date filter | Filtered results | Last 30 days entries | Filter applied |
9 | Export filtered data | PDF report generated | Filtered data only | Filter accuracy |
10 | Verify PDF formatting | Professional layout | Proper pagination | Report quality |
11 | Check export completeness | All visible entries included | No missing entries | Complete export |
Performance Report Export | ||||
12 | Generate cycle performance report | Report compilation | Completion metrics | Accurate statistics |
13 | Export to Excel format | Excel file download | Formatted spreadsheet | Professional layout |
14 | Verify calculations | Manual spot checks | Percentages accurate | Math validation |
15 | Check chart inclusion | Graphs embedded | Visual elements present | Complete report |
Large Dataset Testing
Dataset Size | Export Type | Performance Target | Memory Usage | Success Criteria |
---|---|---|---|---|
Small (< 100 records) | CSV export | < 5 seconds | Minimal | 100% success |
Medium (100-1000 records) | Excel export | < 30 seconds | Moderate | 99% success |
Large (1000+ records) | Chunked export | < 2 minutes | Controlled | 95% success |
Export Format Validation
File Format | Structure Check | Content Validation | Use Case | Quality Standard |
---|---|---|---|---|
CSV | Comma-separated, UTF-8 | Special character handling | Data analysis | RFC 4180 compliant |
Excel | Proper formatting, multiple sheets | Formula preservation | Business reporting | Professional layout |
Page layout, print-ready | Visual formatting | Official reports | Print quality |
API Test Cases (Critical Level ≥7)
API_001: Create Read Cycle Endpoint [CRITICAL - Level 9]
API Test Case Metadata
API Test Case ID: MX02US02_API_001
Endpoint: POST /api/v1/read-cycles
Title: Create Read Cycle via API with Comprehensive Validation
Priority: P1-Critical (Level 9)
Test Type: API Integration
Created Date: January 28, 2025
API Specification
HTTP Method: POST
Endpoint: /api/v1/read-cycles
Content-Type: application/json
Authentication: Bearer token required
Rate Limit: 100 requests/minute
Test Scenarios
Scenario | Request Payload | Expected Response | Status Code | Validation Points |
---|---|---|---|---|
Valid Creation | Complete payload | Success response | 201 Created | ID generated, audit logged |
Missing Required Fields | Incomplete payload | Validation errors | 400 Bad Request | Field-specific errors |
Duplicate Name | Existing cycle name | Conflict error | 409 Conflict | Uniqueness enforced |
Invalid Route IDs | Non-existent routes | Not found error | 404 Not Found | Route validation |
Exceeds Limits | Too many routes | Limit exceeded | 400 Bad Request | Business rule enforcement |
Detailed API Test Procedure
Step | API Request | Expected Response | Performance Check | Integration Validation |
---|---|---|---|---|
Valid Request Testing | ||||
1 | POST with complete valid payload | 201 Created with cycle ID | < 1 second response | Database record created |
2 | Verify response structure | JSON schema validation | Response well-formed | All required fields present |
3 | Check audit trail creation | Audit entry logged | Database query | Creation activity recorded |
4 | Verify integration triggers | CX/MX/ONB APIs called | Integration monitoring | External systems notified |
Validation Testing | ||||
5 | POST with missing name field | 400 Bad Request | < 500ms response | Error message specific |
6 | POST with duplicate name | 409 Conflict | < 500ms response | Uniqueness validation |
7 | POST with invalid duration | 400 Bad Request | < 500ms response | Range validation (1-90) |
8 | POST with non-existent routes | 404 Not Found | < 500ms response | Route existence check |
Performance Testing | ||||
9 | Concurrent API calls (10) | All succeed | < 1.5s average | No race conditions |
10 | Large payload (max routes) | Success or limit error | < 2s response | Scalability validation |
API Request Examples
Valid Request Payload:
{
"name": "API Test Cycle 001",
"area": "Downtown District",
"subArea": "Commercial Zone A",
"utilityService": "Water",
"cycleDuration": 30,
"routes": ["route-123", "route-456", "route-789"],
"createdBy": "supervisor.test@utility.com"
}
Expected Success Response:
{
"id": "cycle-uuid-12345",
"name": "API Test Cycle 001",
"status": "Created",
"totalRoutes": 3,
"totalMeters": 85,
"totalConsumers": 67,
"createdAt": "2025-01-28T14:30:00Z",
"createdBy": "supervisor.test@utility.com",
"readingPeriod": {
"startDate": "2025-04-01",
"endDate": "2025-04-30"
}
}
API Validation Points
✅ Response time < 1 second for valid requests
✅ Database transaction completed successfully
✅ Audit trail entry created with correct details
✅ Integration with CX/MX/ONB systems triggered
✅ Error responses include helpful messages
✅ Rate limiting enforced correctly
✅ Authentication required and validated
API_002: Real-time Meter Dashboard Endpoint [CRITICAL - Level 8]
API Test Case Metadata
API Test Case ID: MX02US02_API_002
Endpoint: GET /api/v1/read-cycles/{id}/meter-dashboard
Title: Real-time Meter Dashboard Data Retrieval
Priority: P1-Critical (Level 8)
Test Type: API Performance Integration
Created Date: January 28, 2025
API Specification
HTTP Method: GET
Endpoint: /api/v1/read-cycles/{id}/meter-dashboard
Response Type: application/json
Cache Headers: no-cache (real-time data)
Authentication: Bearer token required
Performance SLA: < 500ms response time
Real-time Data Test Scenarios
Test Scenario | Route Selection | Expected Data | Performance Target | Cache Validation |
---|---|---|---|---|
Empty Cycle | No routes selected | Zero meters, empty breakdown | < 300ms | No caching |
Single Route | One route selected | Route-specific metrics | < 400ms | Real-time calc |
Multiple Routes | 3-5 routes selected | Aggregated metrics | < 500ms | Dynamic updates |
Maximum Load | All available routes | Complete system data | < 800ms | Performance limit |
API Response Validation
Expected Response Structure:
{
"cycleId": "cycle-uuid-12345",
"systemWideMeters": {
"total": 850,
"assigned": 795,
"unassigned": 55
},
"metersInThisCycle": {
"total": 85,
"active": 82,
"inactive": 3
},
"meterConditions": {
"normal": 70,
"faulty": 10,
"rcnt": 3,
"others": 2
},
"meterCategories": {
"residential": 45,
"commercial": 25,
"industrial": 10,
"government": 3,
"agricultural": 2
},
"consumers": {
"total": 67,
"active": 64,
"inactive": 2,
"disconnected": 1,
"paused": 0
},
"lastUpdated": "2025-01-28T14:35:22Z"
}
Performance Test Matrix
Load Scenario | Concurrent Requests | Expected Response Time | Success Rate | Error Handling |
---|---|---|---|---|
Normal Load | 5 concurrent | < 400ms average | 100% | No errors |
Peak Load | 15 concurrent | < 600ms average | 98% | Graceful degradation |
Stress Load | 25 concurrent | < 1s average | 95% | Rate limiting |
Test Suite Organization & Execution Strategy
Test Suite Categories
Smoke Test Suite (Daily Execution - Critical Path)
Execution Frequency: Daily (after deployments)
Total Execution Time: ~25 minutes
Automation Level: 85% automated
Success Criteria: 100% pass rate required
Included Test Cases:
✅ TC_001: Create Basic Read Cycle (8 min)
✅ TC_004: Read Cycle Scheduling (6 min)
✅ TC_006: System Integration Validation (8 min)
✅ API_001: Create Read Cycle API (3 min)
Purpose: Verify core system functionality after each deployment
Trigger: Automated via CI/CD pipeline
Notification: Slack alerts for failures
Regression Test Suite (Pre-Release Validation)
Execution Frequency: Before each release
Total Execution Time: ~3 hours
Automation Level: 70% automated
Success Criteria: 95% pass rate required
Included Test Cases:
✅ TC_001: Create Basic Read Cycle
✅ TC_002: Route Selection Real-time Updates
✅ TC_003: Business Rule Validation
✅ TC_004: Read Cycle Scheduling
✅ TC_005: Audit Trail Functionality
✅ TC_006: System Integration
✅ TC_007: Performance Testing
✅ TC_008: Error Handling
✅ API_001: Create Read Cycle API
✅ API_002: Meter Dashboard API
Purpose: Comprehensive feature validation before production release
Trigger: Manual execution by QA team
Environment: Staging environment
Full Test Suite (Comprehensive Validation)
Execution Frequency: Weekly + Major releases
Total Execution Time: ~5 hours
Automation Level: 60% automated
Success Criteria: 90% pass rate required
Included Test Cases: All TC_001 through TC_010 + API tests
Additional Coverage:
- Cross-browser testing (Chrome, Firefox, Safari, Edge)
- Mobile integration end-to-end
- Performance benchmarking
- Security validation
- Data export functionality
Purpose: Complete system validation and quality assurance
Environment: Production-like staging
Performance Test Suite (Load & Scalability)
Execution Frequency: Weekly + Performance concerns
Total Execution Time: ~2 hours
Automation Level: 95% automated
Success Criteria: All SLAs met
Focus Areas:
- 50 concurrent users load testing
- API response time validation (< 1s)
- Page load performance (< 3s)
- Real-time update latency (< 2s)
- Database query optimization
- Integration service performance
Tools: JMeter, New Relic, Custom monitoring
Environment: Performance testing environment
Integration & Dependency Management
System Dependency Matrix
Integration Point | Dependency Level | Health Check | Failure Impact | Recovery Strategy |
---|---|---|---|---|
CX System | Critical | /health endpoint | High - Consumer operations blocked | Cached data + manual retry |
MX System | Critical | /status endpoint | High - Meter data inaccurate | Historical data + refresh |
ONB System | Medium | /ping endpoint | Medium - Limited area selection | Default options + notification |
Mobile App | Critical | Push notification test | High - Field operations stopped | Manual coordination + sync |
Database | Critical | Connection pool monitoring | Critical - Complete failure | Immediate escalation |
Pre-Test Environment Validation
# Environment Health Check Script
#!/bin/bash
echo "=== Read Cycle Management Test Environment Validation ==="
# Database connectivity
echo "✓ Checking database connection..."
# Connection test logic
# External service health
echo "✓ Validating CX service health..."
curl -f http://cx-service/health || echo "❌ CX service unavailable"
echo "✓ Validating MX service health..."
curl -f http://mx-service/health || echo "❌ MX service unavailable"
echo "✓ Validating ONB service health..."
curl -f http://onb-service/health || echo "❌ ONB service unavailable"
# Test data preparation
echo "✓ Preparing test data..."
# Data setup scripts
echo "✓ Environment ready for testing"
Test Data Management Strategy
Master Test Data Setup
-- Test Areas and Sub-areas
INSERT INTO areas (id, name, active) VALUES
('area-001', 'Downtown District', true),
('area-002', 'North Residential', true),
('area-003', 'Industrial Zone', true);
INSERT INTO sub_areas (id, area_id, name, active) VALUES
('sub-001', 'area-001', 'Commercial Zone A', true),
('sub-002', 'area-001', 'Commercial Zone B', true),
('sub-003', 'area-002', 'Residential Block 1', true);
-- Test Routes with Meters
INSERT INTO routes (id, name, area_id, sub_area_id, read_type, meter_count) VALUES
('route-001', 'Downtown Route A', 'area-001', 'sub-001', 'Manual', 32),
('route-002', 'Downtown Route B', 'area-001', 'sub-001', 'Manual', 24),
('route-003', 'Downtown Route C', 'area-001', 'sub-001', 'Manual', 29);
-- Test Meters with Various Conditions
INSERT INTO meters (id, serial_number, route_id, condition, category, status) VALUES
('meter-001', 'M123456', 'route-001', 'Normal', 'Commercial', 'Active'),
('meter-002', 'M123457', 'route-001', 'Faulty', 'Commercial', 'Active'),
('meter-003', 'M123458', 'route-001', 'RCNT', 'Residential', 'Inactive');
Test Data Cleanup Strategy
-- Cleanup script for test isolation
DELETE FROM read_cycles WHERE name LIKE 'Test Cycle%' OR name LIKE 'API Test%';
DELETE FROM audit_trail WHERE action LIKE '%Test%';
-- Additional cleanup as needed
Performance Benchmarks & SLA Definitions
Response Time Requirements
Operation Type | Target Response Time | Maximum Acceptable | Measurement Method |
---|---|---|---|
Page Loads | < 3 seconds | < 5 seconds | Browser timing API |
API Calls | < 1 second | < 2 seconds | Server response time |
Real-time Updates | < 2 seconds | < 3 seconds | UI update timing |
Database Queries | < 500ms | < 1 second | Query execution time |
File Exports | < 10 seconds | < 30 seconds | Download completion |
Mobile Sync | < 2 minutes | < 5 minutes | Cross-platform timing |
Throughput Requirements
System Component | Target Throughput | Peak Capacity | Monitoring Alert |
---|---|---|---|
Concurrent Users | 50 users | 75 users | > 60 users |
API Requests | 100 req/sec | 150 req/sec | > 120 req/sec |
Database Connections | 20 connections | 50 connections | > 40 connections |
File Processing | 1000 records/min | 2000 records/min | < 500 records/min |
System Resource Limits
Resource Type | Normal Usage | Maximum Acceptable | Alert Threshold |
---|---|---|---|
CPU Usage | < 60% | < 85% | > 75% |
Memory Usage | < 70% | < 90% | > 80% |
Disk I/O | < 50% | < 80% | > 70% |
Network Bandwidth | < 40% | < 70% | > 60% |
Risk Assessment & Mitigation Strategies
High-Risk Test Areas
1. Real-time Data Synchronization (Risk Level: High)
Risk Factors:
- Complex mathematical calculations across multiple routes
- UI updates dependent on backend processing
- Integration with multiple external systems
Mitigation Strategies:
- Extensive automated regression testing
- Performance monitoring with alerts
- Fallback to cached data when services unavailable
- Progressive loading for large datasets
Test Coverage:
- TC_002: Real-time dashboard updates
- TC_006: Integration testing
- API_002: Dashboard API performance
2. Mobile-Web Integration (Risk Level: High)
Risk Factors:
- Cross-platform data consistency requirements
- Network connectivity variations in field
- Offline capability requirements
Mitigation Strategies:
- Comprehensive end-to-end testing
- Offline scenario validation
- Data conflict resolution mechanisms
- Robust sync failure handling
Test Coverage:
- TC_009: Mobile integration end-to-end
- TC_008: Error handling and recovery
- Performance testing with mobile scenarios
3. System Integration Dependencies (Risk Level: Medium-High)
Risk Factors:
- Dependency on CX, MX, ONB external services
- Network latency and timeout scenarios
- Data consistency across systems
Mitigation Strategies:
- Health check validation before test execution
- Graceful degradation testing
- Circuit breaker pattern implementation
- Comprehensive error handling validation
Test Coverage:
- TC_006: System integration validation
- TC_008: Error handling scenarios
- API performance testing
Risk Mitigation Test Schedule
Risk Category | Validation Frequency | Test Types | Success Criteria |
---|---|---|---|
Critical Path | Daily | Smoke tests | 100% pass rate |
Integration Points | Bi-weekly | Integration tests | 95% pass rate |
Performance | Weekly | Load tests | All SLAs met |
Data Consistency | Per release | Full regression | 90% pass rate |
Test Execution Analytics & Reporting
BrowserStack Test Management Reports Support
Report Category 1-5: Engineering Focus
1. Module Coverage Report
- Test cases per module/feature
- Code coverage mapping
- Defect density by module
2. Performance Benchmark Report
- Response time trends
- Throughput measurements
- Resource utilization metrics
3. Integration Health Report
- External dependency status
- API performance metrics
- Service reliability scores
4. Automation ROI Report
- Automated vs manual test ratio
- Execution time savings
- Maintenance effort tracking
5. Quality Metrics Dashboard
- Pass/fail rates by priority
- Defect detection effectiveness
- Test stability indicators
Report Category 6-10: Product & Business Focus
6. Feature Readiness Report
- Acceptance criteria coverage
- User story completion status
- Release readiness assessment
7. Customer Impact Analysis
- Critical path test results
- Revenue-impacting feature status
- Customer segment risk assessment
8. Business Priority Alignment
- Must-have vs nice-to-have coverage
- Business rule validation status
- Compliance requirement tracking
9. Release Quality Summary
- Overall system health score
- Critical defect summary
- Go/no-go recommendation
10. Trend Analysis Report
- Quality improvement trends
- Performance degradation tracking
- Regression test effectiveness
Report Category 11-17: Operations & Management Focus
11. Test Execution Efficiency
- Test case execution times
- Resource utilization optimization
- Test environment utilization
12. Defect Lifecycle Tracking
- Bug discovery rates
- Resolution time tracking
- Defect prevention metrics
13. Risk Assessment Dashboard
- High-risk area identification
- Mitigation strategy effectiveness
- Risk trend analysis
14. Stakeholder Communication
- Executive summary reports
- Customer success metrics
- Support team readiness
15. Compliance & Audit Trail
- Test evidence documentation
- Regulatory requirement coverage
- Audit trail completeness
16. Cross-Team Collaboration
- Engineering-QA handoff metrics
- Product-QA alignment tracking
- Support escalation patterns
17. Strategic Planning Support
- Test strategy effectiveness
- Resource planning insights
- Technology debt identification
Test Metrics Collection Framework
// Test Metrics Collection Example
const testMetrics = {
executionMetrics: {
totalTests: 12,
passedTests: 11,
failedTests: 1,
executionTime: '3.5 hours',
averageTestTime: '17.5 minutes'
},
performanceMetrics: {
apiResponseTime: '0.8 seconds',
pageLoadTime: '2.4 seconds',
realTimeUpdates: '1.6 seconds'
},
businessMetrics: {
criticalPathCoverage: '100%',
revenueImpactingFeatures: '95% tested',
customerSegmentCoverage: 'All segments'
},
qualityMetrics: {
defectDetectionRate: '94%',
falsePositiveRate: '2%',
testStabilityScore: '97%'
}
};
Execution Schedule & Resource Planning
Weekly Test Execution Calendar
Day | Test Suite | Duration | Resources | Environment |
---|---|---|---|---|
Monday | Smoke Tests | 30 min | Automated | Staging |
Tuesday | Regression Suite | 3 hours | QA Team + Automation | Staging |
Wednesday | Performance Tests | 2 hours | Performance Engineer | Perf Environment |
Thursday | Integration Tests | 2.5 hours | QA + DevOps | Integration Environment |
Friday | Full Test Suite | 5 hours | Full QA Team | Pre-Production |
Resource Allocation Matrix
Test Type | Manual Effort | Automation Effort | Tools Required | Skill Level |
---|---|---|---|---|
Functional Tests | 40% | 60% | Selenium, TestNG | Mid-level QA |
API Tests | 20% | 80% | Postman, Newman | Senior QA |
Performance Tests | 10% | 90% | JMeter, New Relic | Performance Engineer |
Integration Tests | 50% | 50% | Custom tools | Senior QA + DevOps |
Mobile Tests | 70% | 30% | Appium, Device lab | Mobile QA Specialist |
Success Criteria & Exit Conditions
Release Go/No-Go Criteria
✅ Smoke Test Suite: 100% pass rate
✅ Critical Test Cases (P1): 100% pass rate
✅ High Priority Test Cases (P2): 95% pass rate
✅ Performance SLAs: All targets met
✅ Integration Tests: 95% pass rate
✅ No critical or high-severity open defects
✅ Mobile integration: Core flows working
✅ Security validation: No high-risk issues
Test Completion Criteria
✅ All planned test cases executed
✅ Defect backlog reviewed and prioritized
✅ Performance benchmarks documented
✅ Risk assessment completed
✅ Stakeholder sign-off obtained
✅ Test evidence archived
✅ Lessons learned documented
Conclusion
This comprehensive test suite for Read Cycle Management (MX02US02) provides complete coverage of functional, integration, performance, and mobile testing requirements. The test cases are designed to support all 17 BrowserStack test management reports while ensuring high-quality delivery for small and medium utility companies.
Key Deliverables Summary:
- 12 Detailed Test Cases with comprehensive validation points
- 4 Test Suite Configurations for different execution scenarios
- Performance Benchmarks with specific SLA targets
- Integration Testing Strategy for CX/MX/ONB systems
- Mobile Integration Validation for field operations
- Risk Assessment Matrix with mitigation strategies
- Complete Test Data Management approach
- Execution Analytics Framework for continuous improvement
The test suite ensures robust validation of the Read Cycle Management system while maintaining focus on business value, customer impact, and operational efficiency for utility companies.