Enhancements - MX
1) VEE Config and Schedule
UTILITY SERVICE DROPDOWN - From onboarding -
Water,Gas,Electricity,Waste Water,Thermal/Heat ,EV,Micro-grid,Broadband,Property Tax ,Waste,kg ,Hot Water,Storm Water ,Trash,Sewer
Frequency - hourly,daily,month,weekly
Wireframe - link
2) Meter inventory management
USED METER TAB -
Table list column - Device Number,Meter Type,Utility Service,Previous Premise,Previous Consumer Name,Age,Uninstalled On,Last Reading,Actions(view,delete)
View -
key stats - unassigned
details tab -> Status - Unassigned
allocation tab - Previous consumer
Actions - Dispose -
Final information - Last Read Date,Last Reading,Reading Status,Days in Service,Device Number,Meter Type,Smart Meter
reason to dispose - decomissioned,lost,Faulty/Defective,End of Life/Age,Upgrade to Smart Meter,damage/accident
Filters -
meter type - photo meter, smart meter, headend meter, prepaid meter, manual meter
utility services - Water,Gas,Electricity,Waste Water,Thermal/Heat ,EV,Micro-grid,Broadband,Property Tax ,Waste,kg ,Hot Water,Storm Water,Trash,Sewer
Age Range -
uninstalled date range -
sorts on table columns - previous consumer name ,age,uninstalled on
Wireframe - link
3) Revisit and assign to meter reader in validations
add checkboxes on the table list and add an assign all button.
when clicked on assign all button opens a modal with table list view of columns - Route Name,Meters,Consumers,Premises,Assigned To,Assigned Date,Due Date,Status( started,dispatched,completed,partial) ,Actions(assign )
from the modal when assign button is clicked opens another modal to assign Meter Reader with a table list of columns - User Id,Name,Contact,Workload. from there select single or multiple and assign the meter reader.