Asset Registry--Systems Management (AX02US02)
Verification Points - COMPLETE THREE-STEP WIZARD VALIDATION
- Primary_Verification:
- AC02: Complete three-step wizard process functions correctly with all required fields
- AC18: All data validation rules work correctly with appropriate error messages
- Criticality Calculation: Mathematical formula produces correct weighted score
- Data Persistence: All form data preserved across steps and saved to database
- Secondary_Verifications:
- Navigation: Step progression works correctly with proper validation
- Auto-population: Facility selection triggers address and coordinate updates
- Real-time Updates: Criticality score updates immediately when sliders move
- File Management: Upload, progress, and removal functionality works correctly
- Negative_Verification:
- Required Field Validation: Cannot proceed without completing required fields
- Format Validation: Invalid emails, coordinates, and file types rejected
- Business Logic: Date constraints and capacity validations enforced
Systems Management Test Cases - AX02US02
Test Scenario Summary
Functional Test Scenarios
- Core System Registry Management: CRUD operations for water systems
- Multi-step System Registration: 3-step wizard workflow
- Real-time Dashboard Operations: KPI monitoring and filtering
- Asset Association Management: Connecting assets to systems
- Performance Monitoring: Real-time metrics and alerts
- Compliance Tracking: Water quality parameter monitoring
- Financial Management: Depreciation and cost tracking
Non-Functional Test Scenarios
- Performance: Dashboard load times, concurrent user handling
- Security: Role-based access, data validation
- Compatibility: Cross-browser, responsive design
- Usability: Navigation flow, error handling
ACCEPTANCE CRITERIA COVERAGE MATRIX
Test Case TC_001: Systems Registry Dashboard Load with ALL KPI Validations
Test Case Metadata
- Test Case ID: AX02US02_TC_001
- Title: Verify Systems Registry Dashboard with ALL Acceptance Criteria - KPI Calculations and Navigation
- Created By: Prachi
- Created Date: 2025-01-18
- Version: 2.0
Classification
- Module/Feature: Systems Management (AX02US02)
- Test Type: Functional
- Test Level: System
- Priority: P1-Critical
- Execution Phase: Smoke
- Automation Status: Planned-for-Automation
Business Context
- Customer_Segment: Enterprise
- Revenue_Impact: High
- Business_Priority: Must-Have
- Customer_Journey: Daily-Usage
- Compliance_Required: Yes
- SLA_Related: Yes
Quality Metrics
- Risk_Level: Medium
- Complexity_Level: Medium
- Expected_Execution_Time: 3 minutes
- Reproducibility_Score: High
- Data_Sensitivity: Medium
- Failure_Impact: High
Coverage Tracking
- Feature_Coverage: 90%
- Integration_Points: Dashboard-API, Database, Real-time-Data
- Code_Module_Mapped: AX02
- Requirement_Coverage: Complete
- Cross_Platform_Support: Web
Stakeholder Reporting
- Primary_Stakeholder: Product
- Report_Categories: Quality-Dashboard, Module-Coverage
- Trend_Tracking: Yes
- Executive_Visibility: Yes
- Customer_Impact_Level: High
Requirements Traceability
Test Environment
- Environment: Staging
- Browser/Version: Chrome 115+
- Device/OS: Windows 10/11
- Screen_Resolution: Desktop-1920x1080
- Dependencies: Database server, SCADA integration service
- Performance_Baseline: Page load < 3 seconds
- Data_Requirements: 10 sample systems with varying statuses
Prerequisites
- Setup_Requirements: Admin user logged in, sample systems data populated
- User_Roles_Permissions: Asset Manager or Plant Supervisor role
- Test_Data:
- 10 total systems (7 operational, 1 under maintenance, 6 high criticality)
- Sample facilities: Main Treatment Plant, North Distribution Center
- Mock SCADA data for real-time metrics
- Prior_Test_Cases: Login functionality (TC_LOGIN_001)
Test Procedure -