Skip to main content

Read Cycle Management Test Cases - MX02US02

Test Case 1: Create Read Cycle with Unique Name (AC1)

Test Case Metadata

  • Test Case ID: MX02US02_TC_001
  • Title: Verify read cycle creation with unique naming convention following business rules
  • Created By: Hetal
  • Created Date: August 17, 2025
  • Version: 1.0

Classification

  • Module/Feature: Read Cycle Management
  • Test Type: Functional
  • Test Level: System
  • Priority: P1-Critical
  • Execution Phase: Smoke
  • Automation Status: Planned-for-Automation

Enhanced Tags for 17 Reports Support

  • Tags: Happy-Path, Consumer, Api, Database, MOD-ReadCycle, P1-Critical, Phase-Smoke, Type-Functional, Platform-Web, Report-Engineering, Report-Product, Report-QA, Report-Quality-Dashboard, Report-Smoke-Test-Results, Customer-All, Risk-High, Business-Critical, Revenue-Impact-High, Integration-CxServices, Integration-API, Integration-Database, Happy-Path

Business Context

  • Customer_Segment: All
  • Revenue_Impact: High
  • Business_Priority: Must-Have
  • Customer_Journey: Daily-Usage
  • Compliance_Required: Yes
  • SLA_Related: Yes

Quality Metrics

  • Risk_Level: High
  • Complexity_Level: Medium
  • Expected_Execution_Time: 5 minutes
  • Reproducibility_Score: High
  • Data_Sensitivity: Medium
  • Failure_Impact: Critical

Coverage Tracking

  • Feature_Coverage: 15%
  • Integration_Points: CxServices, API, Database, User Authentication
  • Code_Module_Mapped: CX-Web
  • Requirement_Coverage: Complete
  • Cross_Platform_Support: Web

Stakeholder Reporting

  • Primary_Stakeholder: Engineering
  • Report_Categories: Quality-Dashboard, Smoke-Test-Results, Module-Coverage
  • Trend_Tracking: Yes
  • Executive_Visibility: Yes
  • Customer_Impact_Level: High

Requirements Traceability

Test Environment

  • Environment: Dev/Staging/Production
  • Browser/Version: Chrome 115+
  • Device/OS: Windows 10/11
  • Screen_Resolution: Desktop-1920x1080
  • Dependencies: User Authentication Service, Read Cycle API, Database, CxServices
  • Performance_Baseline: Form submission < 2 seconds
  • Data_Requirements: Valid user credentials, available routes with meters

Prerequisites

  • Setup_Requirements: User authenticated as Meter Reading Supervisor
  • User_Roles_Permissions: Meter Reading Supervisor role with create permissions
  • Test_Data: User "John Smith", Areas configured, Routes available with meters
  • Prior_Test_Cases: Authentication verification

Test Procedure

Step #

Action

Expected Result

Test Data

Comments

1

Navigate to Read Cycles section from main menu

Read Cycles page loads with dashboard counters (Active: 4, Completed: 1, Delayed: 12) and "Create Read Cycle" button visible

URL: /read-cycles

AC1 - Navigation requirement

2

Click "Create Read Cycle" button in upper right corner

Create Read Cycle form opens with Basic Information section and Meter Dashboard on right side

Button: "Create Read Cycle"

AC1 - Form access

3

Enter unique Read Cycle Name in required field

Field accepts input without validation errors, name appears in form

"Downtown Commercial Q3 2025"

AC1 - Unique naming

4

Select Area from dropdown menu

Area dropdown populates with available areas, Sub Area dropdown becomes enabled

Area: "Downtown"

BR1 - Area dependency

5

Select Sub Area from filtered dropdown

Sub Area filters based on selected area, Utility Services dropdown enabled

Sub Area: "Commercial Zone"

BR2 - Sub area filtering

6

Select Utility Service from dropdown

Service selection enables Meter Type dropdown

Utility Service: "Water"

BR3 - Service selection

7

Select Meter Type from dropdown

Type selection updates available routes in Routes Selection section

Meter Type: "Manual Meter"

BR4 - Type filtering

8

Enter Cycle Duration in days field

Duration field accepts integer between 1-90, updates Read Cycle Summary

Duration: 30 days

AC7 - Duration validation

9

Search for route in Routes Selection

Search filters available routes list

Search: "commercial"

AC3 - Route filtering

10

Select "downtime commercial area" route checkbox

Route selected, Read Cycle Summary updates: Routes=1, Meters dashboard shows real-time updates

Route: "downtime commercial area"

AC3 - Real-time updates

11

Verify Meter Dashboard updates in real-time

System-wide Meters: 23489, Meters in This Cycle updates based on selection

Dynamic counts

AC5, AC6 - Meter metrics

12

Click "Create Read Cycle" button

Success message displayed, redirected to read cycles list, new cycle appears with status "Scheduled"

Submit button

AC1 - Successful creation

Verification Points

  • Primary_Verification: Read cycle created with unique name and appears in cycles list
  • Secondary_Verifications: Audit trail entry created, meter dashboard updates correctly, all required fields validated
  • Negative_Verification: System prevents duplicate names, validates required fields

Test Results (Template)

  • Status: [Pass/Fail/Blocked/Not-Tested]
  • Actual_Results: [Template for recording actual behavior]
  • Execution_Date: [When test was executed]
  • Executed_By: [Who performed the test]
  • Execution_Time: [Actual time taken]
  • Defects_Found: [Bug IDs if issues discovered]
  • Screenshots_Logs: [Evidence references]

Execution Analytics

  • Execution_Frequency: Daily
  • Maintenance_Effort: Low
  • Automation_Candidate: Yes

Test Relationships

  • Blocking_Tests: Authentication validation
  • Blocked_Tests: TC_003, TC_017, TC_025
  • Parallel_Tests: TC_002, TC_027
  • Sequential_Tests: Must run before edit/delete tests

Additional Information

  • Notes: Critical path for read cycle management workflow
  • Edge_Cases: Special characters in names, extremely long names
  • Risk_Areas: Database unique constraint validation, concurrent creation
  • Security_Considerations: User authorization for creation, audit trail integrity

Missing Scenarios Identified

  • Scenario_1: Duplicate name validation with case sensitivity
  • Type: Error Handling
  • Rationale: Business rule mentions unique names but case handling unclear
  • Priority: P2




Test Case 2: Dashboard Counters Display Accuracy (AC2)

Test Case Metadata

  • Test Case ID: MX02US02_TC_002
  • Title: Verify dashboard displays accurate Active, Completed, and Delayed cycle counters with real-time updates
  • Created By: Hetal
  • Created Date: August 17, 2025
  • Version: 1.0

Classification

  • Module/Feature: Read Cycle Management
  • Test Type: Functional
  • Test Level: System
  • Priority: P1-Critical
  • Execution Phase: Smoke
  • Automation Status: Automated

Enhanced Tags for 17 Reports Support

  • Tags: Happy-Path, Consumer, Dashboard, Database, MOD-ReadCycle, P1-Critical, Phase-Smoke, Type-Functional, Platform-Web, Report-Product, Report-QA, Report-Quality-Dashboard, Report-Smoke-Test-Results, Report-Module-Coverage, Customer-All, Risk-Medium, Business-Critical, Revenue-Impact-Medium, Integration-Database, Happy-Path

Business Context

  • Customer_Segment: All
  • Revenue_Impact: Medium
  • Business_Priority: Must-Have
  • Customer_Journey: Daily-Usage
  • Compliance_Required: Yes
  • SLA_Related: Yes

Quality Metrics

  • Risk_Level: Medium
  • Complexity_Level: Low
  • Expected_Execution_Time: 3 minutes
  • Reproducibility_Score: High
  • Data_Sensitivity: Low
  • Failure_Impact: High

Coverage Tracking

  • Feature_Coverage: 10%
  • Integration_Points: Database, Caching Layer
  • Code_Module_Mapped: CX-Web-Dashboard
  • Requirement_Coverage: Complete
  • Cross_Platform_Support: Web

Stakeholder Reporting

  • Primary_Stakeholder: Product
  • Report_Categories: Quality-Dashboard, Module-Coverage, Smoke-Test-Results
  • Trend_Tracking: Yes
  • Executive_Visibility: Yes
  • Customer_Impact_Level: Medium

Requirements Traceability

Test Environment

  • Environment: Dev/Staging/Production
  • Browser/Version: Chrome 115+
  • Device/OS: Windows 10/11
  • Screen_Resolution: Desktop-1920x1080
  • Dependencies: Database with existing read cycles, Counter calculation service
  • Performance_Baseline: Counter calculation < 500ms
  • Data_Requirements: Multiple read cycles in different states (Active: 4, Completed: 1, Delayed: 12)

Prerequisites

  • Setup_Requirements: Database populated with read cycles in various states
  • User_Roles_Permissions: Meter Reading Supervisor role with view permissions
  • Test_Data: Existing cycles - "Savaii 202501 R4", "Savaii 202501 R3", "commercial district"
  • Prior_Test_Cases: User authentication verified

Test Procedure

Step #

Action

Expected Result

Test Data

Comments

1

Navigate to Read Cycles dashboard from main menu

Dashboard loads displaying three summary cards: Active Cycles, Completed Cycles, Delayed Cycles

URL: /read-cycles

AC2 - Dashboard access

2

Verify Active Cycles counter display

Active Cycles card shows count "4" with blue activity icon and description "Read cycles currently in progress and being executed by meter readers"

Expected: 4

AC2 - Active count accuracy

3

Verify Completed Cycles counter display

Completed Cycles card shows count "1" with green checkmark icon and description "Read cycles that have been fully completed with all meter readings collected"

Expected: 1

AC2 - Completed count accuracy

4

Verify Delayed Cycles counter display

Delayed Cycles card shows count "12" with yellow warning icon and description "Read cycles that have fallen behind schedule and require attention"

Expected: 12

AC2 - Delayed count accuracy

5

Create new read cycle using TC_001 steps

Active counter increments to "5", counters update in real-time without page refresh

Previous count + 1

AC2 - Real-time updates

6

Complete an active read cycle by submitting all readings

Active counter decreases to "4", Completed counter increases to "2"

Cycle state change

AC2 - Status change reflection

7

Mark a cycle as delayed by exceeding end date

Delayed counter increases to "13", total counts remain consistent

Date manipulation

AC2 - Delayed status tracking

8

Refresh browser page

All counters maintain accurate values after page reload

F5 refresh

AC2 - Data persistence

9

Open multiple browser tabs

Counters show consistent values across all tabs

Multiple sessions

AC2 - Cross-session consistency

10

Verify counter totals mathematics

Sum of all counters equals total cycles in system

Mathematical verification

AC2 - Data integrity

Verification Points

  • Primary_Verification: All three counters display accurate counts matching database state
  • Secondary_Verifications: Real-time updates without refresh, proper icons and descriptions, consistent totals
  • Negative_Verification: Counters don't show negative values, no counting errors during state transitions

Test Results (Template)

  • Status: [Pass/Fail/Blocked/Not-Tested]
  • Actual_Results: [Template for recording actual behavior]
  • Execution_Date: [When test was executed]
  • Executed_By: [Who performed the test]
  • Execution_Time: [Actual time taken]
  • Defects_Found: [Bug IDs if issues discovered]
  • Screenshots_Logs: [Evidence references]

Execution Analytics

  • Execution_Frequency: Daily
  • Maintenance_Effort: Low
  • Automation_Candidate: Yes

Test Relationships

  • Blocking_Tests: Database setup with test data
  • Blocked_Tests: Performance tests requiring accurate counters
  • Parallel_Tests: TC_001, TC_013
  • Sequential_Tests: Can run independently

Additional Information

  • Notes: Foundation for dashboard functionality and user workflow
  • Edge_Cases: Zero counts in all categories, extremely large numbers
  • Risk_Areas: Database performance with large datasets, caching issues
  • Security_Considerations: Data access permissions, counter manipulation prevention

Missing Scenarios Identified

  • Scenario_1: Counter performance with 10,000+ cycles
  • Type: Performance
  • Rationale: Large utility companies may have extensive cycle history
  • Priority: P3




Test Case 3: Route Selection Real-time Updates (AC3)

Test Case Metadata

  • Test Case ID: MX02US02_TC_003
  • Title: Verify route selection enables real-time updating of meter counts and conditions in Meter Dashboard
  • Created By: Hetal
  • Created Date: August 17, 2025
  • Version: 1.0

Classification

  • Module/Feature: Read Cycle Management
  • Test Type: Functional
  • Test Level: Integration
  • Priority: P2-High
  • Execution Phase: Regression
  • Automation Status: Planned-for-Automation

Enhanced Tags for 17 Reports Support

  • Tags: Happy-Path, Consumer, Api, Database, UI, MOD-ReadCycle, P2-High, Phase-Regression, Type-Functional, Platform-Web, Report-Engineering, Report-Product, Report-Integration-Testing, Report-Module-Coverage, Report-Regression-Coverage, Customer-All, Risk-Medium, Business-High, Revenue-Impact-Medium, Integration-API, Integration-Database, Happy-Path

Business Context

  • Customer_Segment: All
  • Revenue_Impact: Medium
  • Business_Priority: Should-Have
  • Customer_Journey: Daily-Usage
  • Compliance_Required: No
  • SLA_Related: Yes

Quality Metrics

  • Risk_Level: Medium
  • Complexity_Level: High
  • Expected_Execution_Time: 7 minutes
  • Reproducibility_Score: High
  • Data_Sensitivity: Medium
  • Failure_Impact: Medium

Coverage Tracking

  • Feature_Coverage: 20%
  • Integration_Points: Route API, Meter Service, Real-time Updates Service
  • Code_Module_Mapped: CX-Web-Forms
  • Requirement_Coverage: Complete
  • Cross_Platform_Support: Web

Stakeholder Reporting

  • Primary_Stakeholder: Engineering
  • Report_Categories: Integration-Testing, Module-Coverage, Regression-Coverage
  • Trend_Tracking: Yes
  • Executive_Visibility: No
  • Customer_Impact_Level: Medium

Requirements Traceability

Test Environment

  • Environment: Dev/Staging
  • Browser/Version: Chrome 115+
  • Device/OS: Windows 10/11
  • Screen_Resolution: Desktop-1920x1080
  • Dependencies: Route Management API, Meter Data Service, WebSocket for real-time updates
  • Performance_Baseline: Real-time updates < 300ms
  • Data_Requirements: Routes with varying meter counts - "Read-Book-250" (27 meters), "Read-Book-150" (56 meters)

Prerequisites

  • Setup_Requirements: Routes configured with different meter counts and conditions
  • User_Roles_Permissions: Meter Reading Supervisor with route access
  • Test_Data: Routes: "Read-Book-250", "Read-Book-150", "Read-Book-177", "Dummy Route"
  • Prior_Test_Cases: TC_001 completed successfully

Test Procedure

Step #

Action

Expected Result

Test Data

Comments

1

Open Create Read Cycle form from dashboard

Form loads with empty Routes Selection section and Meter Dashboard showing System-wide Meters: 23489 total

Create button click

AC3 - Initial state

2

Note initial Meter Dashboard values

System-wide Meters: 23489 (Assigned: 23471, Unassigned: 18), Meters in This Cycle: 0

Initial state

AC3 - Baseline metrics

3

Search for "Read-Book-250" in Routes Selection search bar

Route appears in filtered results showing 27 meters, 3 premises

Search: "Read-Book-250"

AC3 - Route filtering

4

Select "Read-Book-250" route checkbox

Route selected, Read Cycle Summary updates: Routes=1, Total Meters=27, Meter Dashboard "Meters in This Cycle" updates to 27

Route checkbox

AC3 - Real-time update

5

Verify Meter Dashboard real-time update

Meters in This Cycle: 27 (Assigned: 27, Unassigned: 0), progress bar updates, meter conditions update

Dynamic update

AC3 - Dashboard sync

6

Select additional route "Read-Book-150"

Routes=2, Total Meters=83 (27+56), Meter Dashboard updates to show combined metrics

Route: "Read-Book-150"

AC3 - Additive updates

7

Verify combined meter metrics

Meters in This Cycle: 83, meter conditions show aggregated data from both routes

Combined metrics

AC3 - Aggregation accuracy

8

Unselect "Read-Book-250" route

Routes=1, Total Meters=56, Meter Dashboard decreases by 27 meters

Uncheck first route

AC3 - Subtraction updates

9

Verify dashboard decrements correctly

Meters in This Cycle: 56, conditions reflect only "Read-Book-150" route

Decremented values

AC3 - Accurate subtraction

10

Select "Dummy Route" with 1307 meters

Routes=2, Total Meters=1363 (56+1307), dashboard handles large number updates

Route: "Dummy Route"

AC3 - Large dataset handling

11

Use "Select All" button

All available routes selected, dashboard shows maximum values, performance remains acceptable

Select All function

AC3 - Bulk selection

12

Use "Clear All" button

All selections cleared, dashboard returns to System-wide only view, Meters in This Cycle=0

Clear All function

AC3 - Bulk deselection

Verification Points

  • Primary_Verification: Meter counts update in real-time with route selection changes
  • Secondary_Verifications: Meter conditions and categories update correctly, performance remains under 300ms
  • Negative_Verification: Deselection properly decreases counts, no incorrect aggregations

Test Results (Template)

  • Status: [Pass/Fail/Blocked/Not-Tested]
  • Actual_Results: [Template for recording actual behavior]
  • Execution_Date: [When test was executed]
  • Executed_By: [Who performed the test]
  • Execution_Time: [Actual time taken]
  • Defects_Found: [Bug IDs if issues discovered]
  • Screenshots_Logs: [Evidence references]

Execution Analytics

  • Execution_Frequency: Weekly
  • Maintenance_Effort: Medium
  • Automation_Candidate: Yes

Test Relationships

  • Blocking_Tests: TC_001 (Create form access)
  • Blocked_Tests: TC_005, TC_006 (Meter metrics tests)
  • Parallel_Tests: TC_004, TC_007
  • Sequential_Tests: Requires form to be open first

Additional Information

  • Notes: Critical for user experience during route selection
  • Edge_Cases: Network latency affecting updates, concurrent user selections
  • Risk_Areas: WebSocket connection failures, database query performance
  • Security_Considerations: Route access permissions, data validation

Missing Scenarios Identified

  • Scenario_1: Real-time updates with network latency simulation
  • Type: Performance
  • Rationale: Real-world conditions may affect update speed
  • Priority: P3




Test Case 4: Scheduling Conflict Prevention (AC4)

Test Case Metadata

  • Test Case ID: MX02US02_TC_004
  • Title: Verify system prevents scheduling conflicts for same routes in overlapping read cycles with clear error messaging
  • Created By: Hetal
  • Created Date: August 17, 2025
  • Version: 1.0

Classification

  • Module/Feature: Read Cycle Management
  • Test Type: Functional
  • Test Level: System
  • Priority: P1-Critical
  • Execution Phase: Regression
  • Automation Status: Manual

Enhanced Tags for 17 Reports Support

  • Tags: Negative, Consumer, Api, Database, Validation, MOD-ReadCycle, P1-Critical, Phase-Regression, Type-Functional, Platform-Web, Report-Engineering, Report-QA, Report-Quality-Dashboard, Report-Regression-Coverage, Report-User-Acceptance, Customer-All, Risk-High, Business-Critical, Revenue-Impact-High, Integration-Database, Integration-Validation

Business Context

  • Customer_Segment: All
  • Revenue_Impact: High
  • Business_Priority: Must-Have
  • Customer_Journey: Daily-Usage
  • Compliance_Required: Yes
  • SLA_Related: Yes

Quality Metrics

  • Risk_Level: High
  • Complexity_Level: High
  • Expected_Execution_Time: 8 minutes
  • Reproducibility_Score: High
  • Data_Sensitivity: High
  • Failure_Impact: Critical

Coverage Tracking

  • Feature_Coverage: 15%
  • Integration_Points: Route Conflict Service, Date Validation API, Database Constraints
  • Code_Module_Mapped: CX-Web-Validation
  • Requirement_Coverage: Complete
  • Cross_Platform_Support: Web

Stakeholder Reporting

  • Primary_Stakeholder: Engineering
  • Report_Categories: Quality-Dashboard, Regression-Coverage, User-Acceptance
  • Trend_Tracking: Yes
  • Executive_Visibility: Yes
  • Customer_Impact_Level: High

Requirements Traceability

Test Environment

  • Environment: Dev/Staging
  • Browser/Version: Chrome 115+
  • Device/OS: Windows 10/11
  • Screen_Resolution: Desktop-1920x1080
  • Dependencies: Route Conflict Detection Service, Date Validation API, Database constraints
  • Performance_Baseline: Conflict validation < 1 second
  • Data_Requirements: Existing active cycle with "Read-Book-250" route scheduled July 21-26, 2025

Prerequisites

  • Setup_Requirements: Existing read cycle with specific route and date range
  • User_Roles_Permissions: Meter Reading Supervisor with create/edit permissions
  • Test_Data: Existing cycle "commercial district" with route "Read-Book-250", dates July 21-26, 2025
  • Prior_Test_Cases: TC_001 for cycle creation process

Test Procedure

Step #

Action

Expected Result

Test Data

Comments

1

Verify existing active read cycle in system

"commercial district" cycle exists with route "Read-Book-250", dates July 21-26, 2025, status "Active"

Existing cycle data

AC4 - Conflict setup

2

Navigate to Create Read Cycle form

Form opens normally without any restrictions

Create form access

AC4 - Normal access

3

Enter new cycle name for conflicting cycle

Field accepts input without validation errors

"July 2025 Conflict Test"

AC4 - Name entry

4

Configure basic information (Area, Sub Area, Utility Service)

All fields populate normally, no conflict detected yet

Area: "Downtown", Service: "Water"

AC4 - Basic config

5

Set Cycle Duration to create date overlap

Duration field accepts value, no validation error at field level

Duration: 10 days

AC4 - Duration setup

6

Attempt to select conflicting route "Read-Book-250"

Route appears in available routes list initially

Route: "Read-Book-250"

AC4 - Route visibility

7

Select the conflicting route checkbox

System immediately shows conflict warning: "Route Read-Book-250 is already assigned to active cycle 'commercial district' (July 21-26, 2025)"

Conflict selection

AC4 - Immediate validation

8

Verify route remains selected but flagged

Route stays selected with red warning icon, Read Cycle Summary shows warning indicator

Visual conflict indicator

AC4 - Visual feedback

9

Attempt to submit form with conflicting route

Submit button disabled OR form shows validation error: "Cannot create cycle with conflicting routes. Please remove conflicted routes or adjust dates."

Form submission

AC4 - Submission prevention

10

Remove conflicting route and select different route "Read-Book-150"

Conflict warning disappears, route selection succeeds, Read Cycle Summary updates normally

Alternative route

AC4 - Resolution path

11

Submit form with non-conflicting route

Cycle created successfully, appears in cycles list with status "Scheduled"

Successful creation

AC4 - Valid submission

12

Test edge case: same-day start/end dates

System allows adjacent dates (end date = start date of next cycle) without conflict

Edge case dates

AC4 - Date boundary logic

Verification Points

  • Primary_Verification: System prevents route conflicts with clear, actionable error messages
  • Secondary_Verifications: Alternative routes remain selectable, UI provides resolution guidance
  • Negative_Verification: No workarounds allow conflicting cycles to be created

Test Results (Template)

  • Status: [Pass/Fail/Blocked/Not-Tested]
  • Actual_Results: [Template for recording actual behavior]
  • Execution_Date: [When test was executed]
  • Executed_By: [Who performed the test]
  • Execution_Time: [Actual time taken]
  • Defects_Found: [Bug IDs if issues discovered]
  • Screenshots_Logs: [Evidence references]

Execution Analytics

  • Execution_Frequency: Per-Release
  • Maintenance_Effort: Medium
  • Automation_Candidate: Planned

Test Relationships

  • Blocking_Tests: TC_001 (Cycle creation), existing cycle setup
  • Blocked_Tests: Schedule functionality tests
  • Parallel_Tests: TC_019 (Other validations)
  • Sequential_Tests: Requires specific test data setup

Additional Information

  • Notes: Critical business rule preventing operational conflicts
  • Edge_Cases: Timezone considerations, daylight saving time transitions
  • Risk_Areas: Race conditions in concurrent creation, database constraint timing
  • Security_Considerations: Prevention of malicious conflict creation, audit trail integrity

Missing Scenarios Identified

  • Scenario_1: API-level conflict prevention testing
  • Type: Integration
  • Rationale: UI validation should be backed by API-level constraints
  • Priority: P1




Test Case 5: Meter Condition Metrics Display (AC5)

Test Case Metadata

  • Test Case ID: MX02US02_TC_005
  • Title: Verify system displays accurate meter condition metrics (Normal, Faulty, RCNT, Disconnected) with real-time updates based on route selection
  • Created By: Hetal
  • Created Date: August 17, 2025
  • Version: 1.0

Classification

  • Module/Feature: Read Cycle Management
  • Test Type: Functional
  • Test Level: System
  • Priority: P2-High
  • Execution Phase: Regression
  • Automation Status: Automated

Enhanced Tags for 17 Reports Support

  • Tags: Happy-Path, Consumer, Dashboard, Database, Api, MOD-ReadCycle, P2-High, Phase-Regression, Type-Functional, Platform-Web, Report-Product, Report-Engineering, Report-Module-Coverage, Report-Regression-Coverage, Report-Quality-Dashboard, Customer-All, Risk-Medium, Business-High, Revenue-Impact-Medium, Integration-Meter-Service, Happy-Path

Business Context

  • Customer_Segment: All
  • Revenue_Impact: Medium
  • Business_Priority: Should-Have
  • Customer_Journey: Daily-Usage
  • Compliance_Required: No
  • SLA_Related: No

Quality Metrics

  • Risk_Level: Medium
  • Complexity_Level: Medium
  • Expected_Execution_Time: 6 minutes
  • Reproducibility_Score: High
  • Data_Sensitivity: Medium
  • Failure_Impact: Medium

Coverage Tracking

  • Feature_Coverage: 18%
  • Integration_Points: Meter Data Service, Condition Classification API
  • Code_Module_Mapped: CX-Web-Dashboard
  • Requirement_Coverage: Complete
  • Cross_Platform_Support: Web

Stakeholder Reporting

  • Primary_Stakeholder: Product
  • Report_Categories: Module-Coverage, Quality-Dashboard, Regression-Coverage
  • Trend_Tracking: Yes
  • Executive_Visibility: No
  • Customer_Impact_Level: Medium

Requirements Traceability

Test Environment

  • Environment: Dev/Staging
  • Browser/Version: Chrome 115+
  • Device/OS: Windows 10/11
  • Screen_Resolution: Desktop-1920x1080
  • Dependencies: Meter Data Service, Condition Classification API, Real-time Update Service
  • Performance_Baseline: Condition updates < 500ms
  • Data_Requirements: Routes with meters in various conditions (Normal: 23489, Faulty: 0, RCNT: 0, Disconnected: 0)

Prerequisites

  • Setup_Requirements: Routes contain meters with various conditions distributed across system
  • User_Roles_Permissions: Meter Reading Supervisor with meter data access
  • Test_Data: System-wide meters with known condition distribution
  • Prior_Test_Cases: TC_001 for form access, TC_003 for route selection

Test Procedure

Step #

Action

Expected Result

Test Data

Comments

1

Access Create Read Cycle form

Form loads with Meter Dashboard showing Meter Conditions section with four categories

Form access

AC5 - Conditions visibility

2

Verify initial system-wide meter conditions display

Normal: 23489 (green checkmark), Faulty: 0 (yellow warning), RCNT: 0 (blue arrow), Disconnected: 0 (red X)

System-wide baseline

AC5 - Initial state

3

Verify Meter Conditions section visual indicators

Each condition has distinct icon and color: Normal (green ✓), Faulty (yellow ⚠), RCNT (blue ↻), Disconnected (red ⚡)

Visual indicators

AC5 - UI consistency

4

Select route "Read-Book-250" with 27 meters

Meter Conditions in "Meters in This Cycle" section updates dynamically to show conditions for selected route only

Route: "Read-Book-250"

AC5 - Route-specific conditions

5

Verify condition counts update in real-time

Meters in This Cycle conditions show subset of system-wide conditions relevant to selected route

Real-time update

AC5 - Dynamic updates

6

Add second route "Read-Book-150" with 56 meters

Condition counts aggregate from both routes: Normal increases by 56, other conditions adjust accordingly

Route: "Read-Book-150"

AC5 - Aggregated conditions

7

Verify mathematical accuracy of aggregation

Total conditions for both routes sum correctly: Normal = (Route1_Normal + Route2_Normal), same for all conditions

Mathematical verification

AC5 - Accurate aggregation

8

Remove first route "Read-Book-250"

Condition counts decrease by exactly the amounts from removed route, remaining route conditions displayed accurately

Route removal

AC5 - Subtraction accuracy

9

Select route with mixed meter conditions

System displays accurate distribution across all four condition types for the specific route

Mixed conditions route

AC5 - Condition variety

10

Test with route containing faulty meters

Faulty count increases from 0 to actual faulty meter count in selected route, yellow warning indicator updates

Route with faults

AC5 - Faulty meter tracking

11

Test with route containing RCNT meters

RCNT count updates from 0 to show meters requiring reconnection, blue indicator reflects changes

Route with RCNT

AC5 - RCNT condition tracking

12

Verify condition totals equal total meters

Sum of (Normal + Faulty + RCNT + Disconnected) equals "Meters in This Cycle" total count

Mathematical validation

AC5 - Total consistency

Verification Points

  • Primary_Verification: All four meter conditions display accurate counts reflecting selected routes
  • Secondary_Verifications: Real-time updates with route changes, visual indicators match condition types, mathematical consistency
  • Negative_Verification: No negative counts, no missing conditions, totals always reconcile

Test Results (Template)

  • Status: [Pass/Fail/Blocked/Not-Tested]
  • Actual_Results: [Template for recording actual behavior]
  • Execution_Date: [When test was executed]
  • Executed_By: [Who performed the test]
  • Execution_Time: [Actual time taken]
  • Defects_Found: [Bug IDs if issues discovered]
  • Screenshots_Logs: [Evidence references]

Execution Analytics

  • Execution_Frequency: Weekly
  • Maintenance_Effort: Low
  • Automation_Candidate: Yes

Test Relationships

  • Blocking_Tests: TC_003 (Route selection functionality)
  • Blocked_Tests: TC_006 (Meter categories), TC_012 (Route-specific views)
  • Parallel_Tests: TC_006, TC_018
  • Sequential_Tests: Requires route selection capability

Additional Information

  • Notes: Essential for operational planning and resource allocation
  • Edge_Cases: Routes with all meters in single condition, empty routes
  • Risk_Areas: Data synchronization between meter service and dashboard
  • Security_Considerations: Meter condition data accuracy, unauthorized access prevention

Missing Scenarios Identified

  • Scenario_1: Condition changes during active read cycle
  • Type: Integration
  • Rationale: Meter conditions may change while cycle is in progress
  • Priority: P3




Test Case 6: Meter Category Distribution Display (AC6)

Test Case Metadata

  • Test Case ID: MX02US02_TC_006
  • Title: Verify system displays accurate meter category distribution (Industrial, Residential, Commercial, Government, Agricultural) with dynamic updates
  • Created By: Hetal
  • Created Date: August 17, 2025
  • Version: 1.0

Classification

  • Module/Feature: Read Cycle Management
  • Test Type: Functional
  • Test Level: System
  • Priority: P2-High
  • Execution Phase: Regression
  • Automation Status: Automated

Enhanced Tags for 17 Reports Support

  • Tags: Happy-Path, Consumer, Dashboard, Database, Api, MOD-ReadCycle, P2-High, Phase-Regression, Type-Functional, Platform-Web, Report-Product, Report-Engineering, Report-Module-Coverage, Report-Regression-Coverage, Report-Customer-Segment-Analysis, Customer-All, Risk-Medium, Business-High, Revenue-Impact-Medium, Integration-Meter-Service, Happy-Path

Business Context

  • Customer_Segment: All
  • Revenue_Impact: Medium
  • Business_Priority: Should-Have
  • Customer_Journey: Daily-Usage
  • Compliance_Required: No
  • SLA_Related: No

Quality Metrics

  • Risk_Level: Medium
  • Complexity_Level: Medium
  • Expected_Execution_Time: 6 minutes
  • Reproducibility_Score: High
  • Data_Sensitivity: Medium
  • Failure_Impact: Medium

Coverage Tracking

  • Feature_Coverage: 18%
  • Integration_Points: Meter Classification Service, Category Management API
  • Code_Module_Mapped: CX-Web-Dashboard
  • Requirement_Coverage: Complete
  • Cross_Platform_Support: Web

Stakeholder Reporting

  • Primary_Stakeholder: Product
  • Report_Categories: Customer-Segment-Analysis, Module-Coverage, Regression-Coverage
  • Trend_Tracking: Yes
  • Executive_Visibility: No
  • Customer_Impact_Level: Medium

Requirements Traceability

Test Environment

  • Environment: Dev/Staging
  • Browser/Version: Chrome 115+
  • Device/OS: Windows 10/11
  • Screen_Resolution: Desktop-1920x1080
  • Dependencies: Meter Classification Service, Category API, Real-time Update Service
  • Performance_Baseline: Category updates < 500ms
  • Data_Requirements: Meters distributed across categories (Industrial: 3, Residential: 1, Commercial: 2, etc.)

Prerequisites

  • Setup_Requirements: Meters classified across different categories in system
  • User_Roles_Permissions: Meter Reading Supervisor with category data access
  • Test_Data: Known category distribution from wireframe data
  • Prior_Test_Cases: TC_003 for route selection functionality

Test Procedure

Step #

Action

Expected Result

Test Data

Comments

1

Open Create Read Cycle form

Meter Categories section visible in Meter Dashboard with all category types listed

Form access

AC6 - Categories visibility

2

Verify system-wide category distribution display

Industrial: 3, Residential: 1, Unknown: 44, Non-Domestic: 3, Commercial: 2, Domestic: 2727, Non Domestic: 98, Domestic#1: 10

System baseline

AC6 - Initial distribution

3

Verify Meter Categories section visual layout

Categories displayed with house icons, clear labels, and numeric counts aligned properly

Visual verification

AC6 - UI consistency

4

Select route "Read-Book-250" with mixed categories

Meter Categories "Meters in This Cycle" updates to show only categories present in selected route

Route: "Read-Book-250"

AC6 - Route-specific categories

5

Verify category filtering accuracy

Only categories with meters in selected route show non-zero counts, others show 0 or are hidden

Category filtering

AC6 - Accurate filtering

6

Add route "Read-Book-150" with different category mix

Category counts aggregate from both routes, showing combined distribution

Route: "Read-Book-150"

AC6 - Category aggregation

7

Verify residential category tracking

Residential count updates correctly based on residential meters in selected routes

Residential focus

AC6 - Residential accuracy

8

Verify commercial category tracking

Commercial count reflects business/commercial meters in selection

Commercial focus

AC6 - Commercial accuracy

9

Verify industrial category tracking

Industrial count shows heavy usage/industrial meters accurately

Industrial focus

AC6 - Industrial accuracy

10

Test with route containing government meters

Government category appears with appropriate count when route includes government facilities

Government category

AC6 - Government tracking

11

Test with route containing agricultural meters

Agricultural category shows farm/agricultural meter counts accurately

Agricultural category

AC6 - Agricultural tracking

12

Remove routes and verify category reset

Categories return to system-wide view when all routes deselected

Route removal

AC6 - Category reset

13

Verify category totals equal total meters

Sum of all category counts equals "Total Meters" count in dashboard

Mathematical validation

AC6 - Total consistency

Verification Points

  • Primary_Verification: All meter categories show accurate distribution reflecting selected routes
  • Secondary_Verifications: Dynamic updates with route selection changes, category totals reconcile with meter totals
  • Negative_Verification: No missing categories, no double-counting, categories update consistently

Test Results (Template)

  • Status: [Pass/Fail/Blocked/Not-Tested]
  • Actual_Results: [Template for recording actual behavior]
  • Execution_Date: [When test was executed]
  • Executed_By: [Who performed the test]
  • Execution_Time: [Actual time taken]
  • Defects_Found: [Bug IDs if issues discovered]
  • Screenshots_Logs: [Evidence references]

Execution Analytics

  • Execution_Frequency: Weekly
  • Maintenance_Effort: Low
  • Automation_Candidate: Yes

Test Relationships

  • Blocking_Tests: TC_003 (Route selection)
  • Blocked_Tests: TC_012 (Route-specific views)
  • Parallel_Tests: TC_005, TC_018
  • Sequential_Tests: Requires route selection functionality

Additional Information

  • Notes: Important for customer segmentation and billing analysis
  • Edge_Cases: Routes with single category type, uncategorized meters
  • Risk_Areas: Category data synchronization, classification algorithm accuracy
  • Security_Considerations: Category data access permissions, customer information protection

Missing Scenarios Identified

  • Scenario_1: Custom category configuration testing
  • Type: Configuration
  • Rationale: User story mentions dynamic category updates based on onboarding configuration
  • Priority: P3




Test Case 7: Cycle Duration Specification Validation (AC7)

Test Case Metadata

  • Test Case ID: MX02US02_TC_007
  • Title: Verify system allows specification of cycle duration between 1-90 days with comprehensive validation
  • Created By: Hetal
  • Created Date: August 17, 2025
  • Version: 1.0

Classification

  • Module/Feature: Read Cycle Management
  • Test Type: Functional
  • Test Level: System
  • Priority: P2-High
  • Execution Phase: Regression
  • Automation Status: Automated

Enhanced Tags for 17 Reports Support

  • Tags: Happy-Path, Negative, Consumer, Validation, MOD-ReadCycle, P2-High, Phase-Regression, Type-Functional, Platform-Web, Report-Engineering, Report-QA, Report-Regression-Coverage, Report-User-Acceptance, Report-Quality-Dashboard, Customer-All, Risk-Medium, Business-High, Revenue-Impact-Low, Integration-Validation

Business Context

  • Customer_Segment: All
  • Revenue_Impact: Low
  • Business_Priority: Should-Have
  • Customer_Journey: Daily-Usage
  • Compliance_Required: Yes
  • SLA_Related: No

Quality Metrics

  • Risk_Level: Medium
  • Complexity_Level: Low
  • Expected_Execution_Time: 5 minutes
  • Reproducibility_Score: High
  • Data_Sensitivity: Low
  • Failure_Impact: Medium

Coverage Tracking

  • Feature_Coverage: 12%
  • Integration_Points: Validation Service, Form Processing API
  • Code_Module_Mapped: CX-Web-Validation
  • Requirement_Coverage: Complete
  • Cross_Platform_Support: Web

Stakeholder Reporting

  • Primary_Stakeholder: QA
  • Report_Categories: User-Acceptance, Quality-Dashboard, Regression-Coverage
  • Trend_Tracking: No
  • Executive_Visibility: No
  • Customer_Impact_Level: Low

Requirements Traceability

Test Environment

  • Environment: Dev/Staging/Production
  • Browser/Version: Chrome 115+
  • Device/OS: Windows 10/11
  • Screen_Resolution: Desktop-1920x1080
  • Dependencies: Form Validation Service, Client-side validation
  • Performance_Baseline: Validation response < 100ms
  • Data_Requirements: None specific

Prerequisites

  • Setup_Requirements: Create Read Cycle form accessible
  • User_Roles_Permissions: Meter Reading Supervisor with form access
  • Test_Data: Valid and invalid duration values for testing
  • Prior_Test_Cases: TC_001 for form access

Test Procedure

Step #

Action

Expected Result

Test Data

Comments

1

Navigate to Create Read Cycle form

Form loads with Cycle Duration field visible and required

Form access

AC7 - Field availability

2

Verify field label and placeholder

Field labeled "Cycle Duration (days)" with placeholder "0" and asterisk indicating required

UI verification

AC7 - Field labeling

3

Enter minimum valid duration

Field accepts value 1, no validation error, Read Cycle Summary updates to show "1 days"

Duration: 1

AC7 - Minimum boundary

4

Clear field and enter typical duration

Field accepts value 30, no validation error, summary shows "30 days"

Duration: 30

AC7 - Typical value

5

Enter maximum valid duration

Field accepts value 90, no validation error, summary shows "90 days"

Duration: 90

AC7 - Maximum boundary

6

Test zero duration (invalid minimum)

Field shows validation error: "Cycle duration must be between 1 and 90 days"

Duration: 0

AC7 - Invalid minimum

7

Test negative duration

Field shows validation error: "Cycle duration must be a positive number"

Duration: -5

AC7 - Negative validation

8

Test duration above maximum

Field shows validation error: "Cycle duration cannot exceed 90 days"

Duration: 91

AC7 - Invalid maximum

9

Test extremely large value

Field shows validation error: "Cycle duration cannot exceed 90 days"

Duration: 365

AC7 - Large value handling

10

Test non-numeric input

Field shows validation error: "Please enter a valid number"

Duration: "abc"

AC7 - Non-numeric validation

11

Test decimal value

Field accepts value and rounds to nearest integer OR shows validation error for decimals

Duration: 15.5

AC7 - Decimal handling

12

Leave field empty and attempt submission

Field shows required field error: "Cycle duration is required"

Empty field

AC7 - Required validation

13

Enter valid duration and submit form

Form accepts submission with valid duration, cycle created successfully

Duration: 30

AC7 - Successful submission

Verification Points

  • Primary_Verification: Valid durations (1-90) accepted, invalid durations rejected with clear messages
  • Secondary_Verifications: Real-time validation feedback, proper error messaging, form submission prevention
  • Negative_Verification: Form cannot be submitted with invalid duration, all edge cases handled

Test Results (Template)

  • Status: [Pass/Fail/Blocked/Not-Tested]
  • Actual_Results: [Template for recording actual behavior]
  • Execution_Date: [When test was executed]
  • Executed_By: [Who performed the test]
  • Execution_Time: [Actual time taken]
  • Defects_Found: [Bug IDs if issues discovered]
  • Screenshots_Logs: [Evidence references]

Execution Analytics

  • Execution_Frequency: Per-Release
  • Maintenance_Effort: Low
  • Automation_Candidate: Yes

Test Relationships

  • Blocking_Tests: TC_001 (Form access)
  • Blocked_Tests: Scheduling tests using duration
  • Parallel_Tests: TC_019 (Other validations)
  • Sequential_Tests: Can run independently

Additional Information

  • Notes: Foundation validation for business rule compliance
  • Edge_Cases: Boundary values, special characters, copy-paste inputs
  • Risk_Areas: Client vs server-side validation consistency
  • Security_Considerations: Input sanitization, validation bypass prevention

Missing Scenarios Identified

  • Scenario_1: Duration validation with different locale number formats
  • Type: Internationalization
  • Rationale: Global utility companies may use different number formats
  • Priority: P4




Test Case 8: Comprehensive Audit Trail Tracking (AC8)

Test Case Metadata

  • Test Case ID: MX02US02_TC_008
  • Title: Verify system maintains comprehensive audit trail of all actions with timestamps, user details, and immutable records
  • Created By: Hetal
  • Created Date: August 17, 2025
  • Version: 1.0

Classification

  • Module/Feature: Read Cycle Management
  • Test Type: Functional
  • Test Level: System
  • Priority: P1-Critical
  • Execution Phase: Regression
  • Automation Status: Manual

Enhanced Tags for 17 Reports Support

  • Tags: Happy-Path, Consumer, Database, Audit, Compliance, MOD-ReadCycle, P1-Critical, Phase-Regression, Type-Functional, Platform-Web, Report-QA, Report-Engineering, Report-Quality-Dashboard, Report-User-Acceptance, Report-Security-Validation, Customer-All, Risk-High, Business-Critical, Revenue-Impact-Medium, Integration-Audit-Service, Happy-Path

Business Context

  • Customer_Segment: All
  • Revenue_Impact: Medium
  • Business_Priority: Must-Have
  • Customer_Journey: Support
  • Compliance_Required: Yes
  • SLA_Related: Yes

Quality Metrics

  • Risk_Level: High
  • Complexity_Level: Medium
  • Expected_Execution_Time: 10 minutes
  • Reproducibility_Score: High
  • Data_Sensitivity: High
  • Failure_Impact: Critical

Coverage Tracking

  • Feature_Coverage: 25%
  • Integration_Points: Audit Service, Database, User Authentication
  • Code_Module_Mapped: CX-Web-Audit
  • Requirement_Coverage: Complete
  • Cross_Platform_Support: Web

Stakeholder Reporting

  • Primary_Stakeholder: QA
  • Report_Categories: Security-Validation, Quality-Dashboard, User-Acceptance
  • Trend_Tracking: Yes
  • Executive_Visibility: Yes
  • Customer_Impact_Level: High

Requirements Traceability

Test Environment

  • Environment: Dev/Staging
  • Browser/Version: Chrome 115+
  • Device/OS: Windows 10/11
  • Screen_Resolution: Desktop-1920x1080
  • Dependencies: Audit Service, Database audit tables, User session management
  • Performance_Baseline: Audit logging < 200ms
  • Data_Requirements: Existing read cycle "commercial district" for testing

Prerequisites

  • Setup_Requirements: Read cycle exists with audit trail capability enabled
  • User_Roles_Permissions: Meter Reading Supervisor with audit trail viewing rights
  • Test_Data: Existing cycle "commercial district", user "John Smith"
  • Prior_Test_Cases: TC_001 for cycle creation, existing cycle operations

Test Procedure

Step #

Action

Expected Result

Test Data

Comments

1

Navigate to read cycle "commercial district" details

Details page loads with tabs: Details, Routes, Meters, Audit Trail

Cycle: "commercial district"

AC8 - Audit access

2

Click on "Audit Trail" tab

Audit Trail displays with columns: Timestamp, User, Action, Details, Status

Audit Trail tab

AC8 - Audit display

3

Verify creation entry exists

Shows cycle creation entry: "Created read cycle 'commercial district'" with timestamp, user, and success status

Creation audit

AC8 - Creation logging

4

Verify timestamp format accuracy

Timestamp format: "D/M/YYYY, hh:mm:ss am/pm" (e.g., "21/7/2025, 3:45:32 pm")

Time format

AC8 - Timestamp format

5

Perform edit action on cycle

Edit cycle duration from current to new value

Edit: Duration change

AC8 - Edit trigger

6

Check audit trail immediately

New entry appears: "Updated cycle duration from '30' to '45' days" with current timestamp and user ID

Real-time logging

AC8 - Immediate logging

7

Assign route to meter reader

Perform route assignment action

Route assignment

AC8 - Assignment logging

8

Verify assignment audit entry

Entry shows: "Assigned route 'Read-Book-250' to reader 'Emma Johnson'" with complete details

Assignment audit

AC8 - Assignment details

9

Submit meter reading for the cycle

Reading submission action performed

Reading submission

AC8 - Reading logging

10

Check reading submission audit

Entry shows: "Submitted reading for meter 'M123456' - Value: 1250 units" with success status

Reading audit

AC8 - Reading details

11

Report access issue for specific meter

Access issue reported for meter ID

Issue: "M234567 - Gate locked"

AC8 - Issue logging

12

Verify issue logging in audit

Entry shows: "Reported access issue for meter 'M234567': Gate locked" with warning status

Issue audit

AC8 - Issue details

13

Verify chronological order

All entries displayed in descending timestamp order (latest first)

Order verification

AC8 - Chronological sorting

14

Attempt to modify audit entry

Audit entries are read-only, no edit options available

Immutability test

AC8 - Data protection

15

Test audit entry completeness

Each entry contains: Timestamp, User ID/Name, Action type, Detailed description, Status indicator

Completeness check

AC8 - Complete information

Verification Points

  • Primary_Verification: All actions logged with complete information including timestamps and user details
  • Secondary_Verifications: Chronological ordering, immutable records, real-time logging
  • Negative_Verification: Audit entries cannot be modified or deleted, no missing action logs

Test Results (Template)

  • Status: [Pass/Fail/Blocked/Not-Tested]
  • Actual_Results: [Template for recording actual behavior]
  • Execution_Date: [When test was executed]
  • Executed_By: [Who performed the test]
  • Execution_Time: [Actual time taken]
  • Defects_Found: [Bug IDs if issues discovered]
  • Screenshots_Logs: [Evidence references]

Execution Analytics

  • Execution_Frequency: Per-Release
  • Maintenance_Effort: Medium
  • Automation_Candidate: Planned

Test Relationships

  • Blocking_Tests: Existing cycle with operations performed
  • Blocked_Tests: Compliance validation tests
  • Parallel_Tests: TC_014 (Issue logging)
  • Sequential_Tests: Requires operational history

Additional Information

  • Notes: Critical for compliance and troubleshooting
  • Edge_Cases: Concurrent operations, system failures during logging
  • Risk_Areas: Audit service availability, data integrity
  • Security_Considerations: Audit data tampering prevention, access control

Missing Scenarios Identified

  • Scenario_1: Audit trail performance with large operation history
  • Type: Performance
  • Rationale: Long-running cycles may generate extensive audit logs
  • Priority: P3