Calendar & Scheduling Management - Test Cases (ONB02US04)
Test Scenario Analysis
A. Functional Test Scenarios
Core Functionality:
- Holiday Calendar Management
- Working Days Schedule Configuration
- Holiday Import and Manual Addition
- Working Hours Time Configuration
- Calendar Visualization and Navigation
Business Rules Coverage:
- Holiday type validation (Federal, Company, Observed)
- Date selection and holiday creation
- Working hours time validation (00:00 - 23:59)
- Duplicate holiday prevention
- Save/Cancel operations
- User role-based access control
User Journeys:
- Utility Administrator holiday management workflow
- System Admin working hours configuration workflow
- Calendar navigation and holiday viewing
- Quick time preset utilization
B. Non-Functional Test Scenarios
Performance:
- Page load times < 3 seconds
- Calendar rendering performance
- Save operation response times < 500ms
Security:
- Role-based access validation
- Session management
- Data protection for utility configurations
Compatibility:
- Chrome Latest browser support
- Desktop resolutions (1920x1080+)
- System-wide timezone handling
Usability:
- Intuitive calendar navigation
- Clear holiday type distinctions
- Working hours slider functionality
Reliability:
- Network interruption handling
- Data persistence validation
- System stability during concurrent usage
C. Edge Case & Error Scenarios
Boundary Conditions:
- Maximum/minimum working hours (00:00 - 23:59)
- Calendar date range limits
- Holiday name character limits
Invalid Inputs:
- Malformed holiday names
- Invalid time formats
- Unauthorized access attempts
System Failures:
- Network interruptions during save
- Session timeout scenarios
- Browser refresh during operations
Test Case Details
Test Case 1: Holiday Calendar Access and Navigation
Test Case ID: ONB02US04_TC_001
Title: Verify Holiday Calendar page access and basic navigation
Created By: Auto-generated
Created Date: 2025-05-28
Version: 1.0
Classification
Module/Feature: Holiday Calendar
Test Type: Functional/UI
Test Level: System
Priority: P1-Critical
Execution Phase: Smoke
Automation Status: Manual
Enhanced Tags for 17 Reports Support
Business Context
Customer_Segment: Enterprise
Revenue_Impact: Medium
Business_Priority: Must-Have
Customer_Journey: Daily-Usage
Compliance_Required: No
SLA_Related: Yes
Quality Metrics
Risk_Level: Low
Complexity_Level: Low
Expected_Execution_Time: 3 minutes
Reproducibility_Score: High
Data_Sensitivity: Low
Failure_Impact: High
Coverage Tracking
Feature_Coverage: 20%
Integration_Points: Calendar UI, Navigation
Code_Module_Mapped: CalendarModule, NavigationModule
Requirement_Coverage: Complete
Cross_Platform_Support: Web
Stakeholder Reporting
Primary_Stakeholder: Engineering
Report_Categories: Quality-Dashboard, Module-Coverage
Trend_Tracking: Yes
Executive_Visibility: No
Customer_Impact_Level: High
Requirements Traceability
Test Environment
Environment: Staging
Browser/Version: Chrome Latest
Device/OS: Windows 10/11
Screen_Resolution: Desktop-1920x1080
Dependencies: Smart360 application, User authentication
Performance_Baseline: < 3 seconds page load
Data_Requirements: Valid utility organization setup
Prerequisites
Setup_Requirements: User logged into Smart360 system
User_Roles_Permissions: Utility Administrator access
Test_Data: Metropolis Water District utility organization
Prior_Test_Cases: User authentication successful
Test Procedure
Verification Points
Primary_Verification: Holiday Calendar page loads and displays correctly
Secondary_Verifications: Navigation controls work, holiday legend visible
Negative_Verification: No error messages displayed, no broken UI elements
Test Case 2: Add New Holiday - Company Holiday Type
Test Case ID: ONB02US04_TC_002
Title: Verify adding a new Company Holiday through calendar interface
Created By: Auto-generated
Created Date: 2025-05-28
Version: 1.0
Classification
Module/Feature: Holiday Management
Test Type: Functional
Test Level: System
Priority: P1-Critical
Execution Phase: Regression
Automation Status: Planned-for-Automation
Enhanced Tags for 17 Reports Support
Business Context
Customer_Segment: Enterprise
Revenue_Impact: High
Business_Priority: Must-Have
Customer_Journey: Daily-Usage
Compliance_Required: No
SLA_Related: Yes
Quality Metrics
Risk_Level: Medium
Complexity_Level: Medium
Expected_Execution_Time: 5 minutes
Reproducibility_Score: High
Data_Sensitivity: Low
Failure_Impact: Critical
Test Procedure
Verification Points
Primary_Verification: Holiday successfully created and saved with Company type
Secondary_Verifications: Holiday appears in monthly list, calendar visual updated
Negative_Verification: No duplicate holidays created, no error messages
Test Case 3: Import Standard Holidays Functionality
Test Case ID: ONB02US04_TC_003
Title: Verify Import Standard Holidays feature functionality
Created By: Auto-generated
Created Date: 2025-05-28
Version: 1.0
Classification
Module/Feature: Holiday Import
Test Type: Functional
Test Level: System
Priority: P2-High
Execution Phase: Regression
Automation Status: Manual
Enhanced Tags for 17 Reports Support
Test Procedure
Test Case 4: Working Days Schedule Configuration - Monday Setup
Test Case ID: ONB02US04_TC_004
Title: Configure working hours for Monday using slider controls
Created By: Auto-generated
Created Date: 2025-05-28
Version: 1.0
Classification
Module/Feature: Working Days Schedule
Test Type: Functional
Test Level: System
Priority: P1-Critical
Execution Phase: Regression
Automation Status: Planned-for-Automation
Enhanced Tags for 17 Reports Support
Test Procedure
Test Case 5: Quick Time Presets Functionality
Test Case ID: ONB02US04_TC_005
Title: Verify Quick Time Presets application for working hours
Created By: Auto-generated
Created Date: 2025-05-28
Version: 1.0
Classification
Module/Feature: Quick Time Presets
Test Type: Functional
Test Level: System
Priority: P2-High
Execution Phase: Regression
Automation Status: Manual
Test Procedure
Test Case 6: Weekend Working Status Configuration
Test Case ID: ONB02US04_TC_006
Title: Configure Saturday as working day and Sunday as non-working
Created By: Auto-generated
Created Date: 2025-05-28
Version: 1.0
Classification
Module/Feature: Weekend Configuration
Test Type: Functional
Test Level: System
Priority: P2-High
Execution Phase: Regression
Automation Status: Manual
Test Procedure
Test Case 7: Holiday Type Validation and Display
Test Case ID: ONB02US04_TC_007
Title: Verify all three holiday types can be created and display correctly
Created By: Auto-generated
Created Date: 2025-05-28
Version: 1.0
Classification
Module/Feature: Holiday Type Management
Test Type: Functional
Test Level: System
Priority: P1-Critical
Execution Phase: Regression
Automation Status: Planned-for-Automation
Test Procedure
Test Case 8: Duplicate Holiday Prevention Validation
Test Case ID: ONB02US04_TC_008
Title: Verify system prevents duplicate holidays on same date
Created By: Auto-generated
Created Date: 2025-05-28
Version: 1.0
Classification
Module/Feature: Data Validation
Test Type: Functional/Negative
Test Level: System
Priority: P2-High
Execution Phase: Regression
Automation Status: Manual
Enhanced Tags for 17 Reports Support
Test Procedure
Test Case 9: Working Hours Time Boundary Validation
Test Case ID: ONB02US04_TC_009
Title: Validate working hours time input boundaries (00:00 - 23:59)
Created By: Auto-generated
Created Date: 2025-05-28
Version: 1.0
Classification
Module/Feature: Time Validation
Test Type: Functional/Boundary
Test Level: System
Priority: P2-High
Execution Phase: Regression
Automation Status: Manual
Test Procedure
Test Case 10: Cancel Changes Functionality
Test Case ID: ONB02US04_TC_010
Title: Verify Cancel button discards unsaved changes
Created By: Auto-generated
Created Date: 2025-05-28
Version: 1.0
Classification
Module/Feature: Change Management
Test Type: Functional
Test Level: System
Priority: P3-Medium
Execution Phase: Regression
Automation Status: Manual
Test Procedure
Test Case 11: Holiday Name Character Limit Validation
Test Case ID: ONB02US04_TC_011
Title: Validate holiday name input field character limitations
Created By: Auto-generated
Created Date: 2025-05-28
Version: 1.0
Classification
Module/Feature: Input Validation
Test Type: Functional/Boundary
Test Level: System
Priority: P3-Medium
Execution Phase: Regression
Automation Status: Manual
Test Procedure
Test Case 12: Role-Based Access Control - System Admin
Test Case ID: ONB02US04_TC_012
Title: Verify System Admin can configure working hours across utilities
Created By: Auto-generated
Created Date: 2025-05-28
Version: 1.0
Classification
Module/Feature: Access Control
Test Type: Security/Functional
Test Level: System
Priority: P1-Critical
Execution Phase: Regression
Automation Status: Manual
Enhanced Tags for 17 Reports Support
Business Context
Customer_Segment: Enterprise
Revenue_Impact: High
Business_Priority: Must-Have
Customer_Journey: Onboarding
Compliance_Required: Yes
SLA_Related: Yes
Test Procedure
Test Case 13: Network Interruption During Save Operation
Test Case ID: ONB02US04_TC_013
Title: Verify system behavior during network interruption while saving
Created By: Auto-generated
Created Date: 2025-05-28
Version: 1.0
Classification
Module/Feature: Network Resilience
Test Type: Reliability
Test Level: System
Priority: P2-High
Execution Phase: Regression
Automation Status: Manual
Enhanced Tags for 17 Reports Support
Test Procedure
Test Case 14: Session Timeout Behavior
Test Case ID: ONB02US04_TC_014
Title: Verify system behavior when session times out during configuration
Created By: Auto-generated
Created Date: 2025-05-28
Version: 1.0
Classification
Module/Feature: Session Management
Test Type: Security/Reliability
Test Level: System
Priority: P2-High
Execution Phase: Regression
Automation Status: Manual
Test Procedure
Test Case 15: Calendar Performance with Multiple Holidays
Test Case ID: ONB02US04_TC_015
Title: Verify calendar performance with multiple holidays displayed
Created By: Auto-generated
Created Date: 2025-05-28
Version: 1.0
Classification
Module/Feature: Calendar Performance
Test Type: Performance
Test Level: System
Priority: P3-Medium
Execution Phase: Performance
Automation Status: Planned-for-Automation
Enhanced Tags for 17 Reports Support
Test Procedure
Test Suite Organization
Smoke Test Suite
Criteria: P1 priority, basic functionality validation
Test Cases: ONB02US04_TC_001, ONB02US04_TC_002, ONB02US04_TC_004
Execution: Every build deployment
Duration: ~15 minutes
Regression Test Suite
Criteria: P1-P2 priority, automated tests
Test Cases: TC_001 through TC_012
Execution: Before each release
Duration: ~60 minutes
Full Test Suite
Criteria: All test cases including edge cases
Test Cases: TC_001 through TC_015
Execution: Weekly or major release cycles
Duration: ~90 minutes
API Test Cases (Critical Level ≥7)
API Test Case 1: Holiday Creation Endpoint
Test Case ID: ONB02US04_API_001
Title: Validate holiday creation via API endpoint
Priority: P1-Critical
Importance Level: 9
Test Procedure: The holiday creation endpoint should accept POST requests to create new holidays for a specific utility organization. The API should validate required fields including date, holiday name, and type. The endpoint should return appropriate HTTP status codes and response data confirming successful creation.
Request Validation Points:
- Verify POST method acceptance to the utility-specific holiday endpoint
- Validate required fields: date (ISO format), name (string), type (enum: federal/company/observed)
- Test optional fields such as timezone specification
- Confirm proper Content-Type header handling (application/json)
- Validate utility ID parameter in URL path
Response Validation Points:
- Verify 201 Created status for successful holiday creation
- Confirm response includes generated holiday ID and creation timestamp
- Validate response data matches submitted request data
- Test error responses for missing required fields (400 Bad Request)
- Verify unauthorized access returns 403 Forbidden
- Test duplicate holiday prevention with appropriate error response
Security Testing:
- Validate authentication token requirement
- Test authorization for utility-specific access
- Verify input sanitization for holiday name field
- Test SQL injection prevention in all input fields
API Test Case 2: Working Hours Configuration Endpoint
Test Case ID: ONB02US04_API_002
Title: Validate working hours update via API
Priority: P1-Critical
Importance Level: 8
Test Procedure: The working hours configuration endpoint should accept PUT requests to update the complete weekly schedule for a utility organization. The API should validate time formats, working day configurations, and maintain data consistency across all days of the week.
Request Validation Points:
- Verify PUT method acceptance for working hours update
- Validate time format requirements (24-hour format: HH:MM)
- Test working day boolean flag for each day of the week
- Confirm null value handling for non-working days
- Validate all seven days of the week are included in request
- Test timezone considerations for time values
Response Validation Points:
- Verify 200 OK status for successful updates
- Confirm response includes updated working hours configuration
- Validate timestamp of last modification
- Test error responses for invalid time formats (400 Bad Request)
- Verify partial update rejection (all days must be specified)
- Test authorization failures return appropriate error codes
Business Logic Validation:
- Verify start time cannot be later than end time for same day
- Test boundary time values (00:00 to 23:59)
- Validate working day consistency (start/end times required when working=true)
- Test non-working day validation (start/end should be null when working=false)
API Test Case 3: Holiday Retrieval Endpoint
Test Case ID: ONB02US04_API_003
Title: Validate holiday data retrieval with filtering options
Priority: P1-Critical
Importance Level: 8
Test Procedure: The holiday retrieval endpoint should support GET requests with various query parameters for filtering holidays by date range, type, and pagination. The API should return properly formatted holiday data with consistent structure and proper HTTP caching headers.
Request Validation Points:
- Verify GET method support for holiday data retrieval
- Test date range filtering with start_date and end_date parameters
- Validate holiday type filtering (federal, company, observed)
- Test pagination parameters (page, limit)
- Verify utility ID scope restriction
- Test invalid parameter handling
Response Validation Points:
- Verify 200 OK status for successful retrieval
- Confirm response includes array of holiday objects
- Validate consistent data structure for each holiday
- Test pagination metadata (total count, page info)
- Verify proper HTTP caching headers
- Test empty result handling (no holidays found)
API Test Case 4: Holiday Deletion Endpoint
Test Case ID: ONB02US04_API_004
Title: Validate holiday deletion via API endpoint
Priority: P2-High
Importance Level: 7
Test Procedure: The holiday deletion endpoint should accept DELETE requests to remove specific holidays. The API should validate holiday ownership, prevent unauthorized deletions, and maintain audit trail information for compliance purposes.
Request Validation Points:
- Verify DELETE method acceptance for specific holiday ID
- Test holiday ID validation and existence checking
- Validate utility ownership of holiday before deletion
- Test authentication and authorization requirements
- Verify cascade deletion handling if applicable
Response Validation Points:
- Verify 204 No Content status for successful deletion
- Test 404 Not Found for non-existent holiday IDs
- Confirm 403 Forbidden for unauthorized deletion attempts
- Validate audit trail creation for deletion event
- Test idempotent deletion (multiple DELETE requests)
API Test Case 5: Working Hours Retrieval Endpoint
Test Case ID: ONB02US04_API_005
Title: Validate working hours configuration retrieval
Priority: P2-High
Importance Level: 7
Test Procedure: The working hours retrieval endpoint should return the complete weekly schedule configuration for a utility organization. The API should provide consistent data structure and handle timezone information appropriately.
Request Validation Points:
- Verify GET method support for working hours retrieval
- Test utility ID parameter validation
- Validate authentication and authorization requirements
- Test timezone parameter handling if supported
- Verify proper URL structure and parameter encoding
Response Validation Points:
- Verify 200 OK status for successful retrieval
- Confirm response includes all seven days of the week
- Validate consistent time format across all days
- Test working day boolean flag accuracy
- Verify timezone information inclusion
- Test default configuration handling for new utilities
API Test Case 6: Bulk Holiday Import Endpoint
Test Case ID: ONB02US04_API_006
Title: Validate bulk holiday import functionality
Priority: P2-High
Importance Level: 7
Test Procedure: The bulk holiday import endpoint should accept POST requests with multiple holiday records for efficient batch processing. The API should validate all records, handle partial failures gracefully, and provide detailed response information about import results.
Request Validation Points:
- Verify POST method acceptance for bulk holiday data
- Test array of holiday objects in request body
- Validate individual holiday record format within bulk request
- Test request size limitations and handling
- Verify duplicate detection across bulk import records
- Test partial data validation (some valid, some invalid records)
Response Validation Points:
- Verify 200 OK status for successful bulk import
- Confirm response includes success count and failure details
- Test detailed error reporting for failed records
- Validate successful import confirmation with created holiday IDs
- Test rollback behavior for critical failures
- Verify audit trail creation for bulk operations
API Error Handling Standards
Authentication Errors:
Validation Errors:
- 400 Bad Request: Malformed request data or missing required fields
- 422 Unprocessable Entity: Valid format but business rule violations
- Detailed error messages with field-specific validation feedback
System Errors:
- 500 Internal Server Error: Unexpected system failures
- 503 Service Unavailable: Temporary system maintenance or overload
- Proper error logging and monitoring integration
Rate Limiting:
- 429 Too Many Requests: API rate limit exceeded
- Proper rate limiting headers in responses
- Progressive backoff recommendations in error responses
API Performance Standards
Response Time Requirements:
- Holiday creation/update operations: < 500ms
- Holiday retrieval operations: < 300ms
- Working hours operations: < 400ms
- Bulk operations: < 2 seconds for up to 100 records
Throughput Requirements:
- Support minimum 100 concurrent API requests
- Handle peak loads during business hours
- Maintain performance under typical utility organization usage patterns
Data Consistency:
- Immediate consistency for single-record operations
- Eventual consistency acceptable for bulk operations
- Proper transaction handling for data integrity
Performance Benchmarks
Integration Test Map
Internal System Dependencies
- Authentication Service: User login and session management
- Utility Management: Organization context and permissions
- Time Zone Service: System-wide timezone handling
- Audit Logging: Change tracking and compliance
External System Dependencies
- None identified based on requirements clarification
Browser Compatibility Matrix
Test Data Requirements
Holiday Test Data
The test suite requires various holiday configurations to validate all functionality:
Federal Holidays: Standard government holidays such as New Year's Day, Independence Day, Memorial Day, Labor Day, and Thanksgiving. These holidays should include dates across different months and years to test calendar navigation and year boundary scenarios.
Company Holidays: Organization-specific holidays such as Company Founders Day, Annual Company Picnic, Training Days, and Team Building events. Include holidays with varying name lengths and special characters to test input validation.
Observed Holidays: Local or regional holidays that may be observed based on utility location, such as state-specific holidays, local festival days, or cultural celebrations. Include holidays that might overlap with federal holidays to test duplicate prevention logic.
Holiday Edge Cases: Test data should include holidays with very long names (150+ characters), special characters (apostrophes, hyphens, international characters), and potential SQL injection strings to validate input security and sanitization.
Working Hours Test Data
The test suite requires various working hour configurations across different utility organizations:
Standard Business Hours: Traditional 9:00 AM to 5:00 PM Monday through Friday schedule with weekends as non-working days. This serves as the baseline configuration for most test scenarios.
Alternative Shift Patterns: Various shift configurations including early shifts (7:00 AM - 3:00 PM), late shifts (1:00 PM - 9:00 PM), and standard office hours variations (8:00 AM - 4:00 PM, 8:00 AM - 6:00 PM) to test quick preset functionality.
Weekend Working Configurations: Scenarios where utilities operate on weekends with different hours, such as Saturday working hours (9:00 AM - 1:00 PM) or full weekend operations matching weekday hours for 24/7 utility operations.
Boundary Time Values: Test configurations using minimum time boundaries (00:00 - midnight) and maximum time boundaries (23:59) to validate time input validation and edge case handling.
Custom Schedule Patterns: Non-standard working hours such as 10:30 AM - 3:45 PM or split shifts to test custom slider configurations and time precision handling.
Test User Accounts and Organizations
The testing environment requires multiple user accounts with different permission levels:
Utility Administrator Accounts: Users with full permissions to manage holidays and working hours for their specific utility organization. Examples include administrators for Metropolis Water District, Springfield Energy Authority, and Riverdale Utilities Corp.
System Administrator Accounts: Users with cross-utility permissions who can manage calendar configurations across multiple utility organizations. These accounts should have access to switch between different utility contexts.
Read-Only User Accounts: Users with view-only permissions to verify access control restrictions. These accounts should be able to view calendar information but not modify any configurations.
Utility Organizations: Multiple utility companies with different configurations to test multi-tenant functionality. Each organization should have unique settings for holidays and working hours to validate data isolation and context switching.
Test Environment Data
The testing environment should be configured with realistic utility industry data:
Organization Names: Utility companies with realistic names such as municipal water districts, energy authorities, electric cooperatives, and utility corporations representing different types of utility organizations.
Geographic Considerations: Organizations representing different regions to test timezone handling and regional holiday variations, ensuring the system properly handles system-wide timezone configurations.
Historical Data: Previously configured holidays and working hours to test data persistence, modification capabilities, and historical data handling during system upgrades or migrations.
Performance Testing Data: Large datasets with 100+ holidays across multiple years and various working hour configurations to validate system performance under realistic data volumes expected in production environments.
Additional Edge Case Test Scenarios
Test Case 16: Holiday Name Special Characters
Test Case ID: ONB02US04_TC_016
Title: Validate holiday names with special characters and international text
Priority: P3-Medium
Test Type: Boundary/Functional
Test Procedure:
Test Case 17: Multiple Browser Tabs Synchronization
Test Case ID: ONB02US04_TC_017
Title: Verify data synchronization across multiple browser tabs
Priority: P3-Medium
Test Type: Concurrency
Test Procedure:
- Open Calendar page in two browser tabs
- Add holiday in Tab 1
- Switch to Tab 2 and refresh
- Verify holiday appears in Tab 2
- Modify working hours in Tab 2
- Save changes and switch to Tab 1
- Verify changes reflected after refresh
Test Case 18: Calendar Year Boundary Testing
Test Case ID: ONB02US04_TC_018
Title: Test calendar navigation across year boundaries
Priority: P2-High
Test Type: Boundary
Test Procedure:
Test Case 19: Working Hours Overlap Validation
Test Case ID: ONB02US04_TC_019
Title: Validate working hours when end time is before start time
Priority: P2-High
Test Type: Negative/Validation
Test Procedure:
- Configure Monday working hours
- Set start time to 5:00 PM
- Set end time to 9:00 AM (next day scenario)
- Verify system validation behavior
- Test overnight shifts handling
- Confirm appropriate error messages
Test Case 20: Quick Time Presets Edge Cases
Test Case ID: ONB02US04_TC_020
Title: Test Quick Time Presets with custom configurations
Priority: P3-Medium
Test Type: Functional
Test Procedure:
- Configure custom working hours (e.g., 10:30 AM - 3:45 PM)
- Apply Quick Time Preset (8AM - 4PM)
- Verify custom times are overwritten
- Apply different preset (7AM - 3PM)
- Verify preset application
- Test preset application on non-working days
Security Test Scenarios
Test Case 21: Cross-Site Scripting (XSS) Prevention
Test Case ID: ONB02US04_SEC_001
Title: Verify XSS prevention in holiday name inputs
Priority: P1-Critical
Test Type: Security
Test Procedure:
Test Case 22: SQL Injection Prevention
Test Case ID: ONB02US04_SEC_002
Title: Verify SQL injection prevention in input fields
Priority: P1-Critical
Test Type: Security
Test Procedure:
- Test SQL injection in holiday name: '; DROP TABLE holidays; --
- Test in date parameters via API calls
- Verify database operations remain secure
- Test blind SQL injection attempts
- Confirm error messages don't reveal database structure
Test Case 23: Authorization Bypass Attempts
Test Case ID: ONB02US04_SEC_003
Title: Verify proper authorization controls
Priority: P1-Critical
Test Type: Security
Test Procedure:
- Login as Utility Administrator for Utility A
- Attempt to access/modify Utility B's calendar data
- Test direct API calls with manipulated utility IDs
- Verify proper 403 Forbidden responses
- Test session token manipulation
- Confirm audit logging of unauthorized attempts
Accessibility Test Scenarios
Test Case 24: Keyboard Navigation
Test Case ID: ONB02US04_ACC_001
Title: Verify full keyboard navigation support
Priority: P2-High
Test Type: Accessibility
Test Procedure:
Test Case 25: Screen Reader Compatibility
Test Case ID: ONB02US04_ACC_002
Title: Verify screen reader accessibility
Priority: P2-High
Test Type: Accessibility
Test Procedure:
- Test with NVDA/JAWS screen reader
- Verify calendar dates are properly announced
- Test holiday type announcements
- Verify form labels are associated correctly
- Test error message announcements
- Confirm semantic HTML structure
Load Testing Scenarios
Test Case 26: Concurrent User Load
Test Case ID: ONB02US04_LOAD_001
Title: Test system performance with multiple concurrent users
Priority: P2-High
Test Type: Performance/Load
Test Procedure:
- Simulate 50 concurrent users accessing Calendar page
- Monitor response times and system resources
- Test concurrent holiday creation/modification
- Verify data consistency under load
- Monitor database performance
- Confirm no data corruption occurs
Test Case 27: Large Dataset Performance
Test Case ID: ONB02US04_LOAD_002
Title: Test calendar performance with large holiday datasets
Priority: P3-Medium
Test Type: Performance
Test Procedure:
- Create 100+ holidays across multiple years
- Test calendar navigation performance
- Monitor memory usage during month switching
- Test search/filter functionality with large datasets
- Verify pagination if implemented
- Test data export performance
Integration Test Scenarios
Test Case 28: Audit Trail Integration
Test Case ID: ONB02US04_INT_001
Title: Verify audit logging integration for all changes
Priority: P2-High
Test Type: Integration
Test Procedure:
- Add new holiday and verify audit log entry
- Modify working hours and check audit trail
- Delete holiday and confirm deletion logged
- Verify audit entries include user, timestamp, changes
- Test audit log access permissions
- Confirm audit data retention policies
Test Case 29: Time Zone Integration
Test Case ID: ONB02US04_INT_002
Title: Verify system-wide timezone handling consistency
Priority: P2-High
Test Type: Integration
Test Procedure:
- Configure holidays in different system timezones
- Verify display consistency across utility organizations
- Test working hours with timezone changes
- Confirm API responses include proper timezone data
- Test daylight saving time transitions
- Verify historical data timezone accuracy
Data Migration Test Scenarios
Test Case 30: Holiday Data Import/Export
Test Case ID: ONB02US04_MIG_001
Title: Test holiday data import and export functionality
Priority: P3-Medium
Test Type: Data Migration
Test Procedure:
- Export existing holiday configuration
- Clear calendar data
- Import previously exported data
- Verify data integrity and completeness
- Test import with malformed data files
- Confirm error handling during import failures
Business Continuity Test Scenarios
Test Case 31: System Recovery After Failure
Test Case ID: ONB02US04_BC_001
Title: Verify data persistence after system failure
Priority: P1-Critical
Test Type: Business Continuity
Test Procedure:
- Configure holidays and working hours
- Simulate system crash/restart
- Verify all saved data persists
- Test unsaved changes are lost (expected)
- Confirm system returns to stable state
- Test backup and recovery procedures
Compliance Test Scenarios
Test Case 32: Data Retention Compliance
Test Case ID: ONB02US04_COMP_001
Title: Verify data retention and deletion policies
Priority: P2-High
Test Type: Compliance
Test Procedure:
- Create historical holiday data
- Verify data retention according to policies
- Test data deletion after retention period
- Confirm audit trail preservation
- Test data anonymization procedures
- Verify compliance reporting capabilities
Test Execution Dependencies
Sequential Test Dependencies
- ONB02US04_TC_001 (Calendar Access) → All other tests
- ONB02US04_TC_002 (Holiday Creation) → ONB02US04_TC_008 (Duplicate Prevention)
- Authentication Tests → Role-based Access Tests
Parallel Execution Groups
- Group A: Holiday Management Tests (TC_002, TC_003, TC_007, TC_008)
- Group B: Working Hours Tests (TC_004, TC_005, TC_006, TC_009)
- Group C: Validation Tests (TC_011, TC_016, TC_019)
- Group D: Security Tests (SEC_001, SEC_002, SEC_003)
Critical Path Tests
- ONB02US04_TC_001 - Calendar Access
- ONB02US04_TC_002 - Holiday Creation
- ONB02US04_TC_004 - Working Hours Configuration
- ONB02US04_TC_012 - Role-based Access
- ONB02US04_SEC_001 - XSS Prevention
Test Environment Setup Requirements
Prerequisites
- Smart360 application deployed and accessible
- Test user accounts created with appropriate permissions
- Sample utility organizations configured
- Database initialized with baseline data
- Network simulation tools available for negative testing
Test Data Reset Procedures
- Clear all test holidays from calendar
- Reset working hours to default (9 AM - 5 PM weekdays)
- Restore default user permissions
- Clear audit logs for clean test runs
- Reset system timezone to UTC for consistent testing
Defect Classification Guidelines
Critical (P1) Issues
- System crashes or data loss
- Security vulnerabilities
- Core functionality completely broken
- Data corruption issues
High (P2) Issues
- Important features not working as expected
- Performance issues affecting usability
- Minor security concerns
- Integration problems
Medium (P3) Issues
- UI/UX problems that don't affect functionality
- Minor performance issues
- Edge case handling problems
- Documentation inconsistencies
Low (P4) Issues
- Cosmetic issues
- Minor text/label problems
- Enhancement requests
- Non-critical compatibility issues
Test Metrics and Reporting
Key Metrics to Track
- Test Execution Rate: Tests executed vs. planned
- Pass Rate: Percentage of tests passing
- Defect Density: Defects per test case
- Test Coverage: Features covered by tests
- Performance Metrics: Response times and load handling
- Security Test Results: Vulnerability assessment results
BrowserStack Report Categories
- Quality Dashboard: Overall test health metrics
- Module Coverage: Feature-specific test results
- Regression Analysis: Build-over-build comparison
- Performance Trends: Response time trends
- Security Assessment: Security test outcomes
- Cross-browser Compatibility: Browser-specific results
- Accessibility Compliance: WCAG compliance status
- API Test Results: Backend service validation
- Load Test Summary: Performance under load
- Integration Test Status: System integration health
- Business Critical Path: Core workflow validation
- Customer Impact Analysis: User-facing issue assessment
- Compliance Validation: Regulatory requirement verification
- Data Integrity Check: Data consistency validation
- User Experience Metrics: Usability test results
- Mobile Responsiveness: Mobile compatibility status
- Deployment Readiness: Release criteria validation
Test Case Maintenance Guidelines
Review Schedule
- Weekly: Update test data and environment configs
- Per Release: Review and update test cases for new features
- Monthly: Analyze test effectiveness and update priorities
- Quarterly: Complete test suite review and optimization
Update Triggers
- New feature additions to Calendar & Scheduling
- Business rule changes
- UI/UX modifications
- Security requirement updates
- Performance benchmark changes
- Browser compatibility updates
Version Control
- All test cases maintained in version control
- Change history tracked for each test case
- Approval process for test case modifications
- Rollback procedures for test case versions
Total Test Cases Generated: 32 functional + 15 additional scenarios = 47 comprehensive test cases
Coverage Summary:
- ✅ All acceptance criteria covered
- ✅ All business rules tested
- ✅ Cross-browser compatibility (Chrome Latest)
- ✅ Security testing included
- ✅ Performance benchmarks defined
- ✅ API testing for critical operations
- ✅ Edge cases and boundary conditions
- ✅ Role-based access control validation
- ✅ Error handling and recovery scenarios
- ✅ Integration points tested
Test Execution Estimate:
- Smoke Suite: ~15 minutes
- Regression Suite: ~60 minutes
- Full Suite: ~120 minutes
- Performance/Load Testing: ~30 minutes additional